Net Zero Energy Office Building<br />

Germany, Ruhr region<br />

1st part of <strong>Daikin</strong> nZEB project<br />

Achim Zeller – Athoka GmbH<br />

Ansgar Thiemann – <strong>Daikin</strong> Europe NV<br />

Bart Van Reeth – <strong>Daikin</strong> Europe NV<br />

Public


Public<br />

Overview of the presentation<br />

1. Background … the way towards …<br />

2. <strong>Daikin</strong>’s net Zero Energy Project<br />

3. Net Zero Energy Office Building<br />

4. Experience since building is occupied<br />

°<br />

Environmental Application Research<br />

2


Public<br />

The way towards…<br />

Economic<br />

development<br />

ENERGY<br />

LEGISLATION<br />

BUILDINGS<br />

Global<br />

warming<br />

20% less primary energy use<br />

compared to 2020 projection<br />

Energy<br />

independency<br />

ZERO ENERGY<br />

ENERGY<br />

CHALLENGES<br />

TASKS<br />

CO2 emissions: 20%<br />

reduction by 2020<br />

20% share of renewable<br />

energy sources by 2020<br />

THE PROJECT<br />

EU 20 – 20 – 20 policy<br />

°<br />

Environmental Application Research<br />

3


Public<br />

The way towards…<br />

ENERGY<br />

LEGISLATION<br />

BUILDINGS<br />

ZERO ENERGY<br />

CHALLENGES<br />

20 % less<br />

primary energy<br />

20 % less<br />

CO 2 emissions<br />

1. Ecodesign Directive (criteria under development)<br />

Water heaters, boilers, air conditioners, heat pumps, …<br />

2. Energy labels (addition and revision ongoing)<br />

3. Energy performance of buildings Directive (recast)<br />

4. Ecolabel : the EU ecoflower<br />

5. Energy Service Directive<br />

6. Combined Heat & Power (CHP) directive<br />

7. Regulation on fluorinated greenhouse gases<br />

F gas regulation in force 2011<br />

8. Emission Trading<br />

TASKS<br />

THE PROJECT<br />

20 % share<br />

renewable<br />

energy<br />

9. The Renewable Energy Source directive<br />

Incl. aerothermal, hydrothermal & geothermal energy<br />

°<br />

Environmental Application Research<br />

4


Public<br />

The way towards…<br />

ENERGY<br />

Energy use in building is of high importance + big saving potential<br />

Primary energy consumption with EU<br />

LEGISLATION<br />

BUILDINGS<br />

Source: Eurostat<br />

ZERO ENERGY<br />

CHALLENGES<br />

33% of total energy consumption is<br />

HVAC related<br />

business<br />

TASKS<br />

Estimated energy consumption<br />

reduction potential in 2020<br />

THE PROJECT<br />

Energy Performance of Buildings Directive<br />

°<br />

Environmental Application Research<br />

Source: EU commission 5


Energy<br />

net Zero Energy Buildings using heatpumps<br />

are part of solution for intelligent grids<br />

Public<br />

…even if they are contributing to the trouble by definition:<br />

ENERGY<br />

LEGISLATION<br />

Energy conservation<br />

e.g. insulation, ..<br />

Generation of renewable<br />

energy on site<br />

e.g. Photovoltaic,<br />

wind energy,…<br />

BUILDINGS<br />

ZERO ENERGY<br />

Net ZERO ENERGY BUILDING<br />

Simplified definition:<br />

Produce as much energy (export) as<br />

you use (import) during a <strong>year</strong>.<br />

CHALLENGES<br />

Production<br />

Consumption<br />

TASKS<br />

THE PROJECT<br />

°<br />

Environmental Application Research<br />

winter Summer winter<br />

1 <strong>year</strong><br />

time<br />

6


Capacity<br />

net Zero Energy Buildings using heatpumps<br />

are part of solution for intelligent grids<br />

Public<br />

ENERGY<br />

(MW)<br />

storage Storage period<br />

usage Usage period<br />

LEGISLATION<br />

Overcapacity of<br />

renewable energy<br />

Peaks in demand<br />

BUILDINGS<br />

18x negative<br />

prices at EEX*<br />

Base load power<br />

plant operation 1.<br />

Peak price up to<br />

€1500 / MWh<br />

ZERO ENERGY<br />

*European Energy Exchange<br />

(Germany) 2009<br />

Base load power plant operation 2.<br />

Graph: Italy energy demand on the 01/07/2006<br />

(h)<br />

CHALLENGES<br />

TASKS<br />

Utility companies<br />

Avoid start-up peak plant<br />

Want to cut demand<br />

<strong>Daikin</strong><br />

Guarantee comfort<br />

Possibility to control demand<br />

THE PROJECT<br />

°<br />

Environmental Application Research<br />

net Zero Energy Building<br />

integrated heatpump solution<br />

= access to storage<br />

7


Cost<br />

Public<br />

Target:<br />

Economically feasible net Zero Energy Building<br />

Legislation recast<br />

Current net zero<br />

energy building<br />

ENERGY<br />

Optimum now<br />

LEGISLATION<br />

Total cost<br />

BUILDINGS<br />

Running cost<br />

ZERO ENERGY<br />

CHALLENGES<br />

TASKS<br />

THE PROJECT<br />

Environmental ° Application Research<br />

net Zero<br />

Energy<br />

renewable energy<br />

e.g. photovoltaic<br />

passive measures<br />

e.g. insulation<br />

heatpump e.g. <strong>Daikin</strong> Altherma<br />

Investment cost<br />

net Energy Consumption<br />

simplified model<br />

8


Cost<br />

Current net zero<br />

energy building<br />

ENERGY<br />

Public<br />

Target:<br />

Economically feasible net Zero Energy Building<br />

Legislation recast<br />

use <strong>Daikin</strong> Zeffle IR reflective coating = gain more with less<br />

combine <strong>Daikin</strong> Altherma-VRV = efficiency<br />

Optimum now<br />

LEGISLATION<br />

Research target<br />

nZEB Herten<br />

BUILDINGS<br />

Total cost<br />

Running cost<br />

ZERO ENERGY<br />

CHALLENGES<br />

TASKS<br />

THE PROJECT<br />

Environmental ° Application Research<br />

net Zero<br />

Energy<br />

renewable energy<br />

e.g. photovoltaic<br />

passive measures<br />

e.g. insulation<br />

heatpump e.g. <strong>Daikin</strong> Altherma<br />

Investment cost<br />

net Energy Consumption<br />

simplified model<br />

9


Public<br />

The way towards…<br />

ENERGY<br />

LEGISLATION<br />

BUILDINGS<br />

Current product evaluation / level-up solutions<br />

Gain knowledge on calculation methodology in MS<br />

Inform decision makers in the MS & EU commission<br />

Promote our present solution for nZEB<br />

ZERO ENERGY<br />

CHALLENGES<br />

TASKS<br />

New technology / product evaluation<br />

Prepare economically feasible solution<br />

Get advantage for next calculation methodology in MS<br />

Inform decision makers in the MS & EU commission<br />

THE PROJECT<br />

°<br />

Environmental Application Research<br />

10


Public<br />

ENERGY<br />

LEGISLATION<br />

BUILDINGS<br />

Net Zero Energy Office Building<br />

ZERO ENERGY<br />

CHALLENGES<br />

TASKS<br />

THE PROJECT<br />

°<br />

Environmental Application Research<br />

11


Public<br />

Building concept<br />

Location: Herten, Ruhr region, Germany<br />

Warehouse (1 floor)<br />

Office (2 floors)<br />

°<br />

Environmental Application Research<br />

12


35.5<br />

16.3<br />

Public<br />

Boundary condition: Plans / Blueprints<br />

Warehouse 800 m²<br />

Office<br />

535m² (305m² + 230m²)<br />

51.0<br />

Thermal characteristics:<br />

16.0<br />

Outdoor Wall<br />

Roof<br />

Floor<br />

Windows<br />

0,23 W/m²K.<br />

0,16 W/m²K<br />

0,24 W/m²K<br />

1,30 W/m²K<br />

°<br />

Environmental Application Research<br />

13


Public<br />

Building Zones<br />

Ground Level<br />

°<br />

Environmental Application Research<br />

14


Public<br />

Building Zones<br />

Level 1<br />

°<br />

Environmental Application Research<br />

15


Public<br />

Technical Concept<br />

Heating<br />

Cooling<br />

Ventilation<br />

Lighting<br />

Power generation<br />

Energy-monitoring<br />

<strong>Daikin</strong> Altherma – Air to Water heat pump<br />

with floor heating<br />

VRV – Air to Air heat pump<br />

used for heating<br />

VRV – Air to Air heat pump<br />

Cooling + dehumidification in summer<br />

<strong>Daikin</strong> Altherma<br />

VAM – heat recovery ventilation<br />

Sensible and latent heat recovery<br />

Use of LED-technology for night-lighting and spot-lighting<br />

Thin film Photovoltaic with 27,3 kWp<br />

Building management system<br />

°<br />

Environmental Application Research<br />

16


Public<br />

<strong>Daikin</strong> Altherma<br />

Heat load of the building: 13,3 kW<br />

Ground floor: 7,4 kW for 305m² + 300l DHW<br />

Level 1: 5,8 kW for 240 m²<br />

2 circuits – 2 outdoor units<br />

ERLQ008BAV3<br />

ERLQ007BAV3<br />

HEATING (prim E)<br />

Specific<br />

kWh/m²a<br />

Absolute<br />

kWh/a<br />

44 23.614,48<br />

In comparison with reference building<br />

Ref.<br />

100<br />

nZEB<br />

% ref<br />

52<br />

0 20 40 60 80 100 120<br />

°<br />

Environmental Application Research<br />

17


Public<br />

<strong>Daikin</strong> VRV heat pump<br />

Outdoor unit<br />

Design cool loads:<br />

RXYQ8P8<br />

Nominal cooling<br />

capacity: 22,4 kW<br />

Indoor unit<br />

11 indoor units<br />

Different types<br />

COOLING (prim E)<br />

Specific<br />

kWh/m²a<br />

Absolute<br />

kWh/a<br />

Ref.<br />

In comparison with reference building<br />

100<br />

14,07 7.519,51<br />

nZEB<br />

44<br />

°<br />

Environmental Application Research<br />

% ref<br />

0 20 40 60 80 100 18120


Public<br />

<strong>Daikin</strong> VAM heat recovery ventilation<br />

VAM units<br />

Ground floor<br />

Supply air: 863 m³/h<br />

VAM1000FAVE<br />

Ref.<br />

In comparison with reference building<br />

100<br />

Level 1<br />

Supply air: 400 m³/h<br />

VAM650FAVE<br />

nZEB<br />

% ref<br />

30<br />

0 20 40 60 80 100 120<br />

Efficiency heat recovery: 71,8%<br />

VENTILATION (prim E)<br />

Specific<br />

kWh/m²a<br />

Absolute<br />

kWh/a<br />

6,83 3.650,21<br />

°<br />

Environmental Application Research<br />

19


Energy demand/production<br />

heat demand<br />

Heat pumps are inevitable<br />

Public<br />

- contributing as much as photovoltaic to net Zero Energy Buildings<br />

0<br />

heating<br />

Calculation* in final energy (kWh/a)<br />

generation<br />

-28000<br />

-9.082 .<br />

remark: standard design indoor<br />

temperature in Germany:<br />

heating: 20°C<br />

cooling: Environmental 26°C ° Application Research<br />

cooling<br />

-2.892<br />

hot water<br />

ventilation<br />

lighting<br />

-2.142 -1.403<br />

Renewable<br />

Energy<br />

contribution by<br />

Heatpumps<br />

-6.379<br />

energy<br />

demand<br />

to be<br />

compensated<br />

21.900<br />

>21.900<br />

Renewable<br />

Energy<br />

contribution by<br />

Photovoltaics<br />

Renewable energy<br />

part due to Heatpump<br />

*methodology: non-residential building DIN V 18599<br />

20


Public<br />

Measuring & monitoring<br />

Temperature sensors<br />

- Room temperature<br />

- Ventilation air temperature<br />

- Floor contact temperature<br />

- PV tube temperature<br />

- Outdoor temperature<br />

- Roof temperature<br />

Total more than 500 sensors installed<br />

Duct temp. &<br />

humidity sensor<br />

Thermal radiation<br />

Humidity sensors<br />

- Outdoor humidity<br />

- Room humidity<br />

Strap on temp. sensor<br />

CO 2 sensor<br />

Power meters<br />

- Electricity<br />

Other sensors<br />

- CO2 concentrations<br />

- Solar radiation<br />

- Presence detection<br />

- Window/door contacts<br />

- Weather station<br />

- <strong>Daikin</strong> equipment operation<br />

Environmental ° Application Research<br />

Power meter<br />

Weather station<br />

21


Public<br />

Measuring & monitoring<br />

Sensors:<br />

Measurement &<br />

Visualisation<br />

System<br />

• electronic data recording every 15 min<br />

• Web-based data management<br />

DAIKIN + Research Partners<br />

°<br />

Environmental Application Research<br />

22


Public<br />

Project partners<br />

RESEARCH TOPICS:<br />

Indoor Air Quality / Comfort / Ventilation / Energy saving<br />

Alternative solutions<br />

Potential of <strong>Daikin</strong> concept & environmental impact<br />

Influence of different climates<br />

Monitoring of <strong>Daikin</strong> Altherma-VRV combination<br />

Alternative solutions<br />

Net Zero Energy Building (nZEB) concept<br />

Design alternative concept, modelling in TRNSYS<br />

EnergieForschungRuhr<br />

ef • Ruhr<br />

DuisburgEssenBochumDortmund<br />

Relation of Building Energy Management of<br />

<strong>Daikin</strong> test nZEB and intelligent grid<br />

°<br />

Environmental Application Research<br />

23


Public<br />

First <strong>experience</strong><br />

Building is occupied since 1 st of November 2010<br />

Construction phase: supervision of execution is highly important<br />

Ventilation: installation and commissioning is decisive to reach target efficiency<br />

Calculation of Net Zero Energy Building (nZEB) level accordingly to EPBD,<br />

Energy Performance of Buildings Directive, shows difference to reality<br />

Net Zero Energy Building (nZEB) concept requires good calculation<br />

methodology in order to reach net zero energy level in reality<br />

=> We are on track but not yet economically feasible.<br />

Our target is to learn in phase 1 about how to come to economically<br />

feasible solutions for net Zero Energy Buildings<br />

which reach to zero in reality, only real nZEB will contribute to achieve<br />

EU 20-20-20 targets.<br />

°<br />

Environmental Application Research<br />

24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!