Dike Master Plan - Phase 1 - City of Richmond
Dike Master Plan - Phase 1 - City of Richmond
Dike Master Plan - Phase 1 - City of Richmond
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Future Design<br />
Stonn Surge &<br />
Waves<br />
Raise or<br />
Floodpro<strong>of</strong><br />
Structures<br />
Cumtnt Design Outside <strong>of</strong> <strong>Dike</strong><br />
Storm Surge & \<br />
Wave.<br />
Raise Of'<br />
Floodpro<strong>of</strong><br />
Structures<br />
Outside <strong>of</strong> <strong>Dike</strong><br />
Earth Fill <strong>Dike</strong><br />
Wide, Flat and<br />
Setback<br />
For Stability<br />
Future<br />
expandabllity<br />
. "<br />
"<br />
"<br />
&0 >0<br />
'"<br />
I<br />
Existing <strong>Dike</strong> ROW<br />
LEGEND:<br />
CURRENT DIKE ALIGNMENT<br />
PRIMARY ALIGNMENT 1 - LULU ISLAND ALIGNMENTS<br />
PRIMARY ALIGNMENT 2 - STEVESTON ISLAND<br />
REACH BOUNDARIES<br />
FEDERAUPROVINCIAL OWNED LAND<br />
CITY OVVNED LAND<br />
----<br />
-----<br />
Flood Protection<br />
Improvement Alternatives<br />
Reach 3: Britannia<br />
Option A<br />
EB3763 July 2012<br />
CNCL - 384