13.06.2014 Views

Achieving through Innovation at Newham Improving ... - RM.com

Achieving through Innovation at Newham Improving ... - RM.com

Achieving through Innovation at Newham Improving ... - RM.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Wh<strong>at</strong> is <strong>Achieving</strong> <strong>through</strong> <strong>Innov<strong>at</strong>ion</strong>?<br />

‘<strong>Achieving</strong> <strong>through</strong> <strong>Innov<strong>at</strong>ion</strong>’, a £20-million PFI project, is an eight-year project<br />

involving around 4,200 pupils in thirty primary schools across the London<br />

Borough of <strong>Newham</strong>. It aims to use inform<strong>at</strong>ion and <strong>com</strong>munic<strong>at</strong>ions<br />

technology (ICT) to support learning and teaching, both in school and <strong>at</strong><br />

home, with the ambition of raising pupils’ <strong>at</strong>tainment.<br />

The project, which started in September 2004, is underpinned by two key<br />

themes:<br />

1. Teachers and teaching assistants (TAs) confidently using ICT would save time<br />

on lesson-planning and prepar<strong>at</strong>ion and produce more engaging lessons,<br />

differenti<strong>at</strong>ed for the specific needs of their pupils.<br />

2. Giving portable <strong>com</strong>puters to each pupil, for use both in school and <strong>at</strong><br />

home, would enhance their ICT skills, enrich and personalise their learning<br />

experience and more fully engage both pupils and parents in learning.<br />

Stakeholder engagement with the project<br />

To ensure th<strong>at</strong> schools were both prepared and capable of taking on<br />

such a <strong>com</strong>prehensive change to their teaching and learning, all<br />

schools interested in the project were invited to bid for a place on<br />

the project.<br />

Schools were provided with an overview of wh<strong>at</strong> might be<br />

provided: a <strong>com</strong>prehensive package including software, technical<br />

back-up and teacher training. They were advised th<strong>at</strong> they would<br />

need to contribute financially and were asked to include a<br />

‘provisional approval’ from their chair of governors, to demonstr<strong>at</strong>e<br />

th<strong>at</strong> they were <strong>com</strong>mitted for the full eight years of the project, if their<br />

bid was successful.<br />

“We were <strong>at</strong> the point in<br />

our str<strong>at</strong>egic plan where our<br />

pupils and teachers were highly<br />

skilled in ICT – it was the next<br />

step. The project offered us an<br />

enhanced tool for learning. ”<br />

Shirlyann Jones, Assistant Head<br />

Teacher, Portway Primary<br />

School<br />

In the ‘invit<strong>at</strong>ion to bid’ letter, schools were advised th<strong>at</strong>, to be successful,<br />

they would have to demonstr<strong>at</strong>e why and how they were well placed to<br />

make the project a success in their school. In this way, equal chance was<br />

given to all schools.<br />

The evalu<strong>at</strong>ion panel included a head teacher from a school<br />

uninvolved in the project, Paul Str<strong>at</strong>ton, ICT PFI Project Director,<br />

Graham Pragnell, Head of Educ<strong>at</strong>ion ICT and Dave Lee, member of the<br />

School Development Unit.<br />

Targets for the project<br />

“I would do it the same way<br />

again [school selection] because it<br />

was fair, transparent and robust. It also<br />

provided early sign-up from the school –<br />

including the governors – and has given<br />

the authority inform<strong>at</strong>ion from each school<br />

about why it wanted to be involved – nobody<br />

was forced into joining against better<br />

judgement and, therefore, was less likely<br />

to want to back out <strong>at</strong> a l<strong>at</strong>er d<strong>at</strong>e.”<br />

Paul Str<strong>at</strong>ton, ICT PFI Project Director,<br />

London Borough of <strong>Newham</strong><br />

<strong>Newham</strong> wanted to build on its existing success with ICT and set ambitious<br />

targets for all of those schools involved with the implement<strong>at</strong>ion of the project.<br />

Targets are around:<br />

• raising pupils’ <strong>at</strong>tainment.<br />

• developing individual and independent learning.<br />

• encouraging and developing new teaching and learning models.<br />

• improving school <strong>at</strong>tendance, <strong>through</strong> exciting and interactive lessons.<br />

• recruiting and retaining high-quality teachers.<br />

Key to the success of the project was a significant investment in:<br />

• technology and support for teachers and TAs.<br />

• technology for every child in key stage 2.<br />

Plus involvement of parents in pupils’ home use of the technology.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!