15.06.2014 Views

National Personnel Certification Program For Inspectors ... - iapmo

National Personnel Certification Program For Inspectors ... - iapmo

National Personnel Certification Program For Inspectors ... - iapmo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

examination Contents, references, time Allotment and fees<br />

IAPMO Mechanical Inspector Exam ID: I2 Examination Reference: 2012 UMC<br />

150 Multiple Choice questions Passing grade 75% (minimum each portion)<br />

Closed book questions 100 - 2 hours allowed<br />

Total time allowed 4 hours<br />

Open book questions 50 - 2 hours allowed Examination Fee: $195<br />

% O F E X A M T O P I C<br />

7% Definitions<br />

5% Gas Equipment, Electrical Connections, Condensate Waste and Controls<br />

1% Evaporative Cooling Systems<br />

10% Product Conveying Systems, Terms, Clothes Dryers, Supports,<br />

Clearances, Outlets<br />

11% Commercial Hoods-Kitchen Ventilations, Duct Sizing, Grease Removal,<br />

Exhaust Clearances, Installations, Air Movement<br />

7% Duct Systems, Installation, Materials, Automatic Shutoffs, Supports<br />

9% Combustion Air<br />

9% Chimney and Vent Specifications and Design, Construction, Vent Termination,<br />

Size Category I Vent Systems<br />

12% Installation of Specific Equipment: Central Heating Boilers and Furnaces,<br />

Clothes Dryers, Decorative Appliances, Prohibited Installations, Floor Furnaces,<br />

Household Cooking Appliances, Small Ceramic Kilns<br />

9% Traps Required, Trap Seal Protection, Grease Interceptors Horizontal Distance<br />

of Trap Arm Table, Hydromechanical Grease Interceptors<br />

1% Storm Drainage<br />

12% Gas Piping Systems, Design, Components, Installation, Pressure Testing and<br />

Inspection, Required Gas Piping Size, Sizing Tables<br />

2% Expansion Tanks, Gas Regulators, Automatic Boilers<br />

9% Refrigeration Systems General Requirement, Machinery Rooms, Pressure-limiting<br />

Devices, Detection and Alarm Systems<br />

3% Hydronic Steam and Water Piping, Heat Sources<br />

15% Fuel Piping Terms/Definitions, Gas Piping System Design/Materials/<br />

Components, Connections, Required Gas Supply, Sizing Tables<br />

12<br />

N AT I O N A L P E R S O N N E L C E R T I F I C AT I O N P R O G R A M

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!