Muckamore Abbey Hospital, Antrim - 25 April 2012 - Regulation and ...
Muckamore Abbey Hospital, Antrim - 25 April 2012 - Regulation and ...
Muckamore Abbey Hospital, Antrim - 25 April 2012 - Regulation and ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1.0 Inspection Summary<br />
The unannounced inspection undertaken to <strong>Muckamore</strong> <strong>Abbey</strong><br />
<strong>Hospital</strong> on the 16 February <strong>2012</strong> identified issues of minimal<br />
compliance within st<strong>and</strong>ards 2- 7 of the Regional Healthcare Hygiene<br />
<strong>and</strong> Cleanliness St<strong>and</strong>ards. In line with the follow up process an<br />
unannounced inspection was undertaken on the <strong>25</strong> <strong>April</strong> <strong>2012</strong>.<br />
Inspection Outcomes<br />
The inspection team reviewed the progress <strong>and</strong> found 78 per cent of<br />
the preliminary findings had been addressed. The majority of those still<br />
requiring action were in relation to the cleaning of windows, radiators<br />
<strong>and</strong> sanitary areas, replacement of fittings, maintenance <strong>and</strong> repairs.<br />
On the inspection of 16 February <strong>2012</strong>, 26 recommendations were<br />
made in relation to St<strong>and</strong>ards 2-7, 15 have been addressed, 11 have<br />
been repeated <strong>and</strong> there are 3 new recommendations. The following<br />
area was inspected:<br />
Erne Ward<br />
Improvements <strong>and</strong> Developments since the Previous Inspection<br />
The infection prevention <strong>and</strong> control link nurse on the ward has held<br />
various training sessions with staff following the inspection in February,<br />
this included training on a new nursing cleaning schedule, education on<br />
h<strong>and</strong> hygiene both for patients <strong>and</strong> for staff <strong>and</strong> the introduction of<br />
h<strong>and</strong> hygiene audits.<br />
Staff have been supplied with personal h<strong>and</strong> held alcohol rub<br />
dispensers<br />
New flooring was being laid in corridors during the visit<br />
Key Area for Improvement<br />
The timeframe for repairs <strong>and</strong> replacement of fixtures should be<br />
reviewed to ensure the patient’s living spaces are maintained to an<br />
acceptable st<strong>and</strong>ard.<br />
A summary of the recommendations following the re-audit is listed in<br />
Section 13.<br />
A detailed list of the findings from the re-audit is forwarded to Belfast<br />
Health <strong>and</strong> Social Care Trust within 14 days of the inspection to enable<br />
action on recurring or new areas which have achieved non compliant<br />
scores. The draft report which includes the high level<br />
recommendations in a Quality Improvement Plan is forwarded within 28<br />
days of the inspection for agreement <strong>and</strong> factual accuracy. The draft<br />
1