19.06.2014 Views

TECHNICAL STANDARDS BOARD GOVERNANCE POLICY - SAE

TECHNICAL STANDARDS BOARD GOVERNANCE POLICY - SAE

TECHNICAL STANDARDS BOARD GOVERNANCE POLICY - SAE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technical Standards Board<br />

Governance Policy – 12th Revision – June 2013<br />

<strong>POLICY</strong> TYPE<br />

<strong>GOVERNANCE</strong> PROCESS<br />

1.9 Technical Report Development Process (Continued)<br />

1.9.7 Limited Scope Revision<br />

In order to expedite the revision process so that necessary technical changes in a<br />

document can be made efficiently, a limited scope revision may be performed upon<br />

Committee approval. A limited-scope revision will result in a new revision letter for the<br />

document. Limited scope revisions will be conducted in accordance with the process<br />

outlined in the TSB Governance Policy.<br />

1.9.7.1 Balloting<br />

Limited scope revisions require two levels of balloting (Committee and Council)<br />

using the 28-day ballot process outlined in Section 7 of the TSB Governance<br />

Policy and Procedures. In cases where the procurement process is impacted, a<br />

simultaneous (committee and Council) 14-day affirmation ballot process may be<br />

used with approval from the applicable Council and submittal of a business case.<br />

However, all votes and corresponding comments are confined to the proposed<br />

changes indicated on the ballot. For comments outside the scope of the proposed<br />

changes, the committee participant may request the committee to begin a full<br />

revision of the document.<br />

1.9.7.2 Conditions and Limitations<br />

The following are the conditions and limitations of the limited scope revision<br />

process:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Proposed changes must be of sufficient clarity to communicate directly in a<br />

"Change From Change To" fashion.<br />

The Sponsor must note in the document rationale that the current revision is<br />

limited in scope. The changes to the document must also be listed in the rationale.<br />

All references will be updated in limited scope revisions (does not apply to Limited<br />

Scope for Procurement Need).<br />

Committees will be limited to one limited scope revision per standard before a full<br />

technical revision is required.<br />

A limited scope revision will reset the five-year review clock.<br />

The applicable Council reserves the right to send the document back to the<br />

Committee for a Full Revision.<br />

The Council will consider the number of limited scope revisions as a measure of<br />

the technical committee’s quality of work.<br />

- 20 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!