<strong>Pilarcitos</strong> <strong>Integrated</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong><br />

Species Act. The rehabilitation would have included construction of overflow flumes suitable for<br />

steelhead smolt passage and modification of the outlet structures on one or both Arroyo Leon<br />

Ponds (Johnson Ranch or Giusti) so that they could quickly drain prior to significant forecasted<br />

storm events. The rehabilitation process would have developed operational guidelines and/or<br />

structural improvements to minimize negative impacts while restoring functional rearing habitat.<br />

It would have also secured permits from the California Department of Fish and Game and the<br />

National Marine Fisheries Service to resume operation of the ponds in a manner that would<br />

provide steelhead rearing and would not significantly interfere with fish passage.<br />

This project was rejected by both the California Department of Fish and Game and the National<br />

Marine Fisheries Service. There were a number of agency concerns that could not be overcome<br />

within the constraints of the site and regulatory requirements.<br />

Identified Priority Projects 90 October, 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!