28.06.2014 Views

republic of the philippines - Philippine Center for Investigative ...

republic of the philippines - Philippine Center for Investigative ...

republic of the philippines - Philippine Center for Investigative ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

is a defective contention because none <strong>of</strong> <strong>the</strong> conditions <strong>for</strong> a negotiated<br />

procurement, provided <strong>for</strong> in Section 53 <strong>of</strong> <strong>the</strong> law, exists in this case. 9<br />

31. Even <strong>the</strong> mere circumstance that <strong>the</strong> Northrail project is<br />

financed through a “tied loan” from EXIM Bank under an arrangement<br />

which requires EXIM Bank to nominate/select <strong>the</strong> contractor <strong>for</strong> <strong>the</strong><br />

project to be financed by <strong>the</strong> loan does not help <strong>the</strong> Respondents. Such<br />

an arrangement is by no means among <strong>the</strong> alternative methods <strong>of</strong><br />

procurement enumerated under Section 48 <strong>of</strong> R.A. No. 9184, which<br />

allows exceptions to <strong>the</strong> rule on public bidding; meanwhile, <strong>the</strong> law<br />

contemplates no o<strong>the</strong>r alternative method <strong>of</strong> procurement as an<br />

exception to <strong>the</strong> competitive public bidding requirement; hence, <strong>the</strong> time<br />

honored doctrine <strong>of</strong> expressio unius est exclusio alterius applies.<br />

directly negotiates a contract with a technically, legally and financially capable<br />

supplier, contractor or consultant.<br />

In all instances, <strong>the</strong> Procuring Entity shall ensure that <strong>the</strong> most advantageous price <strong>for</strong><br />

<strong>the</strong> government is obtained.<br />

9 (R.A. No. 9184) Sec. 53. Negotiated Procurement. - Negotiated Procurement shall be<br />

allowed only in <strong>the</strong> following instances:<br />

a. In case <strong>of</strong> two (2) failed bidding as provided in Section 35 here<strong>of</strong>;<br />

b. In case <strong>of</strong> imminent danger to life or property during a state <strong>of</strong> calamity, or<br />

when time is <strong>of</strong> <strong>the</strong> essence arising from natural or man-made calamities or<br />

o<strong>the</strong>r causes where immediate action is necessary to prevent damage to or loss<br />

<strong>of</strong> life or property, or to restore vital public services, infrastructure facilities and<br />

o<strong>the</strong>r public utilities;<br />

c. Take-over <strong>of</strong> contracts, which have been rescinded or terminated <strong>for</strong> causes<br />

provided <strong>for</strong> in <strong>the</strong> contract and existing laws, where immediate action is<br />

necessary to prevent damage to or loss <strong>of</strong> life or property, or to restore vital<br />

public services, infrastructure facilities and o<strong>the</strong>r public utilities;<br />

d. Where <strong>the</strong> subject contract is adjacent or contiguous to an on-going<br />

infrastructure project, as defined in <strong>the</strong> IRR: Provided, however, That <strong>the</strong><br />

original contract is <strong>the</strong> result <strong>of</strong> a Competitive Bidding; <strong>the</strong> subject contract to<br />

be negotiated has similar or related scopes <strong>of</strong> work; it is within <strong>the</strong> contracting<br />

capacity <strong>of</strong> <strong>the</strong> contractor; <strong>the</strong> contractor uses <strong>the</strong> same prices or lower unit<br />

prices as in <strong>the</strong> original contract less mobilization cost; <strong>the</strong> amount involved<br />

does not exceed <strong>the</strong> amount <strong>of</strong> <strong>the</strong> ongoing project; and, <strong>the</strong> contractor has no<br />

negative slippage: Provided, fur<strong>the</strong>r, That negotiations <strong>for</strong> <strong>the</strong> procurement are<br />

commenced be<strong>for</strong>e <strong>the</strong> expiry <strong>of</strong> <strong>the</strong> original contract. Wherever applicable, <strong>the</strong><br />

principle shall also govern consultancy contract, where <strong>the</strong> consultants have<br />

unique experience and expertise to deliver <strong>the</strong> required service; or,<br />

e. Subject to <strong>the</strong> guidelines specified in <strong>the</strong> IRR, purchases <strong>of</strong> Goods from<br />

ano<strong>the</strong>r agency <strong>of</strong> <strong>the</strong> government, such as <strong>the</strong> Procurement Service <strong>of</strong> <strong>the</strong> DBM,<br />

which is tasked with a centralized procurement <strong>of</strong> commonly used Goods <strong>for</strong> <strong>the</strong><br />

government in accordance with Letters <strong>of</strong> Instruction No. 755 and Executive<br />

Order No. 359, series <strong>of</strong> 1989.<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!