07.07.2014 Views

Water booklet single pages.qxd - City of St. George

Water booklet single pages.qxd - City of St. George

Water booklet single pages.qxd - City of St. George

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2 0 0 5 A N N U A L W A T E R R E P O R T<br />

CULINARY WATER<br />

The Culinary <strong>Water</strong> Division is<br />

responsible for operation and maintenance<br />

<strong>of</strong> all <strong>of</strong> the water sources for<br />

the <strong>City</strong> with the exception <strong>of</strong> the<br />

Quail Creek <strong>Water</strong> Treatment Plant<br />

(QCWTP). Sources are located<br />

throughout Washington County and<br />

include both wells and springs.<br />

The Division is also responsible for<br />

maintaining all <strong>of</strong> the transmission<br />

from the various sources including<br />

operating and maintaining the<br />

Regional Pipeline which carries water<br />

from the QCWTP. The combined<br />

pumping capacity for all the wells in<br />

the system is 13,710 gallons per<br />

minute (GPM) or19.7 million gallons<br />

per day (GPD).<br />

This year the Division tackled several major projects.<br />

GUNLOCK WELLS - Total <strong>of</strong> eleven wells<br />

Pulled, inspected and repaired, changed sand trap and fittings.<br />

Changed meters and installed automatic valves.<br />

Installed new submersible pump.<br />

Flushing regional pipeline to disinfect it<br />

prior to putting into service<br />

SNOW CANYON WELLS - These facilities are jointly owned by the cities <strong>of</strong> <strong>St</strong>. <strong>George</strong>, Ivins and Santa<br />

Clara. The <strong>City</strong> <strong>of</strong> <strong>St</strong>. <strong>George</strong> owns approximately 80% <strong>of</strong> this system and is the operating agent.<br />

Installed new submersible pump.<br />

Pulled pump and repaired air line.<br />

LEDGES WELL<br />

Drilled a new well which produces 900 gallons per minute (GPM)<br />

LITTLE VALLEY PUMP STATION<br />

Changed the motor s<strong>of</strong>t starts. This prevents a water hammer from forming when pumps<br />

are started and shut down.<br />

1 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!