1. Overview ............................................................................................................. 3<br />

2. Process ............................................................................................................... 3<br />

3. <strong>Mount</strong> <strong>Magnet</strong> as a Community ........................................................................... 3<br />

4. Existing Facilities ................................................................................................. 4<br />

4.1. Summary of Facility Condition ............................................................................. 9<br />

5. Stakeholder engagement ................................................................................... 10<br />

6. Design intent...................................................................................................... 10<br />

7. Order of Probable Cost ...................................................................................... 11<br />

8. <strong>Master</strong> <strong>Plan</strong> ....................................................................................................... 13<br />

9. Appendix 1 – Moloney Asset Condition Rating system ...................................... 15


CCS Strategic takes pleasure in submitting this <strong>Master</strong> <strong>Plan</strong> for the <strong>Mount</strong> <strong>Magnet</strong><br />

<strong>Recreation</strong> <strong>Precinct</strong>.<br />

The detail of the report is provided in the drawings and the associated cost schedules which<br />

have also been provided in electronic form.<br />

The study process used to inform the design of the master plan involved:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

A review of background materials including previous studies, reports and publications<br />

The preparation of a series of project display panels presenting design and<br />

development ideas to assist in the consultation program<br />

An extended visit to <strong>Mount</strong> <strong>Magnet</strong> from Friday to Monday inclusive to allow for:<br />

o<br />

o<br />

o<br />

o<br />

o<br />

o<br />

Site inspection and audit of existing infrastructure<br />

Meetings with key stakeholders including the local school students subsequently<br />

the staff, local aboriginal corporation, shire staff and elected members<br />

A shopping precinct display and community interaction session on Saturday<br />

morning<br />

An open community workshop on Saturday evening at the recreation centre<br />

An aquatic centre display and community interaction session on Sunday<br />

afternoon<br />

Further site inspections and investigation and a meeting with the Visitor’s Centre<br />

Manager on Monday<br />

Follow up enquiries with local stakeholders<br />

Development of a series of draft master plan design option and discussion with <strong>Shire</strong><br />

representatives<br />

Refinement of the design options to the master plan presented in consultation with the<br />

quantity surveyor and product suppliers<br />

Preparation of a detailed cost schedule<br />

Presentation of the draft master plan to the shire councillors via teleconference<br />

Refinement of the plans, cost schedules and report based on feedback<br />

Presentation of the final report and plans.<br />

<strong>Mount</strong> <strong>Magnet</strong> is located 573 km northeast of Perth via the Great Northern Highway and<br />

was developed in the late 1890’s in support of very strong pastoral and mining industries.<br />

Today the township is in decline with the surrounding pastoral district suffering ongoing<br />

hardship from drought and wild dogs and mining activity reduced to only a few mines.


The <strong>Shire</strong> of <strong>Mount</strong> <strong>Magnet</strong> is currently home to a population of around 640 people of which<br />

36% are Aboriginal 1 . Within the township there are some 530 residents of which 43% are<br />

Aboriginal, acknowledging the largely non-indigenous population living on the surrounding<br />

pastoral stations.<br />

The WA <strong>Plan</strong>ning Commission 2 forecasts a decline in the local population by as much has<br />

half by 2026. The chart below demonstrates the predicted change in the population profile<br />

from 2006 to 2026 with every age cohort declining sharply, except for the very few residents<br />

aged over 75 which is expected to remain constant.<br />

The number of young children will decline dramatically and although youth numbers will fall,<br />

the drop is not nearly as severe. The cohort of school aged children is anticipated to be<br />

predominantly aboriginal and will need to be serviced.<br />

<strong>Mount</strong> <strong>Magnet</strong> is serviced by a comprehensive range of community facilities. These<br />

facilities have been the subject of a visual inspection and audit using the Moloney Asset<br />

Condition Rating system. This system provides for a subjective alpha numeric assessment<br />

of the current condition and serviceability of the asset.<br />

A full description of the Moloney scale is included in appendix 1. In essence the lower the<br />

number the better the facility. A score of zero indicates a brand new facility and score of 10<br />

describes a facility that should be removed from service and most likely demolished. The<br />

fitness for purpose or ability of a facility to deliver the services intended is classified in the<br />

range of A to D. Highly suitable facilities that meet service delivery requirements fully are<br />

ranked A and facilities that completely fail to service need are ranked D:<br />

The inventory and audit scores of <strong>Mount</strong> <strong>Magnet</strong>’s community facilities is shown below.<br />

1<br />

ABS Census 2011<br />

2<br />

Western Australia Tomorrow Population Report No.7 2006 to 2026, February 2012.


Facility<br />

Rural Transaction Centre<br />

Condition<br />

9C<br />

Library<br />

9C<br />

Youth Drop-in centre<br />

9C<br />

Local radio station<br />

3B<br />

Foster Park<br />

4B


Anzac Memorial (town) Hall<br />

5B<br />

Outdoor Cinema (picture gardens)<br />

6C<br />

Seniors Centre<br />

7C<br />

Basketball courts (2)<br />

6B<br />

Basketball court shelter<br />

4B


Full size AFL<br />

and cricket oval<br />

(synthetic pitch)<br />

3A<br />

Cricket practice nets (2)<br />

9D<br />

Tennis courts (4)<br />

10D<br />

Tennis court shelter<br />

7C<br />

Playground<br />

9D


<strong>Recreation</strong> centre<br />

5B<br />

Squash courts (2)<br />

5B<br />

Skatepark<br />

8C<br />

BMX track<br />

7C<br />

Fire brigade running track<br />

9D


Swimming pool - 5 lane 25m and<br />

toddlers pool - outdoor /seasonal<br />

3A<br />

Fitness centre gym – within the<br />

swimming pool compound<br />

Museum<br />

Visitor’s Centre – within the<br />

Museum building<br />

0A<br />

1A<br />

0A<br />

The <strong>Shire</strong> boasts a range of new and recently upgraded facilities at the southern end of<br />

town comprising the museum, visitors centre and aquatic centre.<br />

Community amenities within the central section of town comprise the town hall (Anzac<br />

Memorial Hall), outdoor cinema and seniors centre. In general these facilities are old and’,<br />

whilst serviceable to some degree, could all be dramatically improved to contemporary<br />

standards. The town’s main parkland on the main street (Foster Park) is a small pocket of<br />

green in the landscape and could be considerably improved for both aesthetic and<br />

functional purposes.<br />

The Rural Transaction Centre building on Naughton Street (also housing the Library, Radio<br />

Station, Op Shop and Youth Centre) is stricken by structural decline and requires major<br />

restoration if it is to be maintained in a state fit for ongoing use.<br />

The main recreation precinct comprising the recreation centre and squash courts, oval and<br />

hard courts and BMX track and skatepark is in a varying states of repair and dereliction.<br />

The recreation centre and squash courts building is in sound condition and quite functional<br />

and the oval irrigation system has recently been upgraded to provide an improved, quality<br />

surface. The two hard courts near the school catering for basketball and tennis are in<br />

reasonable condition although it wold appear the little tennis is played, hindered by the<br />

process required to secure the net posts and nets.<br />

The four old tennis courts are totally derelict and would be dangerous to use. They have<br />

been effectively decommissioned but the surface should be removed.<br />

The BMX track is in varying states of repair and is still useable as is the concrete skatepark,<br />

however, the latter is far from contemporary in design. Leading skatepark construction<br />

company CONVIC have assessed the facility from photographic records provided, and<br />

advise that the facility is unsuitable for renovation.


A range of stakeholder engagements were<br />

conducted during the study process and<br />

importantly included a workshop session with<br />

the students at the school. Nearly all of the<br />

children in the school indicated that they<br />

owned a bicycle and would be interested in<br />

riding on a new skate/bike track. A much<br />

lesser number indicated ownership of a<br />

skateboard, however, they would be keen to<br />

acquire a skateboard if there were new<br />

facilities to ride on.<br />

As a group, the secondary school students<br />

expressed a desire to have a place in which<br />

they could gather, conduct dances and play<br />

their music. A broadcast system capable of<br />

playing their music (captured on their iPod or<br />

smart phone) was highly valued. Other<br />

important consultation sessions involved<br />

mounting a display and encouraging informal<br />

interaction on Saturday morning in the<br />

shopping precinct and on Sunday afternoon<br />

at the aquatic centre.<br />

The display panel shown to the right is one of<br />

a series used to attract attention and provide<br />

a stimulus to conversation.<br />

Even though the concept drawings that comprise the <strong>Master</strong> <strong>Plan</strong> and the cost estimates<br />

that detail the order of probable cost are intended as comprehensive stand-alone<br />

documents, there are elements that would benefit from some further explanation.<br />

<br />

<br />

<br />

<br />

<br />

<br />

The <strong>Master</strong> <strong>Plan</strong> focuses on the main recreation precinct in town adjacent to the school<br />

and comprising the recreation centre, oval, hard courts, BMX track and skatepark.<br />

Other facilities, particularly the swimming pool and fitness centre, are an integral part of<br />

the suite of leisure facilities on offer in the township.<br />

The further development of facilities such as Foster Park on the main street, Barimaia<br />

Creek in the centre of town, the town hall and the outdoor cinema are further addressed<br />

in a separate report dealing with town streetscape and general amenity.<br />

Most importantly, it must be noted that the work done to date on the concepts for the<br />

<strong>Recreation</strong> <strong>Precinct</strong> are just that – concepts only.<br />

There will need to be a process of ongoing and in some instances detailed design<br />

development to enable implementation. This relates in particular to the detailed design<br />

of the skatepark and shade structures in the area including the cover over the hard<br />

courts.<br />

That said, and with respect to some of the less complex items, if the concepts proposed<br />

and illustrated are accepted by the Council, much of the work could be readily<br />

implemented through order placement with a prescribed supplier.


Installation could be carried out by <strong>Shire</strong> staff or local contractors, or perhaps through<br />

local community involvement. This opportunity relates to the purchase and installation<br />

of post and rail perimeter fencing, exercise and playground equipment, signage and bin<br />

enclosures and the proposed graffiti wall.<br />

The rammed earth hit-up wall at the old tennis courts is intended to be reinstated. This<br />

feature could be further enhanced by the installation of a series of art canvases<br />

(actually 1800 x 900mm sheets of marine ply or similar) onto which the local youth can<br />

apply graffiti. If the youth (collectively) agree that a panel of graffiti art is worthy of<br />

preservation it can be removed, preserved by an application of varnish or other sealant<br />

and set on permanent display. Locations could include the inside of the picture gardens<br />

wall, within the proposed youth centre building or even at the visitors centre. The<br />

designs could also be used as the art work for the banners for the Main Street banner<br />

poles.<br />

Note that the graffiti canvases need not be applied to the hit-up wall. They could also be<br />

applied in other locations such as the tennis courts fence or as part of the proposed<br />

skatepark shade structure. They key is to activate the space with a program designed<br />

to bring youth to the site and offer an opportunity to get involved in an activity that<br />

makes a positive contribution to the site. The graffiti art work can also be applied to the<br />

skatepark itself.<br />

The cost schedules provided in spreadsheet format give an order of probable costs to<br />

install each component of the concept plan. The estimates have been developed by a<br />

quantity surveyor working from the concept plans and in discussion with the Principal of<br />

CCS Strategic for further detail and interpretation.<br />

The forecast costs are anticipated to be adequate to deliver each component, installed in a<br />

condition for use, except where local content such as artistic input is required. The<br />

schedules have been developed on an item by item and location by location basis, inclusive<br />

of project on-costs, allowing the projects to be staged.<br />

The project on-costs included in the schedules account for professional fees, site<br />

preliminaries, and design and construction contingencies as required. Locality loadings for<br />

the remoteness of <strong>Mount</strong> <strong>Magnet</strong> have been included in unit rates or allocated separately<br />

as appropriate, providing for cost to deliver on site in <strong>Mount</strong> <strong>Magnet</strong>.<br />

We have anticipated that minor works items will be able to be undertaken using local<br />

tradespeople and local or <strong>Shire</strong> labour. Major items such as the skatepark, youth centre<br />

and shelter over the new tennis courts will be undertaken by external contactors bringing<br />

materials and expertise to town. Their on-costs for travel and accommodation have been<br />

anticipated in the rates used.<br />

If some of this work could be done locally there exists the potential to reduce costs.<br />

The overall cost to implement all aspect of the recreation precinct concept plan as shown is<br />

summarised in the following table.<br />

Note that not all items need to be done at once and not all items need to be done in full.<br />

The items can be addressed selectively and also staged.


MOUNT MAGNET<br />

RECREATION PRECINCT MASTER PLAN<br />

Item<br />

Multi-marked courts refurbished<br />

Description<br />

Page 1 - item 1 - ongoing maintenance of<br />

existing courts<br />

Total cost<br />

(2013$)<br />

27,300<br />

New court hire signage Page 1 - item 2 - to be fixed to court shelter 27,300<br />

Exercise equipment around oval -<br />

based on Forpark manufactured<br />

items<br />

Page 1 - item 3 - includes for supply and<br />

installation of 5 pieces shown plus an area<br />

of softfall around each item<br />

16,028<br />

Ecowood post and rail barriers to<br />

prevent vehicle access to oval<br />

Allowance for signage to exercise<br />

equipment etc<br />

Remove defunct tennis court<br />

surface (4 off)<br />

Page 1 - item 4 - 1.5m posts and 3.6m rails<br />

separated by a space of 1.6m<br />

27,300<br />

3,250<br />

Page 2 - item 1 11,250<br />

Repair rammed earth ‘hit up’ wall Page 2 - item 2 1,000<br />

Install new bitumen surface for off<br />

court practice on hit-up wall<br />

Install new acrylic surface to 2<br />

southern courts<br />

Cover over new tennis courts<br />

Play area replaced and upgraded<br />

with new equipment<br />

Existing tennis shelter refurbished<br />

and made double sided<br />

Page 2 - item 3 - hot bituminous concrete<br />

and road base<br />

Page 2 - item 4 - includes new sub-base<br />

and topping<br />

Page 2 - item 5 - lightweight roof structure<br />

and lighting<br />

11,340<br />

106,313<br />

677,250<br />

Page 2 - item 6 - provisional sum allowance 49,000<br />

Page 2 - item 7 2,000<br />

New drinking fountain Page 2 - item 8 3,500<br />

New skate park with more<br />

elements and partial shade cover<br />

Remediate existing skate park as<br />

BMX space<br />

New self-contained toilet block to<br />

service youth precinct and tennis<br />

courts<br />

Historic railway platform<br />

stonework and surface to be<br />

refurbished and made sound.<br />

New electrical supply to skate<br />

area for music and events<br />

Total cost if implemented in<br />

2013-14<br />

Page 2 - items 9 and 10 - provisional sum<br />

allowance<br />

Page 2 - item 11 - provisional sum<br />

allowance<br />

Page 2 - item 12 - WALGA approved<br />

Landmark model toilet block<br />

Allow for use as a stage and as a skate<br />

elements - add protective metal edge strip<br />

- stone repairs by others - not costed<br />

includes supply cable and lockable<br />

switchboard<br />

200,000<br />

14,625<br />

98,983<br />

6,500<br />

6,500<br />

$ 1,289,438