Once the extension of the No 2 Vermin Fence is completed it is expected to join up with a<br />

further 380 km of new vermin fencing which is proposed to link up with the State Barrier<br />

Fence thus creating the Murchison Region Vermin Exclusion Cell. The following plan shows<br />

the layout of proposed fencing works.<br />

Existing No 2<br />

Vermin Fence<br />

(72km)<br />

100km CLGF application (between<br />

these two points)<br />

The 380 kilometres to<br />

complete the cell is between<br />

these two points (MWDC )<br />

application<br />

No 1 Vermin Fence<br />

(existing)<br />

State Barrier Fence<br />

(existing)<br />

The additional 380km of fencing required to complete the Cell is expected to be funded<br />

under the Mid West Development Commission Investment <strong>Plan</strong>.