KP14 - On Right to Repair, the figures will improve once the manual editing is<br />
carried out to exclude communal repairs<br />
KP16 - The dip in tenants satisfied with jobs completed is unexpected. This<br />
applies to Connaughts only. There is currently a dialogue taking place with<br />
Connaughts as we expect them to examine the reasons given by tenants for<br />
dissatisfaction, and identify specific areas where action needs to be taken.<br />
KP17 - The present figure for gas safety certificates is better than last year at<br />
the same point in the service cycle, and we fully anticipate achieving very close<br />
to 100% by the end of the service year.<br />
It is important to celebrate successes as well as examine shortfalls.<br />
Particularly good performances this month are:<br />
• KP4<br />
• KP11<br />
Occupancy rate for hostels<br />
Anti-social behaviour cases successfully resolved<br />
7.11<br />
We are currently receiving more referrals from <strong>South</strong>end BC for our hostels<br />
to add to the places reserved for children leaving care, which has led to the<br />
highest occupancy rate recorded for two years. The high ASB figure offsets<br />
the low figure for April, and reflects the actions taken by Neighbourhood<br />
Services to improve procedures.<br />
8 Empty Properties<br />
8.1 The key performance indicator we use to measure performance is the overall<br />
turnaround time. This is the total time from the tenancy termination date to<br />
the new tenancy date for ordinary voids (expressed in calendar days), and<br />
the time from ready to let date to new tenancy date where the property has to<br />
undergo major works.<br />
8.2 Overall void turnaround time is made up of three components<br />
• Initial administration<br />
• Repairs time<br />
• Letting time<br />
8.3 The first stage is usually very short - and can actually be negative if the keys<br />
are returned to us before the due date. Figures for the other 2 stages are<br />
given in the table below<br />
Target 2008/9 April May<br />
Overall turnround 26 days 25.3 27.5 27.7<br />
Repairs time 19 days 20.1 22.1 27.1<br />
Lettings time 8 days 5.9 11.3 8.1<br />
8.4 The total of repairs time and lettings time will be greater than the overall<br />
turnaround time where major works properties have been relet, as these have<br />
an effective repairs time of zero.<br />