Annual Report <strong>2010</strong>-<strong>2011</strong><br />
Venture structuring. The said project is under planning stage. Preliminary activities for land<br />
acquisition is in progress. Matter taken up with WRD for requirement 40 MM 3 water for this<br />
project. For grant of long term coal linkages, follow up is going on with Ministry of Coal, CEA.<br />
9. Coal based Thermal Power Project near Manora (Tal. Tiroda, Dist. Gondia) (2 x 660 MW):<br />
The said project is under planning stage. Preliminary activities for land acquisition is in progress.<br />
WRD has informed its inability to meet the water requirement of 40 MM 3 water for this project<br />
from proposed barrage on Wainganga river near Mendhri (Khairi). For grant of long term coal<br />
linkages, follow up is going on with Ministry of Coal, CEA.<br />
10. Coal based Thermal Power Project in Mendki (Tal. Brahmapuri, Dist. Chandrapur)<br />
<strong>Mahagenco</strong> has proposed to go in for installation of 2x660 MW Units in Mendki by way of Joint<br />
Venture structuring. The said project is under planning stage. Preliminary activities for land<br />
acquisition is in progress. Matter taken up with WRD for the requirement of 40 MM 3 water for<br />
this project. For grant of long term coal linkages, follow up is going on with Ministry of Coal,<br />
CEA.<br />
SUBSIDIARIES AND JOINT VENTURES<br />
Mahaguj Collieries Ltd.- The company is a joint venture between your company and Gujarat State Electricity<br />
Co Ltd. for captive mining of coal blocks at Machchakata. The Company has appointed Mine Developer cum<br />
Operator for executing the project. The vital preliminary activities like acquisition of land, various Govt<br />
clearances has been started. The Govt. of Orrissa has granted approval for acquisition of land for the project.<br />
Coal Mining Service Agreement between MDO i.e M/s Adani Enterprises Ltd and Mahaguj Collieries Ltd for<br />
30 MTPA coal has been signed on 6th May <strong>2010</strong>.<br />
Considering the availability of coal reserves the Ministry of Coal has directed to increase the Mine capacity of<br />
Machchakata coal block from 30 MTPA to 50 MTPA. Accordingly Board of Mahaguj Collieries Ltd has<br />
approved increase in capacity of Mines from 30 MTPA to 50 MTPA.<br />
Maharashtra State Power Generation Co. Ltd.<br />
Dhule Thermal Power Co. Ltd.- This company has been incorporated to implement various Thermal Power<br />
Projects as green field project under case-2 as per the guidelines of Ministry of Power, Government of India.<br />
During the year there was no activity in this company.<br />
UCM Coal Company Ltd. – The UCM coal Company Ltd is a JV company between your company and<br />
Uttarpradesh Rajya Vidyut Uttpadan Nigam Ltd. (UPRVUNL) and Chattisgarh Mineral Development Corporation<br />
(CMDC) to share the output of Coal to be generated from Chendipada and Chendipada II coal blocks.<br />
INITIATIVES TAKEN FOR NON COVENTIONAL ENERGY RESOURCES (SOLAR BASED POWER<br />
PLANT)<br />
Chandrapur 1 MW Solar PV Power Projects: In line with the guidelines issued in Jan 2008 by Ministry of<br />
new and Renewable Energy (MNRE), Govt. of India, <strong>Mahagenco</strong> has set up 1 MW Solar PV power project at<br />
Chandrapur in the premises of Chandrapur Super Thermal Power Station. The project is commissioned on 9th<br />
April <strong>2010</strong> and it is feeding electricity to the grid. <strong>Mahagenco</strong> is receiving generation Based Incentive (GBI)<br />
for this project from NMRE. This is first grid connected solar project in Maharashtra and second in India.<br />