Annual Report <strong>2010</strong>-<strong>2011</strong><br />
Empowered Group of Ministers (EGoM), Gas Allocations, had allocated 1.00 MMSCMD of Natural Gas<br />
to GTPS, Uran.<br />
<strong>Mahagenco</strong> has entered into Gas Supply & Purchase Agreement (GSPA), with M./s Reliance Industries<br />
Ltd.(RIL) for supply of natural gas from its field in the Krishna Godavari (KG) basin at $4.205 per<br />
MMBTU at ex- Kakinada (AP). <strong>Mahagenco</strong> has signed this GSPA with M/s RIL & M/s NIKO on dt.<br />
21.04.2009, for supply of 1.00 MMSCMD RLNG for GTPS, Uran (Existing), for the period of five year.<br />
(i.e. 22.04.2009 to 21.04.2014).<br />
<strong>Mahagenco</strong> has also entered into Gas Transmission Agreement with M/s. Reliance Gas Transmission<br />
Infrastructure Ltd (RGTIL), on 21.04.09, for transmission of gas through East-West pipline from Kakinada<br />
to GTPS, Uran via Maskal at the connecting point of EWPL (RGTIL) and DUPL (GAIL) spur piplines<br />
for the next five years i.e. upto 31.03.2014.<br />
Ministry of P&NG allocated additional 0.4 MMSCMD on FIRM BASIS for Uran plant. <strong>Mahagenco</strong> signed<br />
amendment orders with RIL & NIKO on dtd 10.04.<strong>2010</strong> for supply of additional 0.4 MMSCMD gas on<br />
firm basis for Uran existing plant. <strong>Mahagenco</strong> signed said letter to Gas Transportation Agreement regarding<br />
transportation of 45001 MMBTU (1.40MMSCMD) on firm basis from 21.04.<strong>2010</strong>.<br />
After reviewing the power generation schedule of GTPS, Uran, <strong>Mahagenco</strong> has requested M/s RIL to<br />
reduce the firm DCQ from 45001 MMBTU (@ 1.40MMSCMD) to 38572 MMBTU (@ 1.20MMSCMD).<br />
M/s RIL vide letter dtd 13.11.<strong>2010</strong> has revised firm DCQ from 45001 MMBTU to 38572 MMBTU with<br />
effect from 1.11.<strong>2010</strong>.<br />
COAL/ FUEL SUPPLY AGREEMENTS (CSA/FSA):<br />
a) Coal Supply Agreement with M/s WCL- FSA with WCL as per New Coal Distribution Policy is signed<br />
on 21 Nov. 2009 w.e.f 01.04.2009 for ACQ 22.701 Million MT for the period of 20 years, can be reviewed<br />
after five year.<br />
b) Coal Supply Agreement with SECL- <strong>Mahagenco</strong> has signed FSA as per New Coal Distribution Policy on<br />
26 June 2009 for ACQ 6.027 Million MT for the period of 20 years, can be reviewed after five years.<br />
Maharashtra State Power Generation Co. Ltd.<br />
c) Coal Supply Agreement with MCL- <strong>Mahagenco</strong> has signed the FSA as per New Coal Distribution Policy<br />
on 26 June 2009 for ACQ 6.172 Million MT for the period of 20 years, can be reviewed after five years.<br />
d) Coal Supply Agreement with SCCL- <strong>Mahagenco</strong> has signed revised new FSA as per New Coal Distribution<br />
Policy on 05 March 2009 for ACQ 2.26 Million MT w.e.f 01.04.2009 for the period of 5 years, can be<br />
reviewed after three years.<br />
Disputes in signing FSA with MCL :<br />
The Ministry of Coal, Government of India, has sanctioned long term coal linkages (‘F’ grade) from Mahanadi<br />
Coalfield Limited (MCL) for new thermal power projects of the <strong>Mahagenco</strong>. As directed by Coal India Limited<br />
(CIL), <strong>Mahagenco</strong> had signed MoU for coal supply to Parli-7, Paras-4 and Khaperkheda-5 units.<br />
<strong>Mahagenco</strong> intends to sign FSA with M/s MCL in accordance with the standard draft approved by CIL for long<br />
term coal linkages to Parli-7 (250 MW), paras-4 (250 MW), Khaperkheda unit 5 (500MW) and Bhusawal units<br />
4&5 (2×500 MW) projects. <strong>Mahagenco</strong> has conveyed its willingness for signing of FSA with M/s MCL as per<br />
quantity allocated by CIL.<br />
17