WWFM_Hill Stations Study Vol2_2001.pdf - Sdn Bhd - WWF Malaysia
WWFM_Hill Stations Study Vol2_2001.pdf - Sdn Bhd - WWF Malaysia
WWFM_Hill Stations Study Vol2_2001.pdf - Sdn Bhd - WWF Malaysia
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Study</strong> on the Development of <strong>Hill</strong> <strong>Stations</strong><br />
Final Report II<br />
LIST OF ACTION PLANS<br />
Action Plan : PH-AP4<br />
Stakeholder Action : Majlis Perbandaran Pulau Pinang<br />
MPPP should redevelop the hawker centre. It is recommended that the<br />
redevelopment of the Hawker Centre accommodate food stalls or restaurants,<br />
handicraft and souvenir centres, information kiosk, etc. Products such as nutmegs,<br />
paintings, batik, kite, key chains, stickers, brassware depicting Penang <strong>Hill</strong> historical<br />
heritage, etc. have the potential to be sold-out attractions to the visitors. It is also<br />
proposed that the redevelopment of the Hawker Centre to consider and adopt the<br />
cultural village concept.<br />
Action Plan : PH-AP5<br />
Stakeholder Action : Majlis Perbandaran Pulau Pinang<br />
The Tea Kiosk at the Strawberry <strong>Hill</strong> should be reopened and with its operation<br />
based on the recommended guidelines in the Local Plan. The Local Plan has<br />
proposed that the Tea Kiosk be developed to provide mid range type of restaurants<br />
and tourist facilities. The forecourt area of the Tea Kiosk shall be developed into<br />
restaurant terraces.<br />
Action Plan : PH-AP6<br />
Stakeholder Action : Majlis Perbandaran Pulau Pinang<br />
MPPP should establish souvenir and food stalls at the lower station area,<br />
besides establishing public amenities such as resting/waiting areas, public facilities<br />
and conveniences and the proposed transportation terminal. MPPP shall ensure<br />
that the commercial centre be developed in accordance with the historical value of<br />
Penang <strong>Hill</strong> railway character and present surroundings.<br />
Action Plan : PH-AP7<br />
Stakeholder Action : Department of Agriculture<br />
DOA should encourage the farmers to switch to cultivating perennial crops,<br />
such as durian, mangoesteen, etc. rather than maintaining the present short-term<br />
crops.<br />
Action Plan : PH-AP8<br />
Stakeholder Action : Majlis Perbandaran Pulau Pinang<br />
MPPP shall implement a <strong>Hill</strong> Heritage Park Development Programme. This<br />
could encompass:<br />
• Designation of heritage buildings into two categories, viz., I + II. For category<br />
I, no demolition, alteration or extension of the building, other than development<br />
or works necessary for restoring it to, and maintaining it in, a proper state of<br />
repair be permitted. For Category II, the existing external appearance of<br />
buildings shall be preserved and no alteration to any part of the façade shall be<br />
permitted, other than works necessary for restoring it to, and maintaining it in, in<br />
a proper state of repair. The recommended listing for heritage buildings is<br />
shown in Appendix 2 of the Local Plan.<br />
<strong>WWF</strong> <strong>Malaysia</strong> A- 2<br />
December 2001