1 transmission services from the third-party transmission provider. PacifiCorp's<br />

2 recent experience with the Threemile Canyon Wind Farm 1, LLC illustrates the<br />

3 incremental costs that are involved.<br />

4 Threemile Canyon Wind 1, LLC.<br />

5 10. Dalreed is a PacifiCorp load pocket near Arlington, Oregon.<br />

6 PacifiCorp's load at the Dalreed substation ranges from about 44 MW peak during<br />

7 the summer down to less than 2 MW during the winter. PacifiCorp imports energy<br />

8 to Dalreed across BPA transmission under the General Transfer Agreement between<br />

9 Bonneville <strong>Power</strong> Administration and PacifiCorp (BPA Contract No. DE-MS79-<br />

10 828P90049) dated May 4,1982 (the "BPA GTA"). The BPA GTA makes no provision<br />

11 for energy exports out of the Dalreed load pocket because historically there was no<br />

12 generation in the load pocket requiring export.<br />

13 11. Threemile Canyon Wind I, LLC (Threemile) is a 9.9 MW wind QF that<br />

14 is interconnected with PacifiCorp's Dalreed substation near Arlington. In 2009,<br />

15 PacifiCorp evaluated how much excess generation was likely at Dalreed, based on<br />

16 actual Dalreed 2006-2008 hourly load and an hourly generation forecast provided<br />

17 by Threemile. The study predicted excess generation conditions between 1,020 and<br />

18 1,289 hours per year, involving between 8% and 10.5% of total Threemile output.<br />

19 The study showed likely recurring periods of excess generation during winter<br />

20 months, necessitating the purchase of BPA firm PTP transmission to move excess<br />

21 generation from the Dalreed load pocket to another location on PacifiCorp's system<br />

22 with adequate load to absorb the Threemile output. A graph of the Dalreed load and<br />

23 predicted Threemile generation showing the timing and extent of expected excess<br />

Affidavit of Bruce Griswold 5<br />

in Support of PacifiCorp's <strong>Advice</strong> No. 11-011