1 PacifiCorp's peak hourly load demand in the current or preceding 11 months.<br />

2 Therefore, if the QF generation reduced peak imports, PacifiCorp might realize a<br />

3 reduction in transmission service charges into the load pocket.<br />

4 14. In practice, the amount of savings realized has been minimal.<br />

5 compared actual hourly generation data from Threemile in 2009 and 2010 to actual<br />

6 load data at Dalreed during the same period. By subtracting Threemile Canyon<br />

7 generation from Dalreed load, I calculated what imports to Dalreed would have been<br />

8 without the Threemile project. I then compared actual 2009 and 2010 hourly<br />

9 Dalreed demand with the calculated amounts to determine how much the Threemile<br />

10 project actually reduced peak demand.<br />

11 15. In 2009, there was no reduction in peak hourly demand and therefore<br />

12 no savings under the BPA GTA. Dalreed experienced its annual peak hour in June<br />

13 2009, before Threemile was commercial, and under the ratchet billing formulae, the<br />

14 June 2009 peak was the governing billing determinant for the next 11 months.<br />

15 16. In 2010, Threemile reduced the annual peak hour demand at Dalreed<br />

16 by approximately 334 kW. A peak hourly demand of 43,742 kW occurred at 6PM<br />

17 (HE 19:00) on August 1, 2010. Without Threemile's contribution to Dalreed, the<br />

18 annual peak hour demand would have been 44,076 kW, or 334 kW greater, at lOAM<br />

19 (HE 11:00) on August 18, 2010. Because the August 1 peak hourly demand has<br />

20 remained the billing determinant through May 2011, one could credit Threemile<br />

21 with lowering the ratchet demand by 334 kW for 10 months-a savings of $900.13.<br />

22 17. Compared to the $101,808 annual cost PacifiCorp has incurred for<br />

23 short-term firm transmission out of Dalreed, or the $144,096 annual cost PacifiCorp<br />

Affidavit of Bruce Griswold 7<br />

in Support of PacifiCorp's <strong>Advice</strong> No. 11-011