04.09.2014 Views

Operational and Treatment Considerations for Stimulating the ...

Operational and Treatment Considerations for Stimulating the ...

Operational and Treatment Considerations for Stimulating the ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hybrid Pump Schedule<br />

• Starting with Slickwater <strong>and</strong> changing to Linear Gel<br />

• Pad/Prop/Sweep <strong>for</strong> 55% of job<br />

• Prop concentrations 0.25 ppg – 1.00 ppg 100 mesh<br />

• Linear Gel Proppant Ramp <strong>for</strong> 45% of job<br />

• Prop Concentrations 0.25 ppg – 1.5 ppg<br />

• Lower concentrations of proppant <strong>and</strong> smaller<br />

diameter (effective conductivity)<br />

• Higher rates – 60-80 BPM<br />

• More fluid – 12,500 bbls per stage<br />

• More HHP – 24,000 HHP<br />

• Fracture Initiation can be a limitation<br />

• High concentration of proppant in less fluid, but not<br />

significantly

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!