08.09.2014 Views

SMUD's Feed-In Tariff

SMUD's Feed-In Tariff

SMUD's Feed-In Tariff

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SMUD <strong>Feed</strong>-<strong>In</strong> <strong>Tariff</strong> Workshop Dec 9, 2009<br />

SMUD’s <strong>Feed</strong>-<strong>In</strong> <strong>Tariff</strong><br />

<strong>In</strong>troduction – Impact of SB 32<br />

• To accommodate provisions of SB 32, we intend<br />

to bifurcate the 100 MW into two “pools:”<br />

• Pool A - SB 32-specific pool<br />

– Pool size: 33.5 MW<br />

– Limited to renewables 3 MW or smaller<br />

• Pool B - Other FIT Applications pool<br />

– Pool size: 66.5 MW<br />

– All CHP and renewables not qualifying for SB-32 pool<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!