SMUD's Feed-In Tariff
SMUD's Feed-In Tariff
SMUD's Feed-In Tariff
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SMUD <strong>Feed</strong>-<strong>In</strong> <strong>Tariff</strong> Workshop Dec 9, 2009<br />
SMUD’s <strong>Feed</strong>-<strong>In</strong> <strong>Tariff</strong><br />
<strong>In</strong>troduction – Impact of SB 32<br />
• To accommodate provisions of SB 32, we intend<br />
to bifurcate the 100 MW into two “pools:”<br />
• Pool A - SB 32-specific pool<br />
– Pool size: 33.5 MW<br />
– Limited to renewables 3 MW or smaller<br />
• Pool B - Other FIT Applications pool<br />
– Pool size: 66.5 MW<br />
– All CHP and renewables not qualifying for SB-32 pool<br />
9