ENERGY EFFICIENCY<br />

Spec J1.6 – 2.<br />

Deemed-to-Satisfy Provisions<br />

Figure 2 TYPICAL R-VALUES FOR FLOOR CONSTRUCTION (for a floor without a floor heating system)— continued<br />

Floor construction description Item Item description R-Value<br />

(c) Solid concrete suspended slab,<br />

ground floor<br />

Up<br />

Down<br />

1. Indoor air film (still air) 0.11 0.16<br />

2. Solid concrete (150 mm,<br />

2400 kg/m 3 )<br />

0.10 0.10<br />

3. Outdoor air film (7 m/s) 0.03 0.03<br />

Total R-Value 0.24 0.29<br />

(d) 150 mm hollow-core concrete planks,<br />

ground floor<br />

1. Indoor air film (still air) 0.11 0.16<br />

2. Concrete topping (60 mm,<br />

2,400 kg/m 3 )<br />

3. Hollow-core concrete planks<br />

(150 mm, 1,680 kg/m 3 , 30%<br />

cores)<br />

0.04 0.04<br />

0.14 0.14<br />

4. Outdoor air film (7 m/s) 0.03 0.03<br />

Total R-Value 0.32 0.37<br />

Notes:<br />

1. The R-Value of an item, other than an air space, air film or air cavity, may be increased in<br />

proportion to the increased thickness of the item.<br />

2. The Total R-Value of a form of construction may be increased by the amount that an individual item<br />

is increased.<br />

3. For floor types (c) and (d) that are located over an internal space, the Total R-Value can be<br />

calculated by replacing the value for outdoor air film (R0.03) on the underside of the floor with the<br />

value for indoor air film (R0.11).<br />

4. The addition of 10 mm of render to the ceiling of a suspended internal concrete floor will increase<br />

the Total R-Value by 0.02.<br />

5. Solid concrete slab includes concrete beam and infill floors and concrete precast permanent<br />

formwork panels.<br />

6. Where an airspace is filled, the R-Value listed for the airspace must be deducted from the Total<br />

R-Value of the floor construction.<br />

BCA 2009 Volume One <strong>Australian</strong> <strong>Building</strong> <strong>Codes</strong> <strong>Board</strong> Page 440