08.10.2014 Views

Louis L. Mitchell Division 10 Engineer - Charlotte Chamber of ...

Louis L. Mitchell Division 10 Engineer - Charlotte Chamber of ...

Louis L. Mitchell Division 10 Engineer - Charlotte Chamber of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NCDOT<br />

<strong>Louis</strong> L. <strong>Mitchell</strong><br />

<strong>Division</strong> <strong>10</strong> <strong>Engineer</strong>


Road Map<br />

1. <strong>Division</strong> <strong>10</strong> Boundary<br />

2. Active Projects<br />

3. Major TIP Highlights<br />

4. Future Projects<br />

5. The Future


Albemarle – 1<strong>10</strong>85+ Lane Miles<br />

NC Department <strong>of</strong> Transportation<br />

Cabarrus<br />

Stanly<br />

Mecklenburg<br />

Union<br />

Anson<br />

5<br />

8<br />

5<br />

E<br />

m<br />

p<br />

l<br />

o<br />

y<br />

e<br />

e<br />

s


Bridge Projects


<strong>Engineer</strong>ing Review Summary<br />

Business is picking up<br />

559 Encroachments 2012<br />

62 Encroachments 2013<br />

135 Driveway permits 2012<br />

23 Driveway permits 2013<br />

25 TIAs in 2012<br />

12 TIAs 2013


NC DOT Board Members


NC Department <strong>of</strong> Transportation<br />

<strong>Division</strong> <strong>10</strong><br />

I-3803B - I-85 from Bruton Smith Blvd. to NC 73 - $125,159,1<strong>10</strong><br />

April 2014 traffic on I-85 thru lanes Dec 2013<br />

I-485 / I-85 Interchange - $92,162,250 June 2014<br />

R-2248E - I-485 from NC 115 to I-85 - $139,457,130 Dec 2014<br />

R-2533CC - NC 49 from Cline Road to NC 73 - $19,436,351 May<br />

2014


NC Department <strong>of</strong> Transportation<br />

<strong>Division</strong> <strong>10</strong><br />

R-4902 – I-485 from Johnston Rd. to I-77 - $83,345,000<br />

(December 2014)<br />

U-209B – Independence Blvd (US 74) from Albemarle Rd. to<br />

Idlewild Rd. - $64,506,500 (April 2016)<br />

R-2559 / R-3329 - Monroe Bypass - $367,7000,000 On Hold


<strong>Charlotte</strong>’s turbine interchange was named the top road project in the October 2012 issue <strong>of</strong><br />

“Roads and Bridges” magazine. Rather than build the proposed four-level stack interchange, the<br />

turbine will take less right-<strong>of</strong>-way, feature smaller bridges, and will be easier to maintain. Savings<br />

estimate $50 million.


I485 to I85 Interchange<br />

• R-2123CE: I-85/I-485 Interchange<br />

Reconstruction<br />

• Design Build Project with initial estimated cost<br />

<strong>of</strong> approximately $155 Million (Including R/W<br />

acquisition and utility relocation)<br />

• Lane/STV-Ralph Whitehead Associates<br />

awarded contract @ $92,162,250<br />

• Completion scheduled for June <strong>10</strong>, 2014<br />

I-85 will be in final pattern Dec 2013<br />

• Design Build team modified 4-Level Stack to<br />

Turbine Interchange


NC Department <strong>of</strong> Transportation<br />

I-85 widening


I-85 Cabarrus County<br />

I-3803B: I-85 from Bruton Smith Blvd. to NC 73<br />

Widens 5.5 mi. <strong>of</strong> I-85 from 4-lane divided to 8-lane<br />

divided and reconstructs interchanges at Poplar Tent<br />

Road and NC 73.<br />

Lane Construction Corp/HDR submitted winning price<br />

proposal @ $125,159,1<strong>10</strong><br />

Construction began August 2011<br />

Completion scheduled for Nov. 19, 2013<br />

DDIs at Poplar Tent Road and NC 73


NC Department <strong>of</strong> Transportation<br />

ACCESS BRIDGE TO I-85


I-485 Outer Loop<br />

R-2248E


R-2248E I-485 Outer Loop<br />

• Final 5.7 Miles <strong>of</strong> I-485 from<br />

West <strong>of</strong> NC 115 to West <strong>of</strong> I-85<br />

• 8 Lane Concrete Pavement<br />

Section<br />

• Design Build<br />

• Blythe Construction $139.5<br />

Million<br />

• December 2014


R-2248E I-485 Outer Loop<br />

• Diverging Diamond Interchange- 1 st<br />

in State?<br />

• Split Diamond Interchange<br />

• 20 Bridges, 2 Box Culverts<br />

• 2.8 Million CY Material<br />

• Bridges over NSRR<br />

• Approximately 50% Complete


Independence Blvd / US 74 Widening<br />

Project U209B<br />

• DeVere Construction $ 51 Million<br />

• 2 Miles Expressway from Albemarle Rd to Wallace Lane<br />

• 8 Lane Typical Section<br />

• Interchanges at Idlewild Rd and Sharon Amity<br />

• HOV Lanes<br />

• Partial Controlled Access


US 74 Vision


R-4902 I-485 Improvements<br />

Widen 9.2 Miles <strong>of</strong> I-485<br />

from 4 lanes to 6 lanes<br />

Reconstruct Interchange at<br />

US 521<br />

Rehabilitation <strong>of</strong> Existing<br />

I-485 Pavement<br />

Auxiliary Lane from<br />

US 521 to NC 51<br />

Widen Existing Structures


R-4902 I-485 Improvements<br />

• Lane/STV<br />

$83.3 Million<br />

Design Build<br />

• Begin March 2013<br />

• Jonhston Rd Bridge<br />

June 2014<br />

• Completion Date<br />

December 4, 2014<br />

• 23 Months Ahead <strong>of</strong><br />

Required Completion


NC Department <strong>of</strong> Transportation<br />

<strong>Division</strong> <strong>10</strong><br />

R-2246B – George Liles Pkwy. from Weddington Rd. to Roberta Rd. - $36,300,000<br />

(May 2013)<br />

R-2246A – George Liles Pkwy. from Roberta Rd. to NC 49 - $17,000,000<br />

(TBD)<br />

U-2507 – Mallard Creek Rd. from Sugar Creek Rd. to Harris Blvd. - $28,700,000<br />

(November 2013)<br />

U-3321 – Garden Parkway – from Gastonia to NC 160 - $800,000,000 - $900,000,000<br />

(On hold)<br />

U-49<strong>10</strong> – Derita Rd. from Bruton Smith Blvd. to Poplar Tent Rd. - $<strong>10</strong>,696,000<br />

(August 2013)<br />

U-4713B – Old Monroe Rd / John Street from I-485 to Indian Trail Rd. - $38,200,000<br />

(September 2013)


NC Department <strong>of</strong> Transportation<br />

<strong>Division</strong> <strong>10</strong><br />

I-3802A – I-85 from NC 73 to Lane Street - $190,600,000<br />

(September 2013)<br />

I-4733 – I-77 & West Catawba Avenue Interchange DDI - $6,235,000<br />

(August 2013)<br />

I-5405 , I-4750HOT – I-3311C<br />

I-77 from Brookshire Freeway to West Catawba Avenue -<br />

$170,000,000/$550,000,000<br />

(Commercial Close– Let October 2013)P3 potential


NCDOT<br />

Back to the Future


Cornelius DDI proposal


Governor McCrory<br />

Turn on the Lights


NC Department <strong>of</strong> Transportation<br />

Albemarle, NC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!