11.10.2014 Views

Download Action Plan - Australian Packaging Covenant

Download Action Plan - Australian Packaging Covenant

Download Action Plan - Australian Packaging Covenant

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.2. Recycling<br />

Goal KPI <strong>Action</strong> Item Responsibility Timeframe<br />

2. Recycling: The<br />

efficient collection<br />

and recycling of<br />

packaging.<br />

2. National recycling<br />

rate for packaging.*<br />

3. Proportion of<br />

signatories with onsite<br />

recovery systems<br />

for recycling used<br />

packaging.<br />

Not Applicable.<br />

7. Investigate replacement of wooden pallets<br />

within packaging with cardboard pallets.<br />

8. Review packaging waste streams and identify<br />

opportunities for reduction.<br />

o Map waste streams<br />

o Identify focus areas and<br />

opportunities.<br />

9. Monitor recycling rates for packaging and<br />

performance at CSL facilities.<br />

Performance<br />

Measure<br />

Logistics Dec 2011 Result of<br />

Investigation<br />

Emails<br />

Meeting Minutes<br />

Evidence of Use<br />

(if applicable)<br />

Sourcing / Logistics Jun 2012 List of packaging<br />

waste streams and<br />

disposal method.<br />

HS&E<br />

Annually by<br />

October.<br />

Metrics on recycling<br />

rates for packaging.<br />

Additional<br />

Commentary<br />

May be modified,<br />

dependant on<br />

Evaluation tools.<br />

Technical<br />

feasibility<br />

4. Proportion of<br />

signatories with a<br />

policy to buy<br />

products made from<br />

recycled packaging.<br />

5. Additional tonnes of<br />

material reprocessed<br />

in primary and<br />

secondary markets as<br />

a result of <strong>Covenant</strong>funded<br />

projects.*<br />

10. Review CSL’s environmental policies to<br />

include specific reference to packaging if<br />

applicable.<br />

Not Applicable.<br />

Sourcing, HS&E Dec 2011 Result of review and<br />

potential timeframe<br />

for modification if<br />

applicable – in line<br />

with CSL’s<br />

document review<br />

process.<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!