23.10.2014 Views

Nordic TSO message exchange model - Ediel Nordic Forum

Nordic TSO message exchange model - Ediel Nordic Forum

Nordic TSO message exchange model - Ediel Nordic Forum

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Nordic</strong> <strong>TSO</strong> schedule document <strong>exchange</strong> <strong>model</strong><br />

8.2.1.2 Attribute usage<br />

Document Attribute Code and description<br />

Production<br />

Header<br />

and Document version Not used<br />

consumption Document Type Z01 Operational schedule<br />

schedule Process Type A17 Schedule day<br />

Sender role A04 System operator<br />

A08 Balance responsible party<br />

Receiver role Z03 International system operator<br />

A04 System operator<br />

A05 Imbalance settlement responsible<br />

Domain<br />

Any known area from the Harmonised role <strong>model</strong> cowering the areas<br />

within the time series level of the document, e.g. Market balance area<br />

(Elspot area), National Area, etc<br />

Subject party Not used<br />

Subject role Not used<br />

Classification type A01 Detail type<br />

A02<br />

Summary type<br />

Time series<br />

Business Type A01 Production<br />

A04 Consumption<br />

Z17 Technical minimum<br />

Z18 Technical maximum<br />

Z19 Total maximum<br />

Z20 Total minimum<br />

Z26 Operational balance<br />

Direction<br />

Not used<br />

Product<br />

8716867000016 Active power<br />

8716867000030 Active energy<br />

Connecting area Not used<br />

Resource object Only used for Classification type = A01, i.e. Station group, regulation<br />

object<br />

Resource provider Not used<br />

Acquiring area Not used<br />

Capacity contract Not used<br />

type<br />

Capacity agreement Not used<br />

identification<br />

In area<br />

Used for all Business types, except consumption schedules, i.e.<br />

Market balance area<br />

Out area<br />

Only used for consumption schedules, i.e. Market balance area<br />

Business type Z01 Hydro<br />

characteristics Z02 Nuclear<br />

Z03 Thermal<br />

Z04 Wind<br />

Z05 Decentralised<br />

National rules:<br />

DK: Z05 is only used in Denmark (aggregated production for<br />

small production units)<br />

Table 8: Usage of Planned resource schedule, Production and consumption schedule<br />

Page: 42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!