23.10.2014 Views

Nordic TSO message exchange model - Ediel Nordic Forum

Nordic TSO message exchange model - Ediel Nordic Forum

Nordic TSO message exchange model - Ediel Nordic Forum

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Nordic</strong> <strong>TSO</strong> schedule document <strong>exchange</strong> <strong>model</strong><br />

3 OVERVIEW OF THE NORDIC SCHEDULING PROCESS<br />

Figure 4: UseCase diagram: The <strong>Nordic</strong> Scheduling process<br />

In Figure 4 the <strong>Nordic</strong> scheduling process is further decomposed into Business areas and Process areas.<br />

Each of these Business areas and Process areas will be further described below.<br />

The Balance responsible parties, operating within one or several Market balance areas sends schedules and<br />

prognosis to the System operator, ensuring the correct operation of one or several Market balance areas. The<br />

System operator sends the schedules to the International system operator for validation and publication.<br />

The basic principle upon which this phase has been based is that all the trades between two Balance<br />

responsible parties must be notified and coherent. For each Market balance area all the “in” flows should<br />

balance with all the “out” flows. In the case of imbalance, the System operator must manage the imbalance<br />

prior to the operation phase.<br />

Page: 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!