company engaged in petroleum operations, mean or connote<br />

respectively-<br />

1979 No. 95<br />

(a) delivery, without sale, of chargeable oil to, and<br />

(b) chargeable oil delivered, without sale, to,<br />

a refinery or to an adjacent storage tank for refining by the company;<br />

"G-Factor" means gas production cost adjustment factor;<br />

"High Court" means a High Court in Nigeria within whose jurisdiction –<br />

(a) in relation to any offence under this Act, the place is situated where<br />

such offence is, for the purposes of this Act, deemed to have<br />

occurred;<br />

(b) in relation to any suit for tax or appeal against an assessment of tax,<br />

the place is situated where the return under section 31 of this Act<br />

was submitted or where the assessment of the tax was made as the<br />

case may be;<br />

(c) in relation to any direction under section 30(2) of this Act, the place<br />

is situated from which the direction was issued; and<br />

(d) in relation to any claim or other matter which is subject to appeal in<br />

like manner as an assessment, or to which the provisions of section<br />

38 of this Act apply with any modifications, the place is situated<br />

from which the claim or other matter was refused by the Board;<br />

1973 No. 15<br />

"intangible drilling costs" means all expenditure for labour,fuel, repairs,<br />

maintenance, hauling, and supplies and materials ( not being supplies<br />

and materials for well cement, casing or other well fixtures) which are<br />

for or incidental to drilling, cleaning, deepening or completing wells or<br />

the preparation thereof incurred in respect of –<br />

(a) determination of well locations, geological studies and<br />

topographical and geographical surveys preparatory to drilling;<br />

(b) drilling, shooting, testing and cleaning wells;<br />

(c) cleaning, draining and leveling land, road- building and the<br />

laying of foundations;<br />

(d) erection of rigs and tankage assembly and installation of<br />

pipelines and other plant and equipment required in the<br />

preparation or drilling of wells producing petroleum;<br />

1979 No. 95<br />

"liquefied natural gas" means natural gas in its liquid state at<br />

approximately atmospheric pressure;<br />

"loss" means a loss ascertained in like manner as an adjusted profit;<br />