08 - Tanzania Civil Aviation Authority
08 - Tanzania Civil Aviation Authority
08 - Tanzania Civil Aviation Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
APPENDIX 3: EXAMPLE OF A RISK MITIGATION PROCESS<br />
Sample flowchart of the risk mitigation process<br />
Sample risk mitigation worksheet<br />
Item<br />
Type of<br />
operation or<br />
activity<br />
1 A)<br />
Introduction<br />
of new<br />
equipment<br />
“XYZ”<br />
Identified<br />
hazard<br />
Hazard No 1<br />
-<br />
Projected<br />
Risk(s)<br />
Risk No 1-1<br />
Current<br />
Risk<br />
Index<br />
3A<br />
Risk(s)<br />
actions<br />
mitigation<br />
Control/Action No 1-1-1<br />
Control/Action No 1-1-2<br />
Risk No 1-2 2B Control/Action No 1-2-1 2D<br />
Hazard No 2 Risk No 2-1 4C Control/Action No 2-1-1 4D<br />
Hazard No 3 Risk No 3-1 3B Control/Action No 3-1-1 2C<br />
Resultant<br />
Risk Index<br />
1B<br />
APPENDIX 4: GUIDANCE FOR THE DEVELOPMENT OF A SAFETY MANAGEMENT<br />
SYSTEM<br />
POLICY MANUAL<br />
This appendix is designed to help organizations document the processes and<br />
procedures required for a Safety Management System. It is intended to provide<br />
guidance for the development of a Safety Management System policy manual, which<br />
can be a separate stand-alone document or it could be incorporated into an existing<br />
manual, as required. This suggested format is one way in which an organization can<br />
meet the documentation requirements of SMS.<br />
23