25.10.2014 Views

08 - Tanzania Civil Aviation Authority

08 - Tanzania Civil Aviation Authority

08 - Tanzania Civil Aviation Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX 3: EXAMPLE OF A RISK MITIGATION PROCESS<br />

Sample flowchart of the risk mitigation process<br />

Sample risk mitigation worksheet<br />

Item<br />

Type of<br />

operation or<br />

activity<br />

1 A)<br />

Introduction<br />

of new<br />

equipment<br />

“XYZ”<br />

Identified<br />

hazard<br />

Hazard No 1<br />

-<br />

Projected<br />

Risk(s)<br />

Risk No 1-1<br />

Current<br />

Risk<br />

Index<br />

3A<br />

Risk(s)<br />

actions<br />

mitigation<br />

Control/Action No 1-1-1<br />

Control/Action No 1-1-2<br />

Risk No 1-2 2B Control/Action No 1-2-1 2D<br />

Hazard No 2 Risk No 2-1 4C Control/Action No 2-1-1 4D<br />

Hazard No 3 Risk No 3-1 3B Control/Action No 3-1-1 2C<br />

Resultant<br />

Risk Index<br />

1B<br />

APPENDIX 4: GUIDANCE FOR THE DEVELOPMENT OF A SAFETY MANAGEMENT<br />

SYSTEM<br />

POLICY MANUAL<br />

This appendix is designed to help organizations document the processes and<br />

procedures required for a Safety Management System. It is intended to provide<br />

guidance for the development of a Safety Management System policy manual, which<br />

can be a separate stand-alone document or it could be incorporated into an existing<br />

manual, as required. This suggested format is one way in which an organization can<br />

meet the documentation requirements of SMS.<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!