Details are established in consultation with HUHN.<br />

The supplier must confirm adherence to this specification as part of the first article submission process.<br />

11 Changes<br />

HUHN must be notified punctually in writing by means of a change request in the event of changes involving:<br />

� Product design and layout<br />

� Manufacturing process<br />

� Utilised materials<br />

� Production location<br />

� Changing sub-suppliers<br />

Changes may not be implemented without written approval from HUHN.<br />

After approval has been issued, changes must be qualified by the supplier. The FMEA, the QM plan<br />

(inspection plan), the part life-cycle etc. must be correspondingly adapted.<br />

First article submission must be completed before parts can be used. The scope of the first article submission<br />

process must be coordinated with HUHN.<br />

Notification indicating positive results of the first article submission process constitutes approval of the<br />

change, and completes the change process.<br />

The first shipment of changed parts must be announced in writing. The shipping documents and the<br />

packaging must clearly indicate initial shipment of changed parts.<br />

12 Shipments<br />

All shipments must be made in accordance with applicable agreements and order releases.<br />

Goods must be identified in a machine-readable fashion, such that traceability is assured.<br />

Products with manufacturing dates which go back more than 12 months may not be shipped to HUHN. If<br />

shipment of such products becomes necessary, the supplier must obtain special approval from HUHN. This<br />

approval must be issued by HUHN in writing. The goods must be separately identified.<br />

Other details shall be established as necessary in the event of approval.<br />

Specially approved materials may not be mixed with other materials/shipments. They must always be shipped<br />

unmixed, in separate containers and with appropriate identification. Any incurred costs may be invoiced to the<br />

supplier.<br />

13 Defective Parts<br />

13.1 At the <strong>Supplier</strong>’s Facility<br />

Parts which are identified as defective by the supplier, or which presumably do not fulfil the specified<br />

requirements, must be identified immediately and stored such that further processing and shipment to HUHN<br />

is precluded. Delivery of defective parts to HUHN must be prevented.<br />

Measures must be immediately implemented by the supplier in order to inspect previously manufactured parts<br />

and/or lots.<br />

The cause of the defect must be analysed, and must be eliminated by means of suitable process<br />

improvements (e.g. 8D processes).<br />

HHR 001, revision level 12/10 <strong>Supplier</strong> <strong>Quality</strong> <strong>Guidelines</strong> Page 10 of 13