Details are established in consultation with HUHN.<br />
The supplier must confirm adherence to this specification as part of the first article submission process.<br />
11 Changes<br />
HUHN must be notified punctually in writing by means of a change request in the event of changes involving:<br />
� Product design and layout<br />
� Manufacturing process<br />
� Utilised materials<br />
� Production location<br />
� Changing sub-suppliers<br />
Changes may not be implemented without written approval from HUHN.<br />
After approval has been issued, changes must be qualified by the supplier. The FMEA, the QM plan<br />
(inspection plan), the part life-cycle etc. must be correspondingly adapted.<br />
First article submission must be completed before parts can be used. The scope of the first article submission<br />
process must be coordinated with HUHN.<br />
Notification indicating positive results of the first article submission process constitutes approval of the<br />
change, and completes the change process.<br />
The first shipment of changed parts must be announced in writing. The shipping documents and the<br />
packaging must clearly indicate initial shipment of changed parts.<br />
12 Shipments<br />
All shipments must be made in accordance with applicable agreements and order releases.<br />
Goods must be identified in a machine-readable fashion, such that traceability is assured.<br />
Products with manufacturing dates which go back more than 12 months may not be shipped to HUHN. If<br />
shipment of such products becomes necessary, the supplier must obtain special approval from HUHN. This<br />
approval must be issued by HUHN in writing. The goods must be separately identified.<br />
Other details shall be established as necessary in the event of approval.<br />
Specially approved materials may not be mixed with other materials/shipments. They must always be shipped<br />
unmixed, in separate containers and with appropriate identification. Any incurred costs may be invoiced to the<br />
supplier.<br />
13 Defective Parts<br />
13.1 At the <strong>Supplier</strong>’s Facility<br />
Parts which are identified as defective by the supplier, or which presumably do not fulfil the specified<br />
requirements, must be identified immediately and stored such that further processing and shipment to HUHN<br />
is precluded. Delivery of defective parts to HUHN must be prevented.<br />
Measures must be immediately implemented by the supplier in order to inspect previously manufactured parts<br />
and/or lots.<br />
The cause of the defect must be analysed, and must be eliminated by means of suitable process<br />
improvements (e.g. 8D processes).<br />
HHR 001, revision level 12/10 <strong>Supplier</strong> <strong>Quality</strong> <strong>Guidelines</strong> Page 10 of 13