are used for the same operation, 100 parts per cavity or tool are required. Reference gauges are to be agreed<br />
upon separately.<br />
The agreed upon first article samples must be shipped to HUHN’s order address along with all required<br />
records in a separate package identified with a coloured label bearing the words “first article samples”.<br />
Shipment of first article samples with incomplete documentation must be approved in advance in writing by<br />
HUHN.<br />
5.1.2 Standard Products<br />
The supplier must submit a first article sample punctually before approval for series production is issued.<br />
After the supplier has submitted parts during the developmental stage, he must initiate component approval<br />
without delay.<br />
The scope of the first article inspection report generally corresponds to the requirements for HUHN-specific<br />
parts, although product-specific simplifications are possible, for example if approvals from our customer have<br />
already been received by the supplier. However, these must be authorised by HUHN prior to first article<br />
submission.<br />
5.2 Approval<br />
HUHN examines the first article inspection report for completeness and compliance with the specified<br />
requirements.<br />
Individual characteristics are double-checked if deemed necessary.<br />
Incomplete test reports, and test reports which exhibit non-approved deviations, are not processed and are<br />
returned to the supplier. This is taken into consideration in the supplier evaluation. If first article submission<br />
has to be repeated through the fault of the supplier, the supplier may be invoiced for processing costs.<br />
HUHN expects first article samples to fulfil all requirements.<br />
If deviations which cannot be corrected on short notice should nevertheless become apparent during the<br />
course of first article production, a written request for limited deviation approval, or a drawing or specification<br />
change, must be submitted prior to first article submission.<br />
The chances of receiving approval must be clarified by the supplier in advance.<br />
Implemented corrections must be approved by resubmitting a new first article inspection report. Agreed upon<br />
correction deadlines must be adhered to.<br />
<strong>Co</strong>mponent approval is issued by affixing the required signature to the included PSW or VDA cover sheet.<br />
Approved deviations are recorded. The signed cover sheet is returned to the supplier.<br />
The supplier is not authorised to ship series produced parts to HUHN without this approval.<br />
6 Re-Qualification<br />
In order to assure continued quality, the supplier must re-qualify the product/process once a year.<br />
The scope of the re-qualification process must be coordinated with HUHN.<br />
Re-qualification results must be submitted to HUHN of the supplier’s own accord.<br />
If no shipments are received from the supplier for more than a year, the original approval issued by HUHN<br />
expires.<br />
The part must be re-qualified in this case. The supplier must submit a request for re-approval by means of first<br />
article submission (see above).<br />