Power Purchase Agreement-Fenchuganj<br />
8.3 Forced Outages and Maintenance Outages<br />
(a)<br />
In the event that the sum of:<br />
(i)<br />
(ii)<br />
(iii)<br />
the Equivalent Forced Outages Energy for the Facility (“a”); plus<br />
the Maintenance Outages Energy (“b”); plus<br />
the Scheduled Outages Energy (“c”),<br />
shall exceed Ω MWh in any Contract Year and during simple cycle operation, where Ω<br />
MWh equals the Average Dependable Capacity for that Contract Year multiplied by:<br />
(1) One thousand three hundred and seventy six (1376) hours in the<br />
third Contract Year (the “Major Maintenance Year”) and every<br />
third Contract Year after the Major Maintenance Year; provided,<br />
that the Company may at its sole discretion elect that the Major<br />
Maintenance Year shall occur in the Contract Year immediately<br />
preceding or immediately following any such Contract Year<br />
(instead of such Contract Year) and each subsequent Major<br />
Maintenance Year shall be adjusted accordingly; and<br />
(2) Eight hundred and seventy six (876) hours in all Contract Years<br />
including simple cycle operation period other than those Contract<br />
Years referred to in sub paragraphs (a)(1) above,<br />
then, the Company shall owe <strong>BPDB</strong>, as liquidated damages, the Capacity Factor<br />
Amount multiplied by ((a + b + c) - Ω) for that Contract Year.<br />
(b)<br />
(c)<br />
(d)<br />
In computing liquidated damages payable by the Company for the first Contract Year and<br />
during simple cycle operation, the sum of (a + b + c) in this Section 8.3 shall be adjusted<br />
by multiplying (a + b + c) by 0.75. There shall be no adjustment in any subsequent<br />
Contract Year.<br />
The Capacity Factor Amount in any Contract Year “n” shall be equal to the product of (i)<br />
Average Capacity Price n (as defined in Section 8.3(d) below) and (ii) 1.522.<br />
In respect of this Section 8.3, the Average Capacity Price n in Taka per kW – Month for<br />
Contract Year, n, shall be calculated as follows to determine any liquidated damages<br />
payable under this Section:<br />
Average Capacity Price n = ∑(((RNECP n + RECP(US) n x FIIF qm ) x<br />
m = 1 to 12<br />
where,<br />
CE invoicem ) + (RECP(Tk) mn x LIIF qm ))/12<br />
RNECP n , RECP(US) n , RECP(Tk) n , FIIF qm , LIIF qm and CE invoicem shall have the meanings<br />