2012 Special Inspections Checklist
2012 Special Inspections Checklist
2012 Special Inspections Checklist
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5/08/13<br />
<strong>Special</strong> <strong>Inspections</strong> <strong>Checklist</strong><br />
<strong>2012</strong> NC Building Code Section 1704<br />
(check all boxes that apply)<br />
Periodic<br />
Continuous<br />
Verification of in-situ concrete strength, prior to stressing of tendons in<br />
posttensioned concrete and prior to removal of shores and forms from beams and<br />
structural slabs.<br />
Inspect formwork for shape, location and dimensions of the concrete member being<br />
formed.<br />
Masonry Construction (Level 1) (Table 1704.5.1)<br />
Compliance with required inspection provisions of the construction documents and<br />
the approved submittals shall be verified.<br />
Verification of f’ m and f’ aac prior to construction except where specifically exempted<br />
by this code.<br />
Verification of slump flow and VSI as delivered to the site for self-consolidating<br />
grout.<br />
As masonry construction begins, the following shall be verified to ensure<br />
compliance:<br />
Proportions of site-prepared mortar.<br />
Construction of mortar joints.<br />
Location of reinforcement, connectors, prestressing tendons and anchorage.<br />
Prestressing technique.<br />
Grade and size of prestressing tendons and anchorage.<br />
During construction the inspection program shall verify:<br />
Size and location of structural elements.<br />
Type, size and location of anchors, including other details of anchorage of<br />
masonry to structural members, frames or other construction.<br />
Specified size, grade and type or reinforcement, anchor bolts, prestressing<br />
tendons and anchorages.<br />
Welding of reinforcing bars.<br />
Protection of masonry during cold weather (temperature below 40 O F) or hot<br />
weather (temperature above 90 O F).<br />
Application and measurement of prestressing force.<br />
Prior to grouting, the following shall be verified to ensure compliance:<br />
Grout space is clean.<br />
Placement of reinforcement and connectors and prestressing tendons and<br />
anchorage.<br />
Proportions of site-prepared grout and prestressing grout for bonded tendons.<br />
Construction of mortar joints.<br />
Grout placement shall be verified to ensure compliance with code and construction<br />
document provisions.<br />
Grouting of prestressing bonded tendons.<br />
Preparation of any required grout specimens, mortar specimens and/or prisms shall<br />
be observed.<br />
Page 4 of 7