F4E CODAC I&C Integrator Summary on Technical requirements ...
F4E CODAC I&C Integrator Summary on Technical requirements ...
F4E CODAC I&C Integrator Summary on Technical requirements ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<str<strong>on</strong>g>F4E</str<strong>on</strong>g><br />
<str<strong>on</strong>g>CODAC</str<strong>on</strong>g> I&C <str<strong>on</strong>g>Integrator</str<strong>on</strong>g><br />
<str<strong>on</strong>g>Summary</str<strong>on</strong>g> <strong>on</strong> <strong>Technical</strong> <strong>requirements</strong>,<br />
Skills & Competences required
<str<strong>on</strong>g>F4E</str<strong>on</strong>g> <str<strong>on</strong>g>CODAC</str<strong>on</strong>g> activities<br />
<br />
<br />
<br />
<str<strong>on</strong>g>CODAC</str<strong>on</strong>g> group collaborates with IO <str<strong>on</strong>g>CODAC</str<strong>on</strong>g> in..<br />
Identifying <strong>requirements</strong> and interfaces<br />
Addressing technical implementati<strong>on</strong> and integrati<strong>on</strong> issues<br />
<str<strong>on</strong>g>CODAC</str<strong>on</strong>g> group supports <str<strong>on</strong>g>F4E</str<strong>on</strong>g> Project Teams (PT) in …<br />
Tech spec preparati<strong>on</strong><br />
C<strong>on</strong>tract follow up<br />
<str<strong>on</strong>g>CODAC</str<strong>on</strong>g> group is delegated by <str<strong>on</strong>g>F4E</str<strong>on</strong>g> PTs the…<br />
Development of interfaces to <str<strong>on</strong>g>CODAC</str<strong>on</strong>g> (Hardware HW and Software SW)<br />
For fusi<strong>on</strong>/bespoke systems –<br />
<str<strong>on</strong>g>CODAC</str<strong>on</strong>g> group is also delegated by <str<strong>on</strong>g>F4E</str<strong>on</strong>g> PTs the…<br />
development of the c<strong>on</strong>trol system (HW and SW)<br />
Integrati<strong>on</strong> of special comp<strong>on</strong>ents from C<strong>on</strong>tractors.<br />
<br />
NOTE! For industrial systems, Main Industrial C<strong>on</strong>tractor<br />
prepares fully functi<strong>on</strong>al industrial systems<br />
<br />
<br />
including Instrumentati<strong>on</strong> & C<strong>on</strong>trol<br />
excluding interface to <str<strong>on</strong>g>CODAC</str<strong>on</strong>g><br />
2
<str<strong>on</strong>g>F4E</str<strong>on</strong>g> <str<strong>on</strong>g>CODAC</str<strong>on</strong>g><br />
<str<strong>on</strong>g>F4E</str<strong>on</strong>g><br />
Project Teams<br />
IO<br />
(<str<strong>on</strong>g>CODAC</str<strong>on</strong>g> +<br />
cable/grounding<br />
…)<br />
Collaborates<br />
<strong>on</strong> standards<br />
<strong>on</strong> integrati<strong>on</strong> …<br />
<str<strong>on</strong>g>F4E</str<strong>on</strong>g><br />
I&C group<br />
Provides I&C<br />
services<br />
Supports<br />
Acceptance Tests<br />
FAT & SAT<br />
Manages<br />
Suppliers<br />
Prepares<br />
C<strong>on</strong>trol System (not the PCS)<br />
(Fusi<strong>on</strong> Systems )<br />
Prepares<br />
Interface to <str<strong>on</strong>g>CODAC</str<strong>on</strong>g><br />
(Industrial Systems )<br />
3
Systems for ITER by <str<strong>on</strong>g>F4E</str<strong>on</strong>g><br />
Industrial Systems<br />
CRYO-Plants (LN2 & 80K)<br />
Remote Handling (4 systems)<br />
Tritium Plant systems<br />
Buildings Management System<br />
Electrical Distributi<strong>on</strong><br />
Waste process<br />
Test Blanket<br />
REMS<br />
Fusi<strong>on</strong> Systems<br />
Diagnostics (14 systems)<br />
Additi<strong>on</strong>al Heating (3 systems)<br />
Standal<strong>on</strong>e instrumentati<strong>on</strong><br />
Vacuum Vessel<br />
Divertor (?)<br />
Blanket (?)<br />
Scope of I&C Activities<br />
Help Tender Preparati<strong>on</strong><br />
Help Follow-up activities<br />
Develop interface to <str<strong>on</strong>g>CODAC</str<strong>on</strong>g><br />
Help Tender Preparati<strong>on</strong><br />
Help Follow-up activities<br />
iti<br />
Develop interface to <str<strong>on</strong>g>CODAC</str<strong>on</strong>g><br />
Develop c<strong>on</strong>trol system<br />
4
<str<strong>on</strong>g>F4E</str<strong>on</strong>g> <str<strong>on</strong>g>CODAC</str<strong>on</strong>g> strategy: 2 suppliers<br />
<str<strong>on</strong>g>F4E</str<strong>on</strong>g> Codac scope of<br />
supply will be<br />
discharged by means<br />
of 2 companies<br />
managed by the I&C<br />
group<br />
5
Strategy – <str<strong>on</strong>g>Summary</str<strong>on</strong>g><br />
IO – <str<strong>on</strong>g>CODAC</str<strong>on</strong>g><br />
& Elect. Div.<br />
Collaborate (IPT)<br />
Provides I&C<br />
services<br />
Project Team<br />
Manages<br />
Manages<br />
Cubicle<br />
service<br />
Uses<br />
Supports<br />
FAT/SAT<br />
Suppliers<br />
Cable<br />
service<br />
Prepares<br />
C<strong>on</strong>trol System (not the PCS)<br />
(Fusi<strong>on</strong> Systems )<br />
Prepares<br />
Interface to <str<strong>on</strong>g>CODAC</str<strong>on</strong>g><br />
(Industrial Systems )<br />
6
The role of the I&C <str<strong>on</strong>g>Integrator</str<strong>on</strong>g><br />
7
I&C <str<strong>on</strong>g>Integrator</str<strong>on</strong>g> c<strong>on</strong>tract<br />
What procedure<br />
Open procedure for awarding of Framework C<strong>on</strong>tract<br />
What type of service<br />
Series of I&C “<str<strong>on</strong>g>Integrator</str<strong>on</strong>g> Service Framework c<strong>on</strong>tracts”<br />
Software development<br />
C<strong>on</strong>trol Hardware design<br />
Assemble & Test of systems<br />
What about hardware?<br />
At the moment the plan is that t hardware is not in this scope of<br />
supply as it will be provided by IO in the form of pre-assembled<br />
cubicles.<br />
Provided d by other <str<strong>on</strong>g>F4E</str<strong>on</strong>g> c<strong>on</strong>tracts t (<strong>on</strong>ly for bespoke HW)<br />
8
Scope of the I&C <str<strong>on</strong>g>Integrator</str<strong>on</strong>g> FW c<strong>on</strong>tract<br />
Perform standardizati<strong>on</strong> and optimizati<strong>on</strong> of<br />
development procedures compliant to ITER rules.<br />
Participate in the design and implementati<strong>on</strong> of<br />
system tests<br />
Design interface/c<strong>on</strong>trol cubicles and software<br />
Design software architecture<br />
Design software tests<br />
s<br />
Write and test software modules<br />
Perform integrated software tests<br />
Perform integrated cubicle system tests<br />
Provide any small value custom hardware equipment<br />
necessary for integrati<strong>on</strong> or tests. (TBD)<br />
9
Scope summary in relati<strong>on</strong> to<br />
other c<strong>on</strong>tracts<br />
Resource<br />
name<br />
Manage<br />
Follow<br />
up<br />
Prep System Software Detailed<br />
tech Engineer Engineer Hardware<br />
spec<br />
Developer<br />
Designer<br />
Supply<br />
Hardware<br />
<str<strong>on</strong>g>F4E</str<strong>on</strong>g> I&C<br />
group<br />
yes yes yes little Small<br />
value<br />
“in sourcing” integrator helps yes yes very little Very little<br />
Small<br />
value<br />
I&C<br />
integrator<br />
Cable<br />
service<br />
some yes yes<br />
IO cubicle yes yes<br />
service<br />
Special<br />
Hardware<br />
Supplier<br />
Supplied by mean of PT<br />
c<strong>on</strong>tracts<br />
yes<br />
yes<br />
yes<br />
yes<br />
10
Required I&C <strong>Technical</strong> Expertise<br />
<br />
<br />
<br />
<br />
<br />
System/ C<strong>on</strong>trol System engineering<br />
Software engineering<br />
<br />
<br />
<br />
<br />
<br />
<br />
Programming <strong>on</strong> Linux<br />
Programming C/C++, step7...<br />
Programming Hard Real Time c<strong>on</strong>trol software<br />
Implementing complex mathematical algorithms<br />
Implementing Signal Processing algorithms<br />
Linux Device driver development<br />
Digital c<strong>on</strong>trol system:<br />
<br />
PCI/PCIe based (CompactPCI,ATCA…)<br />
PLC (Siemens S7)<br />
Data acquisiti<strong>on</strong><br />
C<strong>on</strong>trol software<br />
<br />
EPICS<br />
Simulati<strong>on</strong> envir<strong>on</strong>ments<br />
<br />
MATLAB/Simulink<br />
Ability to communicate in English in an internati<strong>on</strong>al envir<strong>on</strong>ment<br />
11
Required work experience<br />
The ideal integrator company should have<br />
experience in providing services of similar nature<br />
in an engineering area similar to that of ITER.<br />
Having gprovided support in <strong>on</strong>e of the<br />
aforementi<strong>on</strong>ed fields will be c<strong>on</strong>sidered<br />
potentially relevant.<br />
supporting large scientific experiments<br />
supporting aero spatial developments<br />
supporting complex military developments<br />
supporting nuclear industry developments<br />
supporting big industries (chemical,...)<br />
12
I&C integrator logistics<br />
Where shall the service be provided?<br />
50% @ I&C facility-ies – locati<strong>on</strong> where I&C systems are put<br />
together<br />
Final breakdown of design into modules<br />
Assemble of comp<strong>on</strong>ents: SW modules + cubicle comp<strong>on</strong>ents<br />
Perform any required comp<strong>on</strong>ent or system tests<br />
Support SAT & FAT tests with IO<br />
At main I&C facility – Space c<strong>on</strong>trolled independently by <str<strong>on</strong>g>F4E</str<strong>on</strong>g><br />
IO Site - for Site Acceptance Tests (SATs)<br />
<str<strong>on</strong>g>F4E</str<strong>on</strong>g> suppliers - for Factory Acceptance Tests (FATs)<br />
Other EU facilities (NBTF etc…)<br />
50% can be provided in integrator own facilities<br />
Any well identified package of work<br />
<br />
<br />
<br />
Implementati<strong>on</strong> of SW modules<br />
Individual test of SW modules<br />
….<br />
13
I&C Planning<br />
2011 2012 2013 2014 2015 2016 2017 2018 2019<br />
1 st in-sourcing 2 nd in-sourcing<br />
framework<br />
framework<br />
1 st integrator framework<br />
IO hardware services<br />
14