Cycling strategy - Blackburn with Darwen Borough Council
Cycling strategy - Blackburn with Darwen Borough Council
Cycling strategy - Blackburn with Darwen Borough Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Contents<br />
page<br />
Section 1: Introduction<br />
➔ Introduction<br />
➔ Key objectives<br />
➔ Vision<br />
04<br />
05<br />
05<br />
Section 2: Context<br />
➔ Attitudes to cycling<br />
➔ SWOT analysis<br />
➔ Cycle network development 1998 - 2007<br />
➔ Survey analysis<br />
➔ <strong>Cycling</strong> and healthy lifestyles<br />
➔ Climate change and air quality<br />
➔ Road safety<br />
➔ Cycle training and engagement<br />
➔ <strong>Cycling</strong> and travel plans<br />
➔ <strong>Cycling</strong> and rail<br />
➔ <strong>Cycling</strong> and tourism<br />
➔ Cycle audit<br />
06 - 07<br />
08 - 11<br />
12 - 14<br />
15 - 23<br />
23 - 24<br />
25 - 26<br />
26 - 29<br />
30 - 32<br />
32 - 35<br />
35 - 37<br />
37 - 39<br />
39 - 41<br />
Section 3: Priorities, policies and actions<br />
➔ Future cycle network development<br />
➔ Cycle <strong>strategy</strong> priorities<br />
➔ Cycle <strong>strategy</strong> policies<br />
➔ Cycle <strong>strategy</strong> action plan<br />
42 - 43<br />
44<br />
45 - 46<br />
46 - 51<br />
Appendices<br />
➔ Appendix 1: Local, regional and national policy context<br />
➔ Appendix 2: Survey of cycling infrastructure<br />
➔ Appendix 3: Map of existing cycle routes<br />
52 - 56<br />
57 - 62<br />
63<br />
03