▶ Power generation increases from 639GWh to 645GWh by preheating BFG.<br />
▶ Heat pipe heat exchanger is installed to preheat BFG with flue gas.<br />
▶ Flue gas temp’ drops from 185℃ to 154℃. but BFG temp’ increases from 20℃ to 80℃.<br />