<strong>COOLING</strong> <strong>PIPING</strong> <strong>PLANS</strong><br />
Many pumps in high temperature services require cooling water piping to the<br />
bearing housing or stuffing box jacket. Using API610 (5 th Ed.) as a basis of<br />
description, the following lists the optional standard plans that are available from<br />
Dean Pump. These plans are offered in steel and stainless steel and are offered in<br />
tubing or in piping to meet customer requirements. If a specific requirement is not<br />
shown, please contact the factory for assistance.<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 1
<strong>COOLING</strong> PLAN PER DEAN PUMP SK1191<br />
PARTIAL <strong>COOLING</strong> TO BEARING HOUSING<br />
Many customers furnish their own cooling piping plans for pumps in hot services. The connection from the<br />
stuffing box/ seal chamber cooling jacket to the inlet side of the bearing cooling coil is difficult for an<br />
inexperienced person because of the number of bends that must be made. Dean Plan SK1191 is the<br />
difficult piping that customers prefer not to do.<br />
SK1191<br />
Partial Cooling to<br />
Bearing Housing<br />
List Prices<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
$210 N/A $334 N/A<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 2
<strong>COOLING</strong> PLAN A – <strong>COOLING</strong> TO BEARING HOUSING<br />
Note: An Asterisk (*) Indicates an Optional Item, Supplied at Additional Cost, When Specified by the Customer<br />
Cooling water piping plans are designed to route cooling water to one or more pump features from the user<br />
cooling water system and return the flow to the system. All systems are furnished with either tubing or<br />
piping with a choice of carbon or stainless steel materials. All cooling systems are limited to a maximum<br />
working pressure of 125psi. All components are Dean choice and all plans are factory installed. Customers<br />
who wish to install their own cooling plans may wish to have a partial cooling plan (Reference Dean<br />
SK1191) installed by the factory. See SK1191.<br />
List Prices<br />
PLAN A<br />
Cooling to Bearing Housing<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
N/A $997 N/A $2,243<br />
Cooling Plan Optional Features<br />
Exit Side Valve (Each) $369 $377 $ 884 $ 884<br />
Exit Side Flow Indicator (Each) $382 $317 $1,050 $1,050<br />
Thermal Relief Valve<br />
Consult Factory<br />
NOTES:<br />
1. Stainless tubing, piping, and fittings will be 316SS construction.<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 3
<strong>COOLING</strong> PLAN B – <strong>COOLING</strong> TO BEARING HOUSING<br />
WITH PARALLEL GLAND QUENCH FLOW TO SEAL PLATE<br />
Note: An Asterisk (*) Indicates an Optional Item, Supplied at Additional Cost, When Specified by the Customer<br />
Cooling water piping plans are designed to route cooling water to one or more pump features from the user<br />
cooling water system and return the flow to the system. All systems are furnished with either tubing or<br />
piping with a choice of carbon or stainless steel materials. All cooling systems are limited to a maximum<br />
working pressure of 125psi. All components are Dean choice and all plans are factory installed. Customers<br />
who wish to install their own cooling plans may wish to have a partial cooling plan (Reference Dean<br />
SK1191) installed by the factory. See SK1191.<br />
PLAN B<br />
Cooling to Bearing Housing<br />
with Parallel Gland Quench<br />
Flow to Seal Plate<br />
List Prices<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
$1,566 $1,203 $2,782 $3,011<br />
Cooling Plan Optional Features<br />
Exit Side Valve (Each) $369 $377 $ 884 $ 884<br />
Exit Side Flow Indicator (Each) $382 $317 $1,050 $1,050<br />
Thermal Relief Valve<br />
Consult Factory<br />
NOTES:<br />
1. Stainless tubing, piping, and fittings will be 316SS construction.<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 4
<strong>COOLING</strong> PLAN C – <strong>COOLING</strong> TO STUFFING BOX/<br />
SEAL CHAMBER JACKET<br />
Note: An Asterisk (*) Indicates an Optional Item, Supplied at Additional Cost, When Specified by the Customer<br />
Cooling water piping plans are designed to route cooling water to one or more pump features from the user<br />
cooling water system and return the flow to the system. All systems are furnished with either tubing or<br />
piping with a choice of carbon or stainless steel materials. All cooling systems are limited to a maximum<br />
working pressure of 125psi. All components are Dean choice and all plans are factory installed. Customers<br />
who wish to install their own cooling plans may wish to have a partial cooling plan (Reference Dean<br />
SK1191) installed by the factory. See SK1191.<br />
PLAN C<br />
Cooling to Stuffing Box/<br />
Seal Chamber Jacket<br />
List Prices<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
$554 $986 $1,179 $2,180<br />
Cooling Plan Optional Features<br />
Exit Side Valve (Each) $369 $377 $ 884 $ 884<br />
Exit Side Flow Indicator (Each) $382 $317 $1,050 $1,050<br />
Thermal Relief Valve<br />
Consult Factory<br />
NOTES:<br />
1. Stainless tubing, piping, and fittings will be 316SS construction.<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 5
<strong>COOLING</strong> PLAN D – <strong>COOLING</strong> TO STUFFING BOX/SEAL<br />
CHAMBER JACKET WITH PARALLEL FLOW TO GLAND QUENCH<br />
Note: An Asterisk (*) Indicates an Optional Item, Supplied at Additional Cost, When Specified by the Customer<br />
Cooling water piping plans are designed to route cooling water to one or more pump features from the user<br />
cooling water system and return the flow to the system. All systems are furnished with either tubing or<br />
piping with a choice of carbon or stainless steel materials. All cooling systems are limited to a maximum<br />
working pressure of 125psi. All components are Dean choice and all plans are factory installed. Customers<br />
who wish to install their own cooling plans may wish to have a partial cooling plan (Reference Dean<br />
SK1191) installed by the factory. See SK1191.<br />
PLAN D<br />
Cooling to Stuffing Box/Seal<br />
Chamber Jacket with<br />
Parallel Flow to Gland Quench<br />
List Prices<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
$1,076 $1,191 $2,578 $2,941<br />
Cooling Plan Optional Features<br />
Exit Side Valve (Each) $369 $377 $ 884 $ 884<br />
Exit Side Flow Indicator (Each) $382 $317 $1,050 $1,050<br />
Thermal Relief Valve<br />
Consult Factory<br />
NOTES:<br />
1. Stainless tubing, piping, and fittings will be 316SS construction.<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 6
<strong>COOLING</strong> PLAN E – <strong>COOLING</strong> TO STUFFING BOX/SEAL<br />
CHAMBER JACKET AND BEARING HOUSING IN SERIES<br />
Note: An Asterisk (*) Indicates an Optional Item, Supplied at Additional Cost, When Specified by the Customer<br />
Cooling water piping plans are designed to route cooling water to one or more pump features from the user<br />
cooling water system and return the flow to the system. All systems are furnished with either tubing or<br />
piping with a choice of carbon or stainless steel materials. All cooling systems are limited to a maximum<br />
working pressure of 125psi. All components are Dean choice and all plans are factory installed. Customers<br />
who wish to install their own cooling plans may wish to have a partial cooling plan (Reference Dean<br />
SK1191) installed by the factory. See SK1191.<br />
PLAN E<br />
Cooling to Stuffing Box/Seal<br />
Chamber Jacket and<br />
Bearing Housing in Series<br />
List Prices<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
$787 $1,179 $1,591 $2,795<br />
Cooling Plan Optional Features<br />
Exit Side Valve (Each) $369 $377 $ 884 $ 884<br />
Exit Side Flow Indicator (Each) $382 $317 $1,050 $1,050<br />
Thermal Relief Valve<br />
Consult Factory<br />
NOTES:<br />
1. Stainless tubing, piping, and fittings will be 316SS construction.<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 7
<strong>COOLING</strong> PLAN F – <strong>COOLING</strong> TO STUFFING BOX/SEAL CHAMBER JACKET<br />
AND BEARING HOUSING IN SERIES WITH PARALLEL FLOW TO GLAND QUENCH<br />
Note: An Asterisk (*) Indicates an Optional Item, Supplied at Additional Cost, When Specified by the Customer<br />
Cooling water piping plans are designed to route cooling water to one or more pump features from the user<br />
cooling water system and return the flow to the system. All systems are furnished with either tubing or<br />
piping with a choice of carbon or stainless steel materials. All cooling systems are limited to a maximum<br />
working pressure of 125psi. All components are Dean choice and all plans are factory installed. Customers<br />
who wish to install their own cooling plans may wish to have a partial cooling plan (Reference Dean<br />
SK1191) installed by the factory. See SK1191.<br />
PLAN F<br />
Cooling to Stuffing Box/Seal<br />
Chamber Jacket and Bearing<br />
Housing in Series with Parallel<br />
Flow to Gland Quench<br />
Cooling Plan Optional Features<br />
List Prices<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
$1,173 $1,431 $2,760 $3,078<br />
Exit Side Valve (Each) $369 $377 $ 884 $ 884<br />
Exit Side Flow Indicator (Each) $382 $317 $1,050 $1,050<br />
Thermal Relief Valve<br />
Consult Factory<br />
NOTES:<br />
1. Stainless tubing, piping, and fittings will be 316SS construction.<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 8
<strong>COOLING</strong> PLAN G – <strong>COOLING</strong> TO PEDESTALS, STUFFING BOX/<br />
SEAL CHAMBER JACKET, AND BEARING HOUSING IN SERIES<br />
Note: An Asterisk (*) Indicates an Optional Item, Supplied at Additional Cost, When Specified by the Customer<br />
Cooling water piping plans are designed to route cooling water to one or more pump features from the user<br />
cooling water system and return the flow to the system. All systems are furnished with either tubing or<br />
piping with a choice of carbon or stainless steel materials. All cooling systems are limited to a maximum<br />
working pressure of 125psi. All components are Dean choice and all plans are factory installed. Customers<br />
who wish to install their own cooling plans may wish to have a partial cooling plan (Reference Dean<br />
SK1191) installed by the factory. See SK1191.<br />
PLAN G<br />
Cooling to Pedestals, Stuffing<br />
Box/Seal Chamber Jacket, and<br />
Bearing Housing in Series<br />
(See Note 1)<br />
List Prices<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
$2,188 $2,467 $2,905 $5,362<br />
Cooling Plan Optional Features<br />
Exit Side Valve (Each) $369 $377 $ 884 $ 884<br />
Exit Side Flow Indicator (Each) $382 $317 $1,050 $1,050<br />
Thermal Relief Valve<br />
Consult Factory<br />
NOTES:<br />
1. <strong>Water</strong> cooled pedestal, where required, are priced separately in the pump pricing section and are not included in the cooling<br />
piping pricing.<br />
2. Stainless tubing, piping, and fittings will be 316SS construction.<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 9
<strong>COOLING</strong> PLAN H – <strong>COOLING</strong> TO PEDESTALS, STUFFING BOX/SEAL CHAMBER JACKET,<br />
AND BEARING HOUSING IN SERIES WITH PARALLEL FLOW TO GLAND QUENCH<br />
Note: An Asterisk (*) Indicates an Optional Item, Supplied at Additional Cost, When Specified by the Customer<br />
Cooling water piping plans are designed to route cooling water to one or more pump features from the user<br />
cooling water system and return the flow to the system. All systems are furnished with either tubing or<br />
piping with a choice of carbon or stainless steel materials. All cooling systems are limited to a maximum<br />
working pressure of 125psi. All components are Dean choice and all plans are factory installed. Customers<br />
who wish to install their own cooling plans may wish to have a partial cooling plan (Reference Dean<br />
SK1191) installed by the factory. See SK1191.<br />
PLAN H<br />
Cooling to Pedestals, Stuffing<br />
Box/Seal Chamber Jacket, and<br />
Bearing Housing in Series<br />
with Parallel Flow to Gland Quench<br />
(See Note 1)<br />
Cooling Plan Optional Features<br />
List Prices<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
$2,378 $2,674 $3,914 $5,699<br />
Exit Side Valve (Each) $369 $377 $ 884 $ 884<br />
Exit Side Flow Indicator (Each) $382 $317 $1,050 $1,050<br />
Thermal Relief Valve<br />
NOTES:<br />
1. <strong>Water</strong> cooled pedestal, where required, are priced separately in the pump pricing section and are not included in the cooling<br />
piping pricing.<br />
2. Stainless tubing, piping, and fittings will be 316SS construction.<br />
Consult Factory<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 10
<strong>COOLING</strong> PLAN J – <strong>COOLING</strong> TO STUFFING BOX/SEAL CHAMBER<br />
JACKET WITH PARALLEL FLOW TO HEAT EXCHANGER<br />
Note: An Asterisk (*) Indicates an Optional Item, Supplied at Additional Cost, When Specified by the Customer<br />
Cooling water piping plans are designed to route cooling water to one or more pump features from the user<br />
cooling water system and return the flow to the system. All systems are furnished with either tubing or<br />
piping with a choice of carbon or stainless steel materials. All cooling systems are limited to a maximum<br />
working pressure of 125psi. All components are Dean choice and all plans are factory installed. Customers<br />
who wish to install their own cooling plans may wish to have a partial cooling plan (Reference Dean<br />
SK1191) installed by the factory. See SK1191.<br />
PLAN J<br />
Cooling to Stuffing Box/Seal<br />
Chamber Jacket with<br />
Parallel Flow to Heat Exchanger<br />
(See Note 1)<br />
List Prices<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
$2,706 $2,870 $6,345 $6,351<br />
Cooling Plan Optional Features<br />
Exit Side Valve (Each) $369 $377 $ 884 $ 884<br />
Exit Side Flow Indicator (Each) $382 $317 $1,050 $1,050<br />
Thermal Relief Valve<br />
Consult Factory<br />
NOTES:<br />
1. The heat exchanger is not included in the cooling piping pricing. The cooling system does require a heat exchanger which is<br />
provided with the seal flush piping. Review your offering carefully.<br />
2. Stainless tubing, piping, and fittings will be 316SS construction.<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 11
<strong>COOLING</strong> PLAN K – <strong>COOLING</strong> TO STUFFING BOX/SEAL CHAMBER JACKET AND<br />
BEARING HOUSING IN SERIES WITH PARALLEL FLOW TO HEAT EXCHANGER<br />
Note: An Asterisk (*) Indicates an Optional Item, Supplied at Additional Cost, When Specified by the Customer<br />
Cooling water piping plans are designed to route cooling water to one or more pump features from the user<br />
cooling water system and return the flow to the system. All systems are furnished with either tubing or<br />
piping with a choice of carbon or stainless steel materials. All cooling systems are limited to a maximum<br />
working pressure of 125psi. All components are Dean choice and all plans are factory installed. Customers<br />
who wish to install their own cooling plans may wish to have a partial cooling plan (Reference Dean<br />
SK1191) installed by the factory. See SK1191.<br />
PLAN K<br />
Cooling to Stuffing Box/Seal<br />
Chamber Jacket and Bearing<br />
Housing in Series with Parallel<br />
Flow to Heat Exchanger<br />
(See Note 1)<br />
Cooling Plan Optional Features<br />
List Prices<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
$2,970 $3,091 $6,787 $6,985<br />
Exit Side Valve (Each) $369 $377 $ 884 $ 884<br />
Exit Side Flow Indicator (Each) $382 $317 $1,050 $1,050<br />
Thermal Relief Valve<br />
NOTES:<br />
1. The heat exchanger is not included in the cooling piping pricing. The cooling system does require a heat exchanger which is<br />
provided with the seal flush piping. Review your offering carefully.<br />
2. Stainless tubing, piping, and fittings will be 316SS construction.<br />
Consult Factory<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 12
<strong>COOLING</strong> PLAN L – <strong>COOLING</strong> TO PEDESTALS, STUFFING BOX/SEAL CHAMBER JACKET,<br />
AND BEARING HOUSING IN SERIES WITH PARALLEL FLOW TO HEAT EXCHANGER<br />
Note: An Asterisk (*) Indicates an Optional Item, Supplied at Additional Cost, When Specified by the Customer<br />
Cooling water piping plans are designed to route cooling water to one or more pump features from the user<br />
cooling water system and return the flow to the system. All systems are furnished with either tubing or<br />
piping with a choice of carbon or stainless steel materials. All cooling systems are limited to a maximum<br />
working pressure of 125psi. All components are Dean choice and all plans are factory installed. Customers<br />
who wish to install their own cooling plans may wish to have a partial cooling plan (Reference Dean<br />
SK1191) installed by the factory. See SK1191.<br />
PLAN L<br />
Cooling to Pedestals, Stuffing<br />
Box/Seal Chamber Jacket, and<br />
Bearing Housing in Series with<br />
Parallel Flow to Heat Exchanger<br />
(See Notes 1 & 2)<br />
Cooling Plan Optional Features<br />
List Prices<br />
Steel Tubing Steel Piping Stainless Tubing Stainless Piping<br />
$3,305 $3,481 $7378 $7,702<br />
Exit Side Valve (Each) $369 $377 $ 884 $ 884<br />
Exit Side Flow Indicator (Each) $382 $317 $1,050 $1,050<br />
Thermal Relief Valve<br />
Consult Factory<br />
NOTES:<br />
1. The heat exchanger is not included in the cooling piping pricing. The cooling system does require a heat exchanger which is provided with the<br />
seal flush piping. Review your offering carefully.<br />
2. <strong>Water</strong> cooled pedestals, where required, are priced separately in the pump pricing section and are not included in the cooling piping pricing.<br />
3. Stainless tubing, piping, and fittings will be 316SS construction.<br />
Effective: FEBRUARY 2011 • Replaces: NEW<br />
Page 13