30.10.2014 Views

Gas Transportation Enquiry Form - Gaslink

Gas Transportation Enquiry Form - Gaslink

Gas Transportation Enquiry Form - Gaslink

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Enquiry</strong> Details<br />

GAS TRANSPORTATION ENQUIRY FORM<br />

Company Name: Company Name<br />

Contact Name: Contact Name<br />

Address: Address 1<br />

Address 2<br />

Address 3<br />

Project No:<br />

For internal use only<br />

Phone No:<br />

Fax No:<br />

Email Address:<br />

Phone Number<br />

Fax Number<br />

E-Mail Address<br />

Description of Purpose/Use: (If necessary, please furnish additional details on a second page and attach to this form.)<br />

Description of Purpose 1<br />

Description of Purpose 2<br />

Description of Purpose 3<br />

Location :<br />

Location<br />

(If possible, please supply a detailed site map.)<br />

Load Details : MHQ (KWh): Load Details<br />

MDQ (KWh): Load Details<br />

Pressure (Barg): Pressure<br />

Ramp Rate (KW/min): Ramp Rate<br />

LOAD FACTOR (%): Load Factor (if applicable) EAC (KWh): Est. Annual Consumption<br />

Requested Supply Date of <strong>Gas</strong>: Date Phasing of Load: Phasing of Load<br />

Signed: Signature Date: Date<br />

“Maximum Daily Quantity” and its abbreviation “MDQ” means the maximum Quantity of a Shipper’s Natural <strong>Gas</strong> to be delivered at an Entry Point and<br />

offtaken at an Exit Point on any Day in any <strong>Gas</strong> Year consistent with such Shipper’s Reserved Capacity and as provided in such Shipper’s <strong>Transportation</strong><br />

Agreement.<br />

“Maximum Hourly Quantity” and its abbreviation “MHQ” shall mean the maximum offtake rate (expressed in kWh) at any time during the Day for a Shipper’s<br />

Natural <strong>Gas</strong> to be offtaken at an Exit Point consistent with the MDQ for such Shipper and its Reserved Capacity all as provided for in such Shipper’s<br />

<strong>Transportation</strong> Agreement.<br />

<strong>Enquiry</strong> received by New Connections Department of <strong>Gas</strong>link for the provision of a gas transportation<br />

service.<br />

Received by:<br />

Date:<br />

_____________________________________________________________________________________<br />

A design charge is required to cover the initial desktop work required as an input to the initial offer letter. These charges are as follows:<br />

Loads with annual consumption below 4,500,000 kWh: no charge<br />

Loads with annual consumption between 4,500,000 and 22,000,000 kWh: € 724.93 + VAT


Loads with annual consumption above 22,000,000 kWh: €3,624.66 + VAT.<br />

These charges should be paid when the inquiry form is submitted. The charges will be offset against connection contributions where the<br />

customer proceeds with the connection.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!