<strong>Enquiry</strong> Details<br />
GAS TRANSPORTATION ENQUIRY FORM<br />
Company Name: Company Name<br />
Contact Name: Contact Name<br />
Address: Address 1<br />
Address 2<br />
Address 3<br />
Project No:<br />
For internal use only<br />
Phone No:<br />
Fax No:<br />
Email Address:<br />
Phone Number<br />
Fax Number<br />
E-Mail Address<br />
Description of Purpose/Use: (If necessary, please furnish additional details on a second page and attach to this form.)<br />
Description of Purpose 1<br />
Description of Purpose 2<br />
Description of Purpose 3<br />
Location :<br />
Location<br />
(If possible, please supply a detailed site map.)<br />
Load Details : MHQ (KWh): Load Details<br />
MDQ (KWh): Load Details<br />
Pressure (Barg): Pressure<br />
Ramp Rate (KW/min): Ramp Rate<br />
LOAD FACTOR (%): Load Factor (if applicable) EAC (KWh): Est. Annual Consumption<br />
Requested Supply Date of <strong>Gas</strong>: Date Phasing of Load: Phasing of Load<br />
Signed: Signature Date: Date<br />
“Maximum Daily Quantity” and its abbreviation “MDQ” means the maximum Quantity of a Shipper’s Natural <strong>Gas</strong> to be delivered at an Entry Point and<br />
offtaken at an Exit Point on any Day in any <strong>Gas</strong> Year consistent with such Shipper’s Reserved Capacity and as provided in such Shipper’s <strong>Transportation</strong><br />
Agreement.<br />
“Maximum Hourly Quantity” and its abbreviation “MHQ” shall mean the maximum offtake rate (expressed in kWh) at any time during the Day for a Shipper’s<br />
Natural <strong>Gas</strong> to be offtaken at an Exit Point consistent with the MDQ for such Shipper and its Reserved Capacity all as provided for in such Shipper’s<br />
<strong>Transportation</strong> Agreement.<br />
<strong>Enquiry</strong> received by New Connections Department of <strong>Gas</strong>link for the provision of a gas transportation<br />
service.<br />
Received by:<br />
Date:<br />
_____________________________________________________________________________________<br />
A design charge is required to cover the initial desktop work required as an input to the initial offer letter. These charges are as follows:<br />
Loads with annual consumption below 4,500,000 kWh: no charge<br />
Loads with annual consumption between 4,500,000 and 22,000,000 kWh: € 724.93 + VAT
Loads with annual consumption above 22,000,000 kWh: €3,624.66 + VAT.<br />
These charges should be paid when the inquiry form is submitted. The charges will be offset against connection contributions where the<br />
customer proceeds with the connection.