the shutter mechanism is mounted is much weaker than on the original OCB truck,<br />

which makes the operation of the shutters less reliable.<br />

• After the incident all the retrofit VCB trucks were racked out and replaced by the<br />

original OCBs. After withdrawal of the breaker truck in the Oman House feeder at<br />

<strong>Muttrah</strong> by engineers of MDEC a broken pin of the latching mechanism of one<br />

shutter was found.<br />

FIGURE 8<br />

Interference with<br />

shutter mechanism.<br />

New VCB Truck<br />

Failed VCB Truck<br />

6.2 The ABB Italy <strong>Report</strong><br />

The inquiry was given access to an internal <strong>Report</strong> prepared by ABB Italy. Since the<br />

report was internal to ABB it is not possible to reproduce it here. However the inquiry is<br />

able to summarise the broad findings of the ABB <strong>Report</strong>.<br />

The ABB Italy report identifies the following design deficiencies:<br />

Contact arms<br />

a) The contact arms are not symmetrical in respect of the center of the bushing.<br />

Considering the bending tolerances the contact arms may have interference with the<br />

internal diameter of the bushing.<br />

b) The contact arms are made by a copper bar of rectangular cross section 10x50mm<br />

with the edge radius of 2mm. Such edge radius is not ideal <strong>for</strong> the heat-shrink insulation,<br />

increasing the possibility of damage of the insulation during the assembling, packaging<br />