10 RECOMMENDATIONS<br />

The inquiry makes the following recommendations:<br />

10.1 Retrofitting<br />

Further retrofitting of switchgear should not be carried out unless:<br />

• It is carried out by the original equipment manufacturer (OEM); or<br />

• If carried out by someone other than the OEM it shall be subject to testing in the<br />

original cubicle and witnessed by a reputable switchgear test house.<br />

10.2 Contracts<br />

Licencees should ensure that:<br />

• When submitting offers, contractors/suppliers comply strictly with all the terms and<br />

conditions of the invitation to tender and that they are qualified to submit a tender;<br />

• That all the terms and conditions of a contract (e.g. production of drawings,<br />

certificates etc ) are en<strong>for</strong>ced;<br />

• That close liaison is maintained between the Contracts Department and the field<br />

staff responsible <strong>for</strong> the supervision of the execution of a contract.<br />

10.3 Site Safety<br />

Licencees should ensure that:<br />

• A safety risk assessment is carried out <strong>for</strong> all non-routine work on or adjacent to live<br />

equipment. This assessment should be carried out by an HSE specialist not involved<br />

in the proposed work.<br />

35