01.11.2014 Views

View this Presentation - Penn Virginia Corporation

View this Presentation - Penn Virginia Corporation

View this Presentation - Penn Virginia Corporation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Strong and Consistent Initial Production Rates<br />

Both PVA’s legacy assets and the acquired position have strong and repeatable results<br />

PVA Legacy Assets<br />

Acquired MHR Assets<br />

Gonzales Lavaca Gonzales Lavaca<br />

30‐Day Avg (BOEPD) IP (BOEPD) 30‐Day Avg (BOEPD) IP (BOEPD)<br />

• Average Gonzales IP / 30‐Day Rate of 921 / 621 BOEPD<br />

• Average Lavaca IP / 30‐Day Rate of 939 / 644 BOEPD<br />

• Gonzales Averages of 15 Stages and 3,713’ Lateral Length (LL)<br />

• Lavaca Averages of 19 Stages and 4,583’ LL<br />

• Average Gonzales IP / 30‐Day Rate of 1,065 / 678 BOEPD<br />

• Average Lavaca IP / 30‐Day Rate of 1,503 / 849 BOEPD<br />

• Gonzales Averages of 16 Stages and 4,605’ LL<br />

• Lavaca Averages of 22 Stages and 6,114’ LL<br />

Note: The following PVA wells had operational difficulty or short laterals: Vana 1H, Pavlicek 1H, Rock Creek Ranch 7H and 8H, Cannonade Ranch 3H, Munson Ranch 9H, Rock Creek Ranch 3H and 4H.<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!