02.11.2014 Views

Boiler Water.pdf - The Jamaican Sugar Industry

Boiler Water.pdf - The Jamaican Sugar Industry

Boiler Water.pdf - The Jamaican Sugar Industry

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Conductivity Meter Setup<br />

1. Install automatic dump valve prior to feed water storage tank<br />

2. Place conductivity probe in condensate line prior to the dump<br />

valve<br />

1. False sugar positives will occur during stop and go<br />

production as ammonia will buildup and set-off the alarm<br />

3. Set the conductivity valve set-point just above the background<br />

reading<br />

4. When the conductivity meter sets off the alarm, the dump valve<br />

should open automatically<br />

5. Factory personnel should test the water with Alpha-Naphthol<br />

Test<br />

1. Find the point of contamination or if it was a false positive,<br />

close the automatic valve.<br />

Confidential and proprietary to Garratt-Callahan Company

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!