Production and utilization of biogas in Estonia (Mr. Ülo ... - BEF Group

Production and utilization of biogas in Estonia (Mr. Ülo ... - BEF Group

Production and utilization of biogas in Estonia (Mr. Ülo ... - BEF Group

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Production</strong> <strong>and</strong> <strong>utilization</strong> <strong>of</strong><br />

<strong>biogas</strong> <strong>in</strong> <strong>Estonia</strong><br />

Ülo Kask,<br />

Tall<strong>in</strong>n University <strong>of</strong> Technology<br />

11.06.2008, Riga


Topics to be discussed<br />

• About history on <strong>biogas</strong> projects <strong>in</strong><br />

<strong>Estonia</strong><br />

• Changes <strong>in</strong> <strong>Estonia</strong>n agriculture <strong>and</strong><br />

economy<br />

• Ongo<strong>in</strong>g projects<br />

• L<strong>and</strong>fill gas <strong>and</strong> <strong>biogas</strong> projects<br />

• Future prospective <strong>and</strong> plans


<strong>Estonia</strong><br />

• Total area 45 th<br />

km 2<br />

• Forest area 21 th km 2<br />

• Degree days 4220<br />

• Average temperature<br />

– January 1996 -7.0<br />

o<br />

C<br />

– July 1996<br />

15.0 o C<br />

• Population 1.345 mio<br />

• Population density<br />

30 per km 2<br />

• Currency<br />

<strong>Estonia</strong>n kroon = 100<br />

sents<br />

15.6466 EEK = 1 €


Former <strong>biogas</strong> projects<br />

• Biogas plant <strong>in</strong> Pärnu based on animal (pig)<br />

manure<br />

– In operation: 1987-1997 (Est. - Czech jo<strong>in</strong>t project)<br />

– <strong>Production</strong> 6210 nm 3 /day (<strong>in</strong> 1997: 3500 nm 3 /day)<br />

– Operation stopped <strong>in</strong> 1997 due to clos<strong>in</strong>g the pig<br />

farm<br />

• Biogas plant at L<strong>in</strong>namäe based on animal<br />

(pig) manure<br />

– In operation: 1987- 1995 (Danish technology)<br />

– Operation stopped <strong>in</strong> 1995 due to corrosion<br />

damages <strong>of</strong> the concrete tanks


Change <strong>of</strong> livestock <strong>in</strong> <strong>Estonia</strong><br />

1200<br />

1000<br />

800<br />

Cattle<br />

..dairy cows<br />

Pigs<br />

Sheep <strong>and</strong> goats<br />

Horses*<br />

Thous<strong>and</strong>s<br />

600<br />

400<br />

200<br />

0<br />

1980 1985 1990 1995 2000 2005


Number <strong>of</strong> hold<strong>in</strong>gs by number <strong>of</strong><br />

dairy cows<br />

1-2<br />

heads<br />

3-9<br />

heads<br />

10-19<br />

heads<br />

20-29<br />

heads<br />

30-49<br />

heads<br />

2001 13073 3181 622 176 122<br />

2003 9273 1947 511 179 144<br />

2005 6619 1463 444 177 150<br />

50-99 100-199 200-299 >=300<br />

Total heads heads heads heads<br />

2001 17527 104 113 60 76<br />

2003 12397 97 102 64 81<br />

2005 9210 112 99 60 86<br />

Heads = cows <strong>in</strong> herd


Pigs <strong>in</strong> hold<strong>in</strong>gs<br />

Number <strong>of</strong><br />

hold<strong>in</strong>gs<br />

Number<br />

<strong>of</strong> pigs<br />

Average<br />

hold<strong>in</strong>g size<br />

pigs/hold<strong>in</strong>g<br />

2001 11 791 328 920 28<br />

2003 7 674 356 899 47<br />

2005 4 707 355 242 75


Theoretical potential <strong>of</strong> <strong>biogas</strong> from manure by type <strong>of</strong> animals (poultry,<br />

horses, sheep, pigs, cattle) <strong>in</strong> <strong>Estonia</strong><br />

Biogaas, m 3 /a<br />

9 000 000<br />

8 000 000<br />

7 000 000<br />

6 000 000<br />

Biogaas kanasõnnikust<br />

Biogaas hobusesõnnikust<br />

Biogaas lambasõnnikust<br />

Biogaas seasõnnikust<br />

Biogaas veisesõnnikust<br />

5 000 000<br />

4 000 000<br />

3 000 000<br />

2 000 000<br />

1 000 000<br />

0<br />

Harju Hiiu Ida-<br />

Viru<br />

Jõgeva Järva Lääne Lääne-<br />

Viru<br />

Põlva Pärnu Rapla Saare Tartu Valga Vilj<strong>and</strong>i Võru<br />

Maakond


Theoretical potential <strong>of</strong> <strong>biogas</strong> from biodegradable waste,<br />

sewage sludge <strong>and</strong> manure <strong>in</strong> <strong>Estonia</strong><br />

Biogas, m3/a<br />

16 000 000<br />

14 000 000<br />

12 000 000<br />

Biogas from Biodegredable Waste<br />

Biogas from Sewage Sluges<br />

Biogas from Manure<br />

10 000 000<br />

8 000 000<br />

6 000 000<br />

4 000 000<br />

2 000 000<br />

0<br />

Harju<br />

Hiiu<br />

Ida-Viru<br />

Rapla<br />

Saare<br />

Tartu<br />

Valga<br />

Vilj<strong>and</strong>i<br />

County


Theoretical potential <strong>of</strong> <strong>biogas</strong> from herbaceous biomass (energy<br />

crops), biodegradable waste, sewage sludge <strong>and</strong> manure <strong>in</strong> <strong>Estonia</strong><br />

45 000 000<br />

40 000 000<br />

35 000 000<br />

Biogaas hohelisest biomassist<br />

Biogaas biolag.jäätmetest<br />

Biogaas heitvee mudast<br />

Biogaas sõnnikust<br />

30 000 000<br />

25 000 000<br />

20 000 000<br />

15 000 000<br />

10 000 000<br />

5 000 000<br />

1<br />

0<br />

Harju Hiiu Ida-<br />

Viru<br />

Jõgeva Järva Lääne Lääne- Põlva Pärnu Rapla Saare Tartu Valga Vilj<strong>and</strong>i Võru<br />

Viru<br />

Maakond<br />

Biogaas, m3/a


Potential <strong>of</strong> heat <strong>and</strong> electricity from waste <strong>biogas</strong><br />

Nr<br />

County<br />

Electricity<br />

from<br />

manure<br />

Heat from<br />

manure<br />

Electricity<br />

from<br />

sewage<br />

sludge<br />

Heat from<br />

sewage<br />

sludge<br />

Electricity<br />

from<br />

biodegradable<br />

waste<br />

Heat from<br />

biodegradable<br />

waste<br />

Total<br />

electricity<br />

Total<br />

heat<br />

Total<br />

electrical<br />

capacity<br />

<strong>of</strong> CHP<br />

Total heat<br />

capacity<br />

<strong>of</strong> CHP<br />

MWh el MWh th MWh el MWh th MWh el MWh th MWh el MWh th MW el MW th<br />

1 Harju 22 338 23 048 11 790 12 165 3 199 3 301 37 328 38 514 4,67 4,81<br />

2Hiiu 2 448 2 526 0 0 48 50 2 497 2 576 0,31 0,32<br />

3Ida-Viru 3 587 3 701 4 616 4 762 149 154 8 352 8 617 1,04 1,08<br />

4 Jõgeva 16 366 16 886 0 0 2 349 2 424 18 715 19 310 2,34 2,41<br />

5Järva 18 354 18 937 232 239 104 108 18 690 19 284 2,34 2,41<br />

6 Lääne 6 394 6 597 0 0 133 137 6 526 6 734 0,82 0,84<br />

7 Lääne-<br />

Viru 22 947 23 676 445 459 11 802 12 177 35 194 36 313 4,40 4,54<br />

8 Põlva 10 968 11 316 0 0 96 99 11 064 11 415 1,38 1,43<br />

9 Pärnu 14 139 14 589 1 078 1 113 615 635 15 833 16 336 1,98 2,04<br />

10 Rapla 12 727 13 132 0 0 0 0 12 727 13 132 1,59 1,64<br />

11 Saare 12 677 13 080 366 378 1 168 1 205 14 211 14 663 1,78 1,83<br />

12 Tartu 11 343 11 703 1 875 1 934 1 554 1 603 14 771 15 241 1,85 1,91<br />

13 Valga 6 294 6 494 185 191 164 169 6 643 6 854 0,83 0,86<br />

14 Vilj<strong>and</strong>i 21 678 22 367 0 0 65 67 21 743 22 434 2,72 2,80<br />

15 Võru 7 347 7 581 259 267 4 142 4 273 11 748 12 121 1,47 1,52<br />

Total 189 607 195 634 20 845 21 507 25 589 26 402 236 041 243 544 29,5 30,4


OÜ Saare Economics Jööri <strong>biogas</strong><br />

project<br />

• Location (on isl<strong>and</strong>s) – Saare county Valjala<br />

parish<br />

• Project started <strong>in</strong> 2004, ma<strong>in</strong> construction <strong>and</strong><br />

<strong>in</strong>stallation works f<strong>in</strong>ished <strong>in</strong> autumn 2005<br />

• Official open<strong>in</strong>g 10.03.2006, adjustments up to<br />

autumn 2006<br />

• Biogas production technology from Belgium -<br />

company <strong>Group</strong> Machiels<br />

• CHP technology from Germany – company<br />

MDE


OÜ Saare Economics Jööri <strong>biogas</strong> project<br />

• Manure is collected from 8 pig farms with 27 000<br />

pigs – 40 000 t/a<br />

• Sludge from Kuressaare sewage water treatment<br />

plant – 3 000 t/a<br />

• Biogas production – 2.4 mio m 3 /a<br />

• Capacity <strong>of</strong> CHP unit – 350 kW el <strong>and</strong> 350 kW th<br />

• Estimated energy production –<br />

– 2 200 MWh el /a, 25% should be sold to grid, 75% is own<br />

dem<strong>and</strong><br />

– 3 500 MWh th – will be used for heat<strong>in</strong>g the digester <strong>and</strong><br />

for space heat<strong>in</strong>g<br />

• Water from digestion residue is removed us<strong>in</strong>g<br />

centrifuge. Both solid <strong>and</strong> liquid parts after<br />

centrifug<strong>in</strong>g will be used as fertilizer, solid part<br />

might be sold


OÜ Saare Economics Jööri <strong>biogas</strong> project<br />

• Total <strong>in</strong>vestment cost – 60 mil EEK = 3.83<br />

M€<br />

– 12% from <strong>in</strong>vestment cost – support from EU<br />

Life programme<br />

– 75% from <strong>in</strong>vestment cost – loan<br />

– Other – support from EU structural funds<br />

• Equipment cost - 50 mil EEK = 3.19 M€<br />

– Cost <strong>of</strong> equipment for digestion <strong>and</strong> water<br />

treatment – 50% <strong>of</strong> equipment cost<br />

– Cost <strong>of</strong> CHP <strong>in</strong>stallation 50% <strong>of</strong> equipment cost


Other <strong>biogas</strong> projects<br />

• In Tall<strong>in</strong>n Sewage Water Treatment Plant<br />

the yearly sewage gas production is<br />

2.8 Mm 3 /y <strong>and</strong> it energy content <strong>in</strong> <strong>biogas</strong><br />

exceeds 13 GWh/y<br />

• In Narva Sewage Water Treatment Plant<br />

<strong>biogas</strong> project should start <strong>in</strong> 2008 - 2009


Tall<strong>in</strong>n Pääsküla l<strong>and</strong>fill<br />

• Tall<strong>in</strong>n - population about 400,000 <strong>in</strong>habitants<br />

• Annually 200 - 220 thous<strong>and</strong> tons <strong>of</strong> organic waste<br />

has been generated <strong>and</strong> stored <strong>in</strong> the Pääsküla<br />

l<strong>and</strong>fill<br />

• The Pääsküla l<strong>and</strong>fill was <strong>in</strong> operation from 1962 until<br />

2003<br />

• L<strong>and</strong>fills area occurs about 25 ha with the average<br />

height <strong>of</strong> garbage layer up to 40 meters<br />

• In 1994 A new company Terts Ltd was founded <strong>and</strong> it<br />

started to carry out a <strong>biogas</strong>-produc<strong>in</strong>g project at<br />

Pääsküla<br />

• In 1994 3000 meters <strong>of</strong> gas filters <strong>and</strong> 1000 meters <strong>of</strong><br />

connections pipes was <strong>in</strong>stalled. Today these<br />

numbers are 10000 m <strong>and</strong> 5000 m


L<strong>and</strong>fill gas <strong>utilization</strong> phases<br />

• L<strong>and</strong>fill gas collection began <strong>in</strong> 1994 (commission<strong>in</strong>g date Dec.<br />

1994)<br />

– Estimated <strong>biogas</strong> production 1000 nm 3 /h with CH 4 content<br />

50%<br />

– Gas was used for heat<strong>in</strong>g about 1000 apartments<br />

• First cogeneration heat <strong>and</strong> power station (CHP), owned by<br />

Terts Ltd, was commissioned on December, 2001.<br />

• Second CHP, owned by Terts Ltd, was commissioned on<br />

November, 2004<br />

• Installed ord<strong>in</strong>ary Otto gas eng<strong>in</strong>es made by company<br />

Jenbacher (Austria)<br />

• Electrical output <strong>of</strong> both CHP units - 836 kW <strong>and</strong> thermal output<br />

- 1050 kW<br />

• Today the waste disposal to Pääsküla l<strong>and</strong>fill has f<strong>in</strong>ished <strong>and</strong><br />

l<strong>and</strong>fill has covered


Pääsküla l<strong>and</strong>fill


Data on <strong>biogas</strong> project<br />

Estimated <strong>biogas</strong> output up to 1000 nm 3 /h<br />

after clos<strong>in</strong>g the l<strong>and</strong>fill output<br />

should <strong>in</strong>crease up to 1500<br />

nm 3 /h<br />

Methane content <strong>in</strong> <strong>biogas</strong> CH 4<br />

content about 62 %<br />

(2005), (presumed 50 %)<br />

Total production <strong>of</strong> heat energy<br />

(sold)<br />

Investment cost <strong>in</strong> 1994<br />

All <strong>in</strong>vestments to 2003<br />

To 2005<br />

9-10 GWh/year (2004-2005)<br />

5 million EEK (0.32 million €)<br />

15 million EEK (0.96 million €)<br />

28 million EEK (1.79 million €)


Products supplied<br />

• Biogas → to DH company Tall<strong>in</strong>na Küte AS<br />

• Heat → to DH companies Tall<strong>in</strong>na Küte AS<br />

<strong>and</strong> Fortum Termest AS<br />

• Power → to power company Eesti Energia AS


Energy output from Pääsküla<br />

l<strong>and</strong>fill plant<br />

2002 2003 2004 2005 2006 2007<br />

Biogas, MWh 6 957 7 047 1 120 935 825<br />

635<br />

Heat, MWh 5 771 4 658 5 755 9 589 9 982 8 988<br />

Electricity,<br />

MWh<br />

Turnover,<br />

MEEK/M€<br />

6 804 6 067 7 214 12 416 13 135 12 405<br />

7.4/<br />

0.47<br />

6,6/<br />

0.42<br />

6.8/<br />

0.43<br />

12.0/<br />

0.77<br />

12.8/<br />

0.82<br />

15.9/<br />

1.02


Potential <strong>biogas</strong> production <strong>of</strong> largest <strong>Estonia</strong>n l<strong>and</strong>fills<br />

Jrk<br />

nr<br />

Prügila<br />

H<strong>in</strong>nangul<strong>in</strong>e<br />

prügi mass, mln<br />

t<br />

Massi<br />

gaasitootlikkus<br />

H<strong>in</strong>nangul<strong>in</strong>e<br />

gaasitook 20 a<br />

jooksul, mln m 3<br />

Primaarenergia<br />

hulk, GWh<br />

125 m 3 /t 150 m 3 /t 125 m 3 /t 150 m 3 /t<br />

1 Pääsküla, Tall<strong>in</strong>n * 4 500 600 2500 3000<br />

2 Aardlapalu, Tartu (Lange) 1,5 187,5 225 937,5 1125<br />

3 Narva, Ida-Virumaa (Arumäe) 0,8 100 120 500 600<br />

4 Pärnu, Pärnumaa 0,2 25 30 125 150<br />

5 Võru, Võrumaa (Räpo) 0,1 12,5 15 62,5 75<br />

6 Valga, Valgamaa 0,097 12,125 14,55 60,625 72,75<br />

Kokku 6,7 837,1 1004,6 4185,6 5022,8<br />

Calorific value <strong>of</strong> l<strong>and</strong>fill gas ~5 kWh/m 3


Other l<strong>and</strong>fill gas projects<br />

New Tall<strong>in</strong>n<br />

l<strong>and</strong>fill<br />

Uikala l<strong>and</strong>fill<br />

(Ida-Viru<br />

county)<br />

Väätsa l<strong>and</strong>fill<br />

(Järva county)<br />

L<strong>and</strong>fill gas is<br />

collected <strong>and</strong><br />

combusted <strong>in</strong><br />

order to avoid<br />

CH 4 emissions<br />

to the<br />

atmosphere<br />

Not plans for<br />

CHP, yet<br />

In 2007 a CHP<br />

unit should be<br />

<strong>in</strong>stalled<br />

Too small<br />

l<strong>and</strong>fill for CHP<br />

unit


Future plans<br />

• Jõelähtme parish (located nearby Tall<strong>in</strong>n)<br />

– In 2003 270,460 t <strong>of</strong> organic waste has been<br />

collected. From total amount <strong>of</strong> organic waste<br />

76.7% might be used for <strong>biogas</strong> production, i.e<br />

207,418 t/a<br />

– Manure from local cattle <strong>and</strong> big farms should<br />

be collected from the distance up to 40 km<br />

• From the year 2007 few farms have been<br />

carried out feasibility studies on manure-toenergy<br />

projects


Biogas stations <strong>in</strong> <strong>Estonia</strong> (red – work<strong>in</strong>g ones,<br />

brown - under design


Thank you for attention!