LQP 1-3 Supplier Quality Planning - Procedures<br />

IMS CONNECTOR SYSTEMS Kft<br />

Ipar Krt. 27.<br />

H-9400 Sopron<br />

Tel +3699-513-508<br />

Fax+3699-513-534<br />

• In the event of manufacture of an additional tool for formed parts, steps 6 to 14 must be<br />

completed<br />

• If a tool is replaced by a new one or if a tool is revised, steps 6 to 14 must be completed<br />

• At the change of the machine type, steps 6, 7, 12, 13 and 14 must be completed.<br />

Series parts will not be accepted without prior approval by IMS-<strong>CS</strong>!<br />

<strong>RL</strong>-<strong>CS</strong>-<strong>007b</strong>-<strong>Guideline</strong><br />

<strong>Approval</strong> <strong>procedure</strong> <strong>LQP1</strong>-3<br />

Rev. 06 of the 09.12.2009 Page 4 of 20