Premiere Edition - ACEC|Manitoba
Premiere Edition - ACEC|Manitoba
Premiere Edition - ACEC|Manitoba
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2010 11th Annual Awards of Excellence in Consulting Engineering<br />
Awards of Merit<br />
Infrastructure/Transportation<br />
Project:<br />
Firm:<br />
Client:<br />
Category:<br />
Procurement of Design Build Grade<br />
Separations for CentrePort Canada Way<br />
MMM Group Limited<br />
Province of Manitoba – Department of<br />
Infrastructure and Transportation<br />
Infrastructure/Transportation<br />
In October 2008, the Province of Manitoba passed the<br />
CentrePort Act creating an exciting new project called<br />
CentrePort Canada Way. Winnipeg’s geographic location in the<br />
centre of Canada provided a unique opportunity to provide<br />
a transportation hub to Central Canada and the Heartland<br />
of the United States of America. An area north west of James<br />
Armstrong Richardson International Airport was selected for<br />
development of the Inland Port. To facilitate this vision they<br />
needed to construct an Interchange on the Perimeter Highway<br />
and CentrePort Canada Way; a bridge over the existing<br />
CPR Carberry Subdivision, and a bridge over the existing<br />
Saskatchewan Avenue and CPR Glenboro Subdivisions.<br />
MIT selected the Design Build project delivery method and<br />
engaged the MMM Group to fast tract the preparation of the<br />
Design Build Documents and the Functional Planning Study<br />
for the CentrePort Canada Way Project.<br />
Environmental<br />
Project:<br />
Firm:<br />
Client:<br />
Category:<br />
Lynn Lake Solid Waste Disposal Ground<br />
J.R. Cousin Consultants Ltd.<br />
Manitoba Innovation, Energy and Mines<br />
Environmental<br />
The Town of Lynn Lake solid waste disposal ground<br />
(SWDG) was located in a mine tailings area, posing a variety<br />
of potential health and environmental issues. Manitoba<br />
Innovation, Energy and Mines, in cleaning up toxic mine<br />
tailing sites, required the closure of the SWDG.<br />
A new Solid Waste Disposal Ground was needed to<br />
provide Lynn Lake and Marcel Colomb First Nation with<br />
an environmentally responsible facility with designated<br />
compounds for various wastes, including asbestos.<br />
J.R. Cousin Consultants innovative design addressed<br />
challenges and complexities posed by porous sandy soils with<br />
a geomembrane liner and leachate collection and storage<br />
system, thus protecting the environment by preventing<br />
contamination.<br />
page 40 | Consulting Engineers of Manitoba Awards of Excellence<br />
Click Here to return to Table of Contents