88<br />

air pollution problems of poor visibility, mist and fog formation and health effects in<br />

the <strong>Eloor</strong> Edayar industrial area.<br />

14. The company has obtained Board’s consent under the Water Act for discharging<br />

12000m 3 /day effluent through outlet no.A. into Periyar River, 5000m3/day effluent<br />

through outlet E into Kuzhikandom thodu, and 4800 m3/day through outlet no: 1into<br />

Edumula branch of Periyar River.<br />

15. The hazardous wastes generated are spent catalyst, sulphur muck, spent lubricating oil<br />

and system oil, and sludge from effluent treatment plants. Of these spent catalyst such<br />

as zinc and nickel are disposed by sale to authorized dealer and spent vanadium<br />

catalyst as hazardous waste in disposal site. Sulphur muck is stored for disposal in<br />

approved disposal area. Effluent Treatment Plant sludge and filter cakes of phospho<br />

gypsum from gupsum filters are stored in intermediate storage for final disposal in<br />

LPDE lined gypsum yard. As per the Environmental statement furnished by the<br />

company for 2003, the quantity of wastes handled were<br />

sulphur muck-1158t/year<br />

spent catalyst-65t/year<br />

waste oil -17t/year<br />

ETP sludge -2125.62t/year.<br />

16. Low chromate treatment system is adopted for treating cooling water. It is informed<br />

that the company have programme for changing cooling tower treatment system from<br />

low chromate to non-chromate system in Ammonium Sulphate plant.<br />

17. Raw material Sulphur spilled over during material handling near the unloading area is<br />

reaching the river along with surface run off. The company have already taken some<br />

steps for containing the spillage of sulphur particles escaping through the drain.<br />

18. Effluent samples were collected from various plants ,effluent treatment plant and<br />

outlets for analysis.<br />

19. The company authority informed that they have proposals for improving the quality<br />

of effluent and elimination of storm water contamination.<br />

Recommendation :<br />

a. Proposed to modify the effluent treatment during 2005 in a phased manner.<br />

b. Scheme for diversion of vapour condensate from new ammonium sulphate<br />

plant to phosphoric acid plant by 2006. But there is no production of<br />

phosphoric acid.<br />

c. Scheme for diverting storm water from pollution control plant area.<br />

d. Scheme for elimination of E drain, to be commissioned by March 2006.<br />

1. Effluent treatment plant is to be augmented incorporating measures for reducing<br />

ammoniacal nitrogen content and effective control over the addition of treatment<br />

chemicals, sludge removal, dewatering, and disposal.<br />

2. Delay pond shall be provided in all storm water drains with monitoring facility.<br />

3. Steps shall be taken for reducing the water consumption, effluent generation and<br />

achieving zero effluent discharge system.<br />

4. Adequate steps shall be taken to prevent the escape of gypsum through storm water<br />

drains.<br />

5. Oil traps in storm water drains are to be revamped and made functional.<br />

6. Adequate steps for effective control of S02 emission through Sulphuric acid plant<br />

stacks shall be taken.