Astound Group RFP | 07.22.2011 - IFES
Astound Group RFP | 07.22.2011 - IFES
Astound Group RFP | 07.22.2011 - IFES
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
FEATURED PROJECT 2 | AGO PERMANENT INSTALLATION<br />
• ASTOUND worked with a top architectural<br />
firm to fabricate and install this creative<br />
piece that will be seen by thousands of<br />
visitors.<br />
• Uniquely combining industrial technology,<br />
modern art and architecture, it’s<br />
composition is timeless and dynamic.<br />
• ASTOUND created an artistic feature that<br />
will remain a permanent structure within<br />
the Frank Gehry designed AGO.<br />
• The curved configuration of stainless steel<br />
combines structural and mechanical<br />
engineering with detailed design and<br />
fabrication.<br />
16 ASTOUND COMPANY OVERVIEW<br />
2011 ASTOUND. All rights reserved. Not to be reproduced or released in any form without the prior written authorization of ASTOUND.