03.11.2014 Views

Astound Group RFP | 07.22.2011 - IFES

Astound Group RFP | 07.22.2011 - IFES

Astound Group RFP | 07.22.2011 - IFES

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FEATURED PROJECT 2 | AGO PERMANENT INSTALLATION<br />

• ASTOUND worked with a top architectural<br />

firm to fabricate and install this creative<br />

piece that will be seen by thousands of<br />

visitors.<br />

• Uniquely combining industrial technology,<br />

modern art and architecture, it’s<br />

composition is timeless and dynamic.<br />

• ASTOUND created an artistic feature that<br />

will remain a permanent structure within<br />

the Frank Gehry designed AGO.<br />

• The curved configuration of stainless steel<br />

combines structural and mechanical<br />

engineering with detailed design and<br />

fabrication.<br />

16 ASTOUND COMPANY OVERVIEW<br />

2011 ASTOUND. All rights reserved. Not to be reproduced or released in any form without the prior written authorization of ASTOUND.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!