03.11.2014 Views

Weekly Board Packet 11-30-07 - RTD

Weekly Board Packet 11-30-07 - RTD

Weekly Board Packet 11-30-07 - RTD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SAKS<br />

Transit Oriented Deve opment<br />

i Status Report 20<strong>07</strong><br />

Be view Station<br />

In January 2008 vertical construction is expected to begin in earnest at Belleview Station<br />

Phase 1<br />

of the project will include 250 luxury apartments in two 45 story buildings to be<br />

built by the Hanover Co 120 000 square feet of speculative office space to be built by<br />

Trammell Crow Co and 120 000 square<br />

feet of retail and a hotel to be built by Continuum<br />

Partners Front Range Land and Development Co a partnership between the landowner the<br />

Bansbach family and master developer Continuum Partners is planning<br />

a total of2 mil<br />

lion square feet of office space 250 000 square feet of retail 1 hotel and 2000 residential<br />

units on the entire 50 acre site for a total value of 51 5 billion The first phase of the project<br />

will be built on the northeast corner of Niagara Street and Belleview Avenue<br />

Fairfield Residential has broken ground on three rental projects near the station The 570<br />

million DTC III apartment complex will have 397 rental units on the east side of Monaco<br />

Street near Tufts Avenue DTC IV East and DTC IV West are both under construction north<br />

of Union Avenue on both sides on Monaco Street The 551 million DTC IV West will have<br />

270 apartments while the 551 million DTC IV East will have 240 All three Fairfield Resi<br />

dential projects are expected to be complete in 2008<br />

RE MAX in 20<strong>07</strong> completed their new corporate headquarters at Belleview Avenue and Syra<br />

cuse Street in early 20<strong>07</strong> The 550 million250 000 square foot office building<br />

21 000 square feet of retail<br />

also includes<br />

Orchard Station<br />

Construction continues on The Landmark Everest Development Company s5160 million<br />

mixed use development located north of the Orchard Station see Exhibit54 This 15 acre<br />

project will include 251 condos and 168 000 square<br />

feet of retail in two residential towers<br />

of 1 1 and 12 stories each While this phase is expected to be completed in 2008 Ever<br />

est has announced a second phase called the Brownstones at Landmark consisting<br />

townhomes and 10 single family homes<br />

of 160<br />

Exhibit 54 The Landmark<br />

Construction is moving along at The<br />

Landmark a S 160 million mixed use<br />

development with 251 condos and<br />

168 000 square feet of retail<br />

Draft 1 54 December 20<strong>07</strong><br />

Rev 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!