20 years of MHP in Indonesia and its future outlook
20 years of MHP in Indonesia and its future outlook
20 years of MHP in Indonesia and its future outlook
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Flashback zero to micro, from scratch & scrap<br />
• 22 October 1995, rent a house <strong>in</strong> Cim<strong>in</strong>di AK-4<br />
• D<strong>in</strong><strong>in</strong>g room & garage as electrical workshop,<br />
while family room as small <strong>of</strong>fice<br />
• Turb<strong>in</strong>e production <strong>in</strong>ternal- sub contract<br />
• 1999, <strong>in</strong>vest mechanical workshop <strong>in</strong> LIK B-30<br />
• 1999-<strong>20</strong>04, jo<strong>in</strong>t facility for mach<strong>in</strong><strong>in</strong>g & OS<br />
• <strong>20</strong>04-<strong>20</strong>08, <strong>in</strong>vest for mach<strong>in</strong>e, no more<br />
outsourc<strong>in</strong>g (OS)<br />
• <strong>20</strong>04, <strong>in</strong>vest AK-4 as SOHO<br />
• <strong>20</strong>07, <strong>in</strong>vest backyard <strong>of</strong> AK-4 as warehouse<br />
• <strong>20</strong>08, <strong>in</strong>vest another workshop <strong>in</strong> LIK B-78<br />
• <strong>20</strong>08, <strong>in</strong>vest AK-3 for extended <strong>of</strong>fice<br />
• <strong>20</strong>09, <strong>in</strong>vest backyard <strong>of</strong> AK-3 as Renewable<br />
Energy Gallery, Test Rig <strong>and</strong> warehouse<br />
• <strong>20</strong>10, <strong>in</strong>vest AK-2 special for <strong>of</strong>fice