20 years of MHP in Indonesia and its future outlook
20 years of MHP in Indonesia and its future outlook
20 years of MHP in Indonesia and its future outlook
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>20</strong> <strong>years</strong> <strong>of</strong> <strong>MHP</strong> <strong>in</strong> <strong>Indonesia</strong> <strong>and</strong> <strong>its</strong> <strong>future</strong> <strong>outlook</strong><br />
<strong>in</strong> the perspective <strong>of</strong> turb<strong>in</strong>e manufacturer<br />
GTZ-gate 1991 to GIZ <strong>MHP</strong>P 2 <strong>20</strong>11<br />
Jakarta , October 26 <strong>20</strong>11<br />
Ir. Kusetiadi Raharjo<br />
Director-Senior Hydropower<br />
Eng<strong>in</strong>eer
MICROHYDRO – BRIEF DEVELOPMENT IN INDONESIA<br />
• Tea Estate <strong>and</strong> Java Isl<strong>and</strong> , 1885 – 1925, more than 400 un<strong>its</strong> micro-m<strong>in</strong>i hydro<br />
built <strong>in</strong> <strong>Indonesia</strong>, all <strong>of</strong> the equipments imported from Europe<br />
• IKIP Padang, R.M. Enoch , 1980, vocational teacher<br />
• WRI, Irian Jaya, M. Johnson, 1985, Missionary<br />
• FAKT, YTDS, Toraja <strong>and</strong> North Sumatra, 1987, Missionary<br />
• GTZ-gate Yayasan M<strong>and</strong>iri, 1991-1994, Technology Cooperation<br />
• Directorate <strong>of</strong> Electricity <strong>and</strong> Energy Development, 1991, Government<br />
• Heksa (steel structure), 1992, Manufacturer, Private Company<br />
• Kramatraya Sejahtera, 1993, Manufacturer, Private Company<br />
• HeksaHydro, 1995, EPC <strong>and</strong> Manufacturer, Private Company<br />
• Yayasan IBEKA, 1995, EPC <strong>and</strong> Developer, NGO<br />
• GTZ-<strong>MHP</strong>P – <strong>MHP</strong>P 2 , 1998 , M<strong>in</strong>i Hydro Power Project for Capacity Development<br />
• Cihanjuang Inti Teknik, <strong>20</strong>01, Manufacturer, Private Company<br />
• <strong>20</strong>01 – Present , more than <strong>20</strong> microhydro manufacturers established<br />
• <strong>20</strong>01 – Present , 5 m<strong>in</strong>istries have microhydro program ( ESDM, PDT, Kesra, PU, Depkop)<br />
• <strong>20</strong>01 – Present, more than 30 regencies have microhydro program<br />
• <strong>20</strong>01 – Present, many estates <strong>and</strong> developers are <strong>in</strong>terested <strong>in</strong> micro-m<strong>in</strong>i hydro
Flashback young eng<strong>in</strong>eer with vision<br />
• 1992 - 1994, employee <strong>of</strong> GTZ-gate<br />
Yayasan M<strong>and</strong>iri<br />
• 1992, <strong>MHP</strong>G Tra<strong>in</strong><strong>in</strong>g course, Swiss<br />
• Field eng<strong>in</strong>eer: site survey, supervisi turb<strong>in</strong>,<br />
controller,erection&commission<strong>in</strong>g<br />
• 1994, Study ELC, Sri Lanka<br />
• 1995, GTZ-gate term<strong>in</strong>ated, jobless <strong>and</strong><br />
jo<strong>in</strong>t with PT. Heksa <strong>and</strong> run HeksaHydro<br />
division<br />
• Self employee, assisted by my wife <strong>and</strong> 1<br />
technician<br />
• Start up capital: h<strong>and</strong>l<strong>in</strong>g over equipment<br />
from GTZ, rest payment <strong>of</strong> zaire project
Flashback zero to micro, from scratch & scrap<br />
• 22 October 1995, rent a house <strong>in</strong> Cim<strong>in</strong>di AK-4<br />
• D<strong>in</strong><strong>in</strong>g room & garage as electrical workshop,<br />
while family room as small <strong>of</strong>fice<br />
• Turb<strong>in</strong>e production <strong>in</strong>ternal- sub contract<br />
• 1999, <strong>in</strong>vest mechanical workshop <strong>in</strong> LIK B-30<br />
• 1999-<strong>20</strong>04, jo<strong>in</strong>t facility for mach<strong>in</strong><strong>in</strong>g & OS<br />
• <strong>20</strong>04-<strong>20</strong>08, <strong>in</strong>vest for mach<strong>in</strong>e, no more<br />
outsourc<strong>in</strong>g (OS)<br />
• <strong>20</strong>04, <strong>in</strong>vest AK-4 as SOHO<br />
• <strong>20</strong>07, <strong>in</strong>vest backyard <strong>of</strong> AK-4 as warehouse<br />
• <strong>20</strong>08, <strong>in</strong>vest another workshop <strong>in</strong> LIK B-78<br />
• <strong>20</strong>08, <strong>in</strong>vest AK-3 for extended <strong>of</strong>fice<br />
• <strong>20</strong>09, <strong>in</strong>vest backyard <strong>of</strong> AK-3 as Renewable<br />
Energy Gallery, Test Rig <strong>and</strong> warehouse<br />
• <strong>20</strong>10, <strong>in</strong>vest AK-2 special for <strong>of</strong>fice
HEKSAHYDRO – BRIEF PRODUCTIONS 1992-<strong>20</strong>10<br />
Pioneer Periods 1992 – <strong>20</strong>00, total productions 42 un<strong>its</strong>, per year 4 – 6 un<strong>its</strong>, <strong>in</strong>frastructures<br />
(400 m2 <strong>of</strong>fice-workshop, 15 employees, 11 kVA power, 1 lathe mach<strong>in</strong>e, 1 mill<strong>in</strong>g mach<strong>in</strong>e, 2<br />
weld<strong>in</strong>g mach<strong>in</strong>e, 30% mach<strong>in</strong><strong>in</strong>g works were outsourc<strong>in</strong>g )<br />
Survival Periods <strong>20</strong>01 – <strong>20</strong>05, total productions 27 un<strong>its</strong>, per year 4 – 6 un<strong>its</strong>,<strong>in</strong>frastructures<br />
(400 m2 <strong>of</strong>fice-workshop, 15 employees, 11 kVA power, 1 lathe mach<strong>in</strong>e, 1 mill<strong>in</strong>g mach<strong>in</strong>e, 2<br />
weld<strong>in</strong>g mach<strong>in</strong>e, 30% mach<strong>in</strong><strong>in</strong>g works were outsourc<strong>in</strong>g )<br />
Boom<strong>in</strong>g Period <strong>20</strong>06- <strong>20</strong>10, total productions 185 un<strong>its</strong>, per year 30-50 un<strong>its</strong>, per month 2<br />
– 5 unit, <strong>in</strong>frastructures (3800 m2 <strong>of</strong>fice-workshop, 40 employees, 130 kVA power, 7 lathe<br />
mach<strong>in</strong>e,7 mill<strong>in</strong>g mach<strong>in</strong>e, 15 weld<strong>in</strong>g mach<strong>in</strong>e, 5 shapp<strong>in</strong>g mach<strong>in</strong>e, 3 slott<strong>in</strong>g mach<strong>in</strong>e, 2<br />
s<strong>and</strong> blast<strong>in</strong>g mach<strong>in</strong>e, no mach<strong>in</strong><strong>in</strong>g works were outsourc<strong>in</strong>g )<br />
Total turb<strong>in</strong> yang sudah diproduksi s/d <strong>20</strong>10 = 254 unit (domestic = 223 unit – 88% , export<br />
= 31 unit – 12%)<br />
Costumer domestic: Dirjen LPE, D<strong>in</strong>as Pertambangan&Energi Prop<strong>in</strong>si-Kabupaten, LSM dan<br />
Perorangan, Perkebunan dan Pertambangan<br />
Costumer export AFRIKA: Ug<strong>and</strong>a, Zaire, Tanzania, Kamerun, Kongo, Madagaskar, Ethiopia,<br />
Nigeria, potensi yang belum tergarap (Kenya, Ecowest/Uni Afrika Barat) ASIA: Malaysia,<br />
Phillip<strong>in</strong>a, Thail<strong>and</strong>, Laos, Nepal, potensi yang belum tergarap (Myanmar, Bhutan), EROPA:<br />
Wales, potensi yang belum tergarap/menunggu kontrak (Small farm<strong>in</strong>g di Irl<strong>and</strong>ia-Skotl<strong>and</strong>ia,<br />
Small IPP di Italy dan Swiss)
HEKSAHYDRO – DOMECTIC & ASEAN PROJECT
HEKSAHYDRO – EXPORT TO AFRICA
GTZ-gate to giz - <strong>MHP</strong>P 2<br />
• Not more than 3 workshop worked for micro hydro<br />
• Not more than 5 eng<strong>in</strong>eers worked for micro hydro<br />
• There was no university <strong>in</strong> <strong>Indonesia</strong> <strong>in</strong>terested <strong>in</strong> micro hydro<br />
• Only ESDM-DJLPE had micro hydro program<br />
• There was no private company <strong>in</strong>terested to <strong>in</strong>vest <strong>in</strong> micro hydro<br />
(GTZ-gate period 1991 – 1994)<br />
• More than <strong>20</strong> workshop work for micro-m<strong>in</strong>i hydro<br />
• More than 100 eng<strong>in</strong>eers work for micro-m<strong>in</strong>i hydro<br />
• Many universities are do<strong>in</strong>g research <strong>and</strong> development <strong>in</strong> micro-m<strong>in</strong>i hydro<br />
• 5 M<strong>in</strong>istries <strong>and</strong> more than 30 regencies have micro hydro program<br />
• Many private companies <strong>in</strong>terested to <strong>in</strong>vest <strong>in</strong> m<strong>in</strong>i hydro<br />
(GTZ-<strong>MHP</strong>P , giz <strong>MHP</strong>P 2 period 1998 – Present)
TECHNOLOGY CYCLE<br />
• Tea Estate Neglasari, West Java, 41 kW<br />
• Turb<strong>in</strong>e Made <strong>in</strong> United K<strong>in</strong>gdom, 1929<br />
• Bov<strong>in</strong>g & Co Ltd. London<br />
• Alwen Water Treatment Work,<br />
Wales, United K<strong>in</strong>gdom, 25 kW<br />
• Turb<strong>in</strong> Made <strong>in</strong> <strong>Indonesia</strong>, <strong>20</strong>06<br />
• Heksahydro, Cimahi-West Java<br />
(Europe <strong>in</strong>termediate technology which<br />
need skill labor should be relocated <strong>in</strong> third<br />
country like <strong>Indonesia</strong> )
The First T-7 (<strong>in</strong> B<strong>and</strong>ung)<br />
Curug Agung, 1992<br />
3 un<strong>its</strong> only , term<strong>in</strong>ated <strong>in</strong> 1993<br />
The First T-12 (<strong>in</strong> B<strong>and</strong>ung)<br />
Cibitung, 1993<br />
around 50 un<strong>its</strong>, term<strong>in</strong>ated <strong>in</strong> 1998<br />
The First T-14 D300 (<strong>in</strong> the World)<br />
Sedau, Lombok, 1998<br />
Now we are mak<strong>in</strong>g the 80 th to 90 th<br />
PROFILE progress step by step<br />
The First T-14 D300 100 kW<br />
Bili-Bili, 1999<br />
Followed by Dewata 1<strong>20</strong> kW (<strong>20</strong>02)<br />
The Fisrt T-14 D150<br />
Long Lawen, Sarawak, Malaysia, <strong>20</strong>01<br />
Now we are mak<strong>in</strong>g the 90 th to 110 th<br />
The First T-15 D500 (<strong>in</strong> The World)<br />
Melong, West Java, <strong>20</strong>05<br />
Now we are mak<strong>in</strong>g the 8 th
X-flow Turb<strong>in</strong>e T-14 D150<br />
head: 3 – 40 meter<br />
power: 3 – 30 kW<br />
X-flow Turb<strong>in</strong>e T-14 D225<br />
head: 3 – 100 meter<br />
power: 5 – 100 kW<br />
X-flow Turb<strong>in</strong>e T-14 D300<br />
head: 3 – 100 meter<br />
power: 10 – 150 kW<br />
PROFILE product - turb<strong>in</strong>e<br />
X-flow Turb<strong>in</strong>e T-15 D500<br />
head: 5 – 100 meter<br />
power: 50 – 700 kW<br />
Propeller S-Turb<strong>in</strong>e<br />
head: 2 – 13 meter<br />
power: 10 - 150 kW<br />
Pelton Turb<strong>in</strong>e<br />
head: 70 – 300 meter<br />
power: 50 – 1000 kW
<strong>MHP</strong>G-SKAT-GTZ gate<br />
hydropower tra<strong>in</strong><strong>in</strong>g course<br />
Swiss, 1992, Kus as tra<strong>in</strong>ee<br />
Universitat Stuttgart , entec ag<br />
laboratory test T-14<br />
Germany, 1998<br />
Green Empowerment<br />
Asian microhydro tra<strong>in</strong><strong>in</strong>g course<br />
B<strong>and</strong>ung, <strong>20</strong>03, Kus as tra<strong>in</strong>er<br />
PROFILE technology <strong>and</strong> partnership<br />
GTZ-<strong>MHP</strong>P<br />
Nigerian microhydro tra<strong>in</strong><strong>in</strong>g course<br />
B<strong>and</strong>ung, <strong>20</strong>11, Kus as tra<strong>in</strong>er<br />
TEST RIG HEKSAHYDRO<br />
Test <strong>and</strong> modell<strong>in</strong>g turb<strong>in</strong>ee<br />
Cim<strong>in</strong>di <strong>20</strong>09<br />
GALLERY HEKSAHYDRO<br />
Show room & tra<strong>in</strong><strong>in</strong>g center<br />
Cim<strong>in</strong>di, <strong>20</strong>011
FUTURE OUTLOOK<br />
• So far s<strong>in</strong>ce 1992, I can grow <strong>and</strong> glow from micro hydro<br />
• GTZ-gate technology cooperation has given opportunity a marg<strong>in</strong>al eng<strong>in</strong>eer<br />
to be a hydro technopreneur<br />
• S<strong>in</strong>ce <strong>20</strong>01 , <strong>Indonesia</strong>n Energy Policy is conducive for micro hydro development<br />
• There is no ch<strong>in</strong>a competitor especially for cross-flow turb<strong>in</strong>e<br />
• Foreign market for cross-flow turb<strong>in</strong>e is still prospective especially for micro size<br />
• Hydropower eng<strong>in</strong>eer<strong>in</strong>g is still an emerg<strong>in</strong>g market <strong>in</strong> <strong>Indonesia</strong>, s<strong>in</strong>ce just<br />
7.54% are developed (Micro hydro = 28.31%)<br />
• More challenges for m<strong>in</strong>i hydro turb<strong>in</strong>e manufactur<strong>in</strong>g, especially from ch<strong>in</strong>a<br />
• M<strong>in</strong>i hydro turb<strong>in</strong>e manufactur<strong>in</strong>g (francis, kaplan) will not grow <strong>in</strong> <strong>Indonesia</strong>,<br />
except there is a special protection or another technical & bus<strong>in</strong>ess-cooperation<br />
• Technical & bus<strong>in</strong>ess – cooperation: German-Indo (Voith-PT.Indo,<br />
WKV-PT.Indo) to compete with S<strong>in</strong>ohydro (Ch<strong>in</strong>a manufacturer)<br />
• We may learn from Andritz Hydro (Austria-India)
”We may survive without hydropower, but<br />
Can we live without water ??”<br />
THANK YOU -Terima Kasih