For this Master Plan Update, the consulting team assumed<br />

that the property parcels included within the current Drew<br />

Park Land Acquisition Program being implemented by the<br />

Aviation Authority would continue until the completion of the<br />

Program, as planned, is reached.<br />

The master planning analyses concluded that there<br />

would be a need to purchase property north of<br />

Hillsborough Avenue, as it becomes available, to support<br />

the <strong>Airport</strong>'s long-term development. Specifically,<br />

additional property will be required to support the<br />

approaches and runway protection zones for the<br />

construction of Runway 17-35 and the extension of<br />

Runway 18L, and the expansion of the north terminal<br />

facilities. As the North Terminal grows from 27 gates to 50<br />

gates (i.e., the four-airside scheme), properties north of<br />

Hillsborough will likely be needed to support surface<br />

economy and overflow public parking demand, and<br />

surface area for rental car service operations and storage<br />

(assuming a consolidated rental car facility is not<br />

developed prior to that point in time). The acquisition of<br />

that property (north of Hillsborough) will also protect the<br />

<strong>Airport</strong>'s ability to grow beyond 50 north terminal gates to<br />

support the airfield's processing capacity.