For this Master Plan Update, the consulting team assumed<br />
that the property parcels included within the current Drew<br />
Park Land Acquisition Program being implemented by the<br />
Aviation Authority would continue until the completion of the<br />
Program, as planned, is reached.<br />
The master planning analyses concluded that there<br />
would be a need to purchase property north of<br />
Hillsborough Avenue, as it becomes available, to support<br />
the <strong>Airport</strong>'s long-term development. Specifically,<br />
additional property will be required to support the<br />
approaches and runway protection zones for the<br />
construction of Runway 17-35 and the extension of<br />
Runway 18L, and the expansion of the north terminal<br />
facilities. As the North Terminal grows from 27 gates to 50<br />
gates (i.e., the four-airside scheme), properties north of<br />
Hillsborough will likely be needed to support surface<br />
economy and overflow public parking demand, and<br />
surface area for rental car service operations and storage<br />
(assuming a consolidated rental car facility is not<br />
developed prior to that point in time). The acquisition of<br />
that property (north of Hillsborough) will also protect the<br />
<strong>Airport</strong>'s ability to grow beyond 50 north terminal gates to<br />
support the airfield's processing capacity.