OTCO Class III & IV Workshop<br />

August 18, 2011<br />

<strong>Simple</strong> <strong>Ways</strong> to <strong>Enhance</strong><br />

<strong>Your</strong> WTP‟s CT Capacity<br />

Tim Wolfe<br />

MWH Americas<br />

<strong>Water</strong> Practice Leader


Items to be Discussed <strong>To</strong>day . . .<br />

• CT in Ohio EPA‟s Approved Capacity Document<br />

• Optimizing CT Credit in <strong>Your</strong> Clearwells<br />

• Lima‟s CT Credit <strong>Enhance</strong>ments<br />

• Avon Lake‟s Seasonal CT Credits


Clarified Need to Match (Normalize) Clearwell Component Capacity (i.e.,<br />

CT Capacity) with Other Components of the <strong>Water</strong> <strong>Treatment</strong> Plant (WTP)<br />

OHIO EPA‟s APPROVED<br />

CAPACITY DOCUMENT


Ohio EPA Plan-approval Letters<br />

Now State the:<br />

• Approved Capacity of the “<strong>Water</strong>-supply Source” is XX<br />

MGD – and the Limiting component on which the approved<br />

capacity is based,<br />

• Approved Capacity of the “WTP” is YY MGD – and the<br />

Limiting component on which the approved capacity is based,<br />

and<br />

• Approved Capacity of the “<strong>Water</strong> System” is XX or YY<br />

MGD – i.e., the smaller of the approved capacities for the<br />

<strong>Water</strong>-supply Source and WTP<br />

4


“Components” of<br />

<strong>Water</strong> <strong>Treatment</strong> Plants (WTPs)<br />

• A unit-treatment process (e.g., pre-sedimentation,<br />

rapid-mix, flocculation, sedimentation, filtration,<br />

stabilization, etc.);<br />

• Essential chemical storage-and-feed facilities;<br />

• Disinfection (e.g., chorine, chloramines, chlorine<br />

dioxide, ozone or UV generation and/or contacting<br />

facilities); and<br />

• WTP pumping (e.g., intermediate pumping<br />

between components within the WTP, finishedwater<br />

pumping to convey finished water to the<br />

distribution system, etc.).<br />

5


“Production” is the rate at which<br />

finished water leaves the WTP<br />

• “Customer water demands” are:<br />

– Commercial and Industrial (Large users)<br />

– Residential<br />

– Public use (Billed or Unbilled)<br />

• Most of the difference between WTP Production<br />

and Customer Demands is contributed to<br />

or supplied by distribution storage<br />

6


“Production” . . . (cont)<br />

• “Other items” that cause a difference between WTP<br />

Production and Customer Demands are:<br />

– Accounted-for and Unaccounted-for Distribution-system<br />

<strong>Water</strong> losses<br />

– Inaccurate meters<br />

– Etc.<br />

7


Each “Part” of a <strong>Water</strong> System Plays a<br />

Role in Supplying Customer Demands<br />

Source<br />

Avg.-day, or<br />

Max.-day<br />

Surface<br />

<strong>Water</strong><br />

Lakes<br />

Reservoirs<br />

Rivers<br />

Ground<br />

<strong>Water</strong><br />

Aquifers<br />

WTP<br />

Max.-day<br />

<strong>Water</strong><br />

<strong>Treatment</strong><br />

Disinfection &<br />

Finished-water<br />

Pumping<br />

Line between Production<br />

and Demands can be Blurry<br />

Instantaneous-peak,<br />

Fire-flow,<br />

Pk.-hour Demands,<br />

Etc.<br />

Comm/Ind<br />

Residential<br />

Public use<br />

Losses<br />

Inaccurate<br />

Meters<br />

Distribution System<br />

8


Distribution Storage is the Buffer<br />

Between Production and Demands<br />

Avg.-day, or<br />

Max.-day<br />

Surface<br />

<strong>Water</strong><br />

Lakes<br />

Reservoirs<br />

Rivers<br />

Ground<br />

<strong>Water</strong><br />

Aquifers<br />

WTP<br />

Production<br />

Max.-day<br />

<strong>Water</strong><br />

<strong>Treatment</strong><br />

Disinfection &<br />

Finished-water<br />

Pumping<br />

Pk<br />

hr<br />

Customer<br />

Demand, etc.<br />

Instantaneous-peak,<br />

Fire-flow Demands<br />

Storage<br />

Comm/Ind<br />

Residential<br />

Public use<br />

Losses<br />

Inaccurate<br />

Meters<br />

Distribution System<br />

9


Typical Ratios of Customer Demand<br />

to WTP Production<br />

• Avg.-day Demand<br />

Avg.-day Production = 1<br />

• Max.-day Demand<br />

Max.-day Production = approx. 1<br />

• Pk.-hour Demand<br />

Pk.-hour Production = > 1<br />

Most of the difference between Demand and Production is<br />

contributed to or supplied by distribution-system storage<br />

10


In Essence:<br />

Distribution-system Storage . . .<br />

. . . Provides the difference between:<br />

• The large, customer demands (e.g., Pk.-hour,<br />

Instantaneous-peak and Fire-flow), etc.<br />

AND<br />

• The smaller, more constant, rate at which water is<br />

produced on any given day at the WTP (i.e.,<br />

Production) to supply these various Customer<br />

Min.-day, Avg.-day, or Max.-day demands<br />

11


Storage Buffers Up- & Down-stream<br />

Flow Rates between Components<br />

Avg.-day<br />

Max.-day<br />

Max.-day<br />

Pk.<br />

hour<br />

<strong>Water</strong><br />

<strong>Treatment</strong><br />

Source-water<br />

Storage<br />

Clearwell<br />

Storage<br />

Finished-water<br />

Pumping<br />

“Source-water storage” allows upstream <strong>Water</strong>-supply source components<br />

to be designed to meet Avg.-day production (not Max.-day rates).<br />

Likewise, “Clearwell storage” allows upstream WTP components<br />

to be designed to meet Max.-day production (not Pk.-hour rates).<br />

12


WTP Production Projections<br />

for a Growing <strong>Water</strong> System<br />

Finished-water Pumping<br />

Finished<br />

<strong>Water</strong><br />

Production<br />

Projections<br />

( MGD )<br />

15.0<br />

13.5<br />

10.0<br />

7.5<br />

Pk.-hour Production<br />

Pk.-hour of <strong>Treatment</strong><br />

CT Criteria for Clearwells<br />

Max.-day Production<br />

Most WTP Components<br />

Avg.-day Production<br />

Most Source Components<br />

0<br />

<strong>To</strong>day<br />

Design<br />

Year<br />

13


Productions are Normalized around Max.-day<br />

Production to Calculate Equiv. Max.-day Cap.<br />

Finished<br />

<strong>Water</strong><br />

Production<br />

Projections<br />

( MGD )<br />

15.0<br />

13.5<br />

10.0<br />

7.5<br />

Pk.-hour Production<br />

Pk.-hour of <strong>Treatment</strong><br />

Max.-day Production<br />

Avg.-day Production<br />

0<br />

<strong>To</strong>day<br />

Design<br />

Year<br />

14


For <strong>Water</strong>-supply Components that<br />

Supply Avg.-day WTP Production . . .<br />

. . . The Component Capacity is converted to an<br />

“Equivalent Max.-day Capacity” by:<br />

„Multiplying‟ the Component Capacity by the ratio of<br />

Max.-day to Avg.-day production:<br />

E.g., an aquifer’s safe yield (i.e., component capacity) is 5.0<br />

MGD, and the water system’s ratio of Max.-day to Avg.-day<br />

production is 1.25:<br />

5.0 MGD Avg.-day 1.25 Max.-day<br />

------------------------- X ------------------- = 6.25 MGD Equiv. Max.-day<br />

1 Avg.-day<br />

15


For WTP Components that Supply<br />

Pk.-hr WTP Production . . .<br />

. . . The Component Capacity is converted to an<br />

“Equivalent Max.-day Capacity” by:<br />

„Dividing‟ the Component Capacity by the ratio of<br />

Pk.-hr to Max.-day production:<br />

E.g., the Component (CT) capacity for the Clearwell<br />

is 12.5 MGD for a 10-MGD WTP, and the water<br />

system’s ratio of Pk.-hr “production” to Max.-day<br />

production is 1.5:<br />

12.5 MGD Pk.- hr X Max.-day = 8.3 Equiv. Max.-day<br />

1 1.5 Pk.-hr<br />

16


The Clearwells for this 10-MGD WTP are the<br />

Limiting Component in Year X<br />

15.0<br />

Pk.-hour Production<br />

Finished<br />

<strong>Water</strong><br />

Production<br />

Projections<br />

( MGD )<br />

12.5<br />

10.0<br />

8.3<br />

7.5<br />

Max.-day Production<br />

Avg.-day Production<br />

0<br />

<strong>To</strong>day<br />

Year<br />

X<br />

Design<br />

Year<br />

17


YES – a Clearwell (i.e., CT capacity) can be a<br />

WTP‟s Limiting Component<br />

First thing this water system can do to increase Component<br />

capacity of the Clearwell is to use Pk.-hr of <strong>Treatment</strong> instead<br />

of Pk.-hour Production for daily CT calculations<br />

(i.e., Production generally > <strong>Treatment</strong> during Pk.-hr conditions,<br />

and <strong>Water</strong> level in Clearwell is typically dropping)<br />

Pk.-hr of<br />

<strong>Treatment</strong><br />

Pk.-hr<br />

Production<br />

CT = residual disinfectant Concentration x effective contact Time<br />

T is based on pk.-hr of treatment and corresponding clearwell level<br />

18


Using Pk.-hr treatment Increases<br />

Equiv. Max.-day from 8.3 to 9.3 MGD<br />

I.e., the CT capacity of the Clearwell is still 12.5 MGD,<br />

but the water system’s ratio of Pk.-hr “treatment” to<br />

Max.-day production is 1.35:<br />

13.5 MGD Pk.- hr Trtmnt = 1.35<br />

10.0 MGD Max.-day<br />

12.5 MGD Pk.- hr X Max.-day = 9.3 Equiv. Max.-day<br />

1 1.35 Pk.-hr<br />

19


And . . . The Clearwell CT Capacity<br />

now becomes Limiting in Year Y<br />

Finished<br />

<strong>Water</strong><br />

Production<br />

Projections<br />

( MGD )<br />

15.0<br />

13.5<br />

12.5<br />

10.0<br />

9.3<br />

7.5<br />

Pk.-hour Production<br />

Pk.-hour <strong>Treatment</strong><br />

Max.-day Production<br />

Avg.-day Production<br />

0<br />

<strong>To</strong>day<br />

Year<br />

Y<br />

Design<br />

Year<br />

20


<strong>To</strong> Increase the CT Capacity, the<br />

<strong>Water</strong> System could also . . .<br />

• Increase the “C” of CT by increasing the free<br />

chlorine residual (i.e., CT values req’d are higher,<br />

but DBPs don’t form as readily in the winter)<br />

• Increase the “T” of CT by maintaining a higher<br />

water level in the Clearwells (e.g., install VFDs on<br />

finished-water pumps)<br />

• Increase the “T” of CT by increasing the effective<br />

volume factor, EVF, of the Clearwells (e.g., install<br />

baffles, etc.)<br />

21


Additional Baffles Increased the<br />

EVF from 0.4 to 0.6 and CT Cap.<br />

I.e., the Equiv. Max.-day capacity of the Clearwell is<br />

9.3 MGD, but the EVF is now 0.6 instead of 0.4:<br />

9.3 MGD Equiv. Max.-day X 0.6 = 14.0 Equiv. Max.-day<br />

1 0.4<br />

Now – the Clearwell component capacity no longer limits the<br />

Approved Capacity of this 10-MGD WTP<br />

22


<strong>To</strong> Increase the Approved Capacity,<br />

the <strong>Water</strong> System could also . . .<br />

• Decrease the “Ratio” of Pk.-hour of treatment to<br />

Max.-day water production (e.g., install VFDs on<br />

both source-water and finished-water pumps),<br />

• Decrease the “Ratio” of Pk.-hour water production<br />

to Max.-day water production (e.g., construct<br />

additional distribution-system storage),<br />

• Request a “seasonal CT” approved capacity for<br />

the Clearwells (particularly if the Summer, Max.-<br />

day water production is significantly larger than the<br />

Winter, Max.-day water production)<br />

23


OPTIMIZING CT CREDIT IN<br />

YOUR CLEARWELLS


Effective Volume Factor (EVF)<br />

Increasing Effective Volume<br />

Factor (EVF) – Baffles<br />

0.8<br />

0.6<br />

0.4<br />

Available on the Ohio EPA Website<br />

0.2<br />

10:1 20:1 30:1 40:1<br />

Length to Width (L:W) Ratio


Typical Baffled Clearwell<br />

length of pass ( l ) = 10 W<br />

From<br />

the<br />

Filters<br />

Baffles<br />

Width of pass ( W ) = W<br />

<strong>To</strong>tal Length ( L ) = 3 ( l ) = 3 ( 10 W ) = 30 W<br />

F-w<br />

Pumps<br />

Side <strong>Water</strong> Depth ( SWD ) = 1.25 W<br />

From<br />

the<br />

Filters<br />

Baffles<br />

3 W<br />

Length to Width ( L : W ) Ratio = 30 : 1


Increasing EVF<br />

Flow-Through Inlet Wall<br />

8 to 10 %<br />

of the wall<br />

is openings<br />

for the influent<br />

to the clearwell<br />

to flow through


Inlet Wall Installed near Point of<br />

Clearwell Influent Flow<br />

length of pass ( l ) = 10 W<br />

Flow-Through Inlet Wall<br />

W<br />

<strong>To</strong>tal Length ( L ) = 3 ( l ) = 3 ( 10 W ) = 30 W<br />

Side <strong>Water</strong> Depth ( SWD ) = 1.25 W<br />

3 W<br />

Flow-Through Inlet Wall<br />

Length to Width ( L : W ) Ratio = 30 : 1


Increasing EVF - Turning Vanes<br />

length of pass ( l ) = 10 W<br />

W<br />

Turning Vanes<br />

<strong>To</strong>tal Length ( L ) = 3 ( 10 W ) = 30 W<br />

Side <strong>Water</strong> Depth ( SWD ) = 1.25 W<br />

Turning Vanes<br />

3 W<br />

Length to Width ( L : W ) Ratio = 30 : 1


Increasing EVF - Summary<br />

Bottom Line is to Increase EVF to a value as<br />

close to 1 as possible:<br />

By<br />

• Maximizing plug-flow regions<br />

And<br />

• Minimizing completely-mixed flow regions<br />

• Minimizing dead spaces


LIMA‟s CT CREDIT<br />

ENHANCEMENTS


Lima is Installing Post-filter GAC to Control<br />

T&O and as a DBP Buffer (i.e., to meet LRAA)<br />

SMALL CLEARWELL<br />

<strong>To</strong><br />

Distribution<br />

0-3 MGD<br />

LARGE<br />

CLEARWELL<br />

EVF = 0.2<br />

EVF = 0.375<br />

0-17 MGD<br />

From<br />

Filters<br />

OLD CLEARWELL<br />

Flow<br />

Control<br />

0-20 MGD New Baffles<br />

GAC<br />

0-40 MGD<br />

EVF = 0.3


Finished-<br />

<strong>Water</strong><br />

Pump Sta.<br />

Filters, and<br />

Clearwells<br />

Underneath<br />

New GAC<br />

Contactors<br />

Location<br />

Old<br />

Clearwell


Existing Clearwell System<br />

Presents Some Challenges<br />

<strong>To</strong> Lima‟s Distribution<br />

System<br />

Finished-water<br />

Pump Station<br />

Large<br />

Clearwell<br />

No. 2<br />

From the<br />

Dual-media<br />

Filters<br />

Small<br />

C.W. No. 1<br />

Old Clearwell No. 3<br />

has same influent &<br />

effluent pipe<br />

Old<br />

Clearwell<br />

No. 3<br />

High chlorine residuals required to meet winter-time CT values.


Lima‟s WTP has an Approved<br />

Capacity of 30 MGD<br />

Projected, Design-year Parameters:<br />

– Pk.-hour production = 40.0 MGD *<br />

– Max.-day production = 30.0 MGD<br />

– Avg.-day production= 22.5 MGD<br />

= 1.33<br />

= 1.33<br />

* For calculation of daily CT values, the Pk.-hour of<br />

treatment (i.e., clearwell influent) is assumed to be<br />

equal to Pk.-hour production (i.e., clearwell effluent, or<br />

the finished-water pumping rate)


Intermediate Pumping was Required @ Lima<br />

WTP to Convey Filter Effluent through GAC<br />

Two Clearwells No. 1 & 2 located beneath filters<br />

Ten (10)<br />

Dual-Media<br />

Filters<br />

Four (4) New, GAC Contactors<br />

(with 10 ft depth of GAC)<br />

New, 36-in. tie-in with two<br />

Clearwells beneath filters<br />

New, Intermediate Pump-station<br />

New, 36-in. tie-in<br />

With Old Clearwell No. 3


Intermediate Pumping Presented<br />

Opportunity to <strong>Enhance</strong> CT Cap.<br />

– New 36-in. pipeline from GAC to old clearwell No. 3:<br />

• eliminates potential T&O issues<br />

• allows clearwells No. 1 – 3 to be operated in series<br />

– New 36-in. pipeline from GAC to small clearwell No. 1:<br />

• allows clearwells No. 1 & 2 to be operated in parallel with old<br />

clearwell No. 3<br />

– Control valve with flow meter in small clearwell No. 1<br />

influent pipe:<br />

• allows clearwells to be isolated and cleaned in the summer


Finished-<br />

<strong>Water</strong><br />

Pump Sta.<br />

Filters, and<br />

Clearwells<br />

Underneath<br />

New GAC<br />

Contactors<br />

Location<br />

Old<br />

Clearwell<br />

New 36-in. dia.<br />

Connection to<br />

Old Clearwell


Benefit / Cost Ratio for these<br />

Additional Pipelines was Significant<br />

Finished-water<br />

Pump Station<br />

<strong>To</strong> Lima‟s<br />

Distribution<br />

System<br />

Large<br />

Clearwell<br />

No. 2<br />

Small<br />

C.W. No. 1<br />

New,<br />

36-in. Pipeline<br />

Old Clearwell<br />

No. 3<br />

From GAC


Baffling of Old CW No. 3 and Large CW No. 2<br />

Provided a True 30-MGD Approved Capacity<br />

– Baffling of old clearwell No. 3 increases effective<br />

volume factor (EVF) to 0.3 without a tracer study (i.e.,<br />

length-to-width [L:W] ratio = 10.5)<br />

– Baffling of large clearwell No. 2 increases EVF to 0.375<br />

without a tracer study (L:W ratio = 14.5)


Pipelines and Baffles Provide Several<br />

Advantages for CT Capacity @ Lima WTP<br />

Finished-water<br />

Pump Station<br />

<strong>To</strong> Lima‟s<br />

Distribution<br />

System<br />

From GAC<br />

Large<br />

Clearwell<br />

No. 2<br />

Small<br />

C.W. No. 1<br />

Recommended<br />

Baffles<br />

New,<br />

36-in. Pipeline<br />

Flow in<br />

only one<br />

direction<br />

Old Clearwell<br />

No. 3


Design-year Winter CT values can be met at<br />

a Cl 2 Residual of only 1.8 mg/L<br />

• CT CALCULATIONS<br />

– Worst-Case Conditions:<br />

• <strong>Water</strong> Temperature (C) = 4<br />

• Max pH Value > 9<br />

• Cl2 residual (mg/L) =1.8<br />

– Max CT Value Required – Winter (mg/L-min) = 63.3<br />

• CT values achieved at 40 MGD (Design-year,<br />

Pk.-hour production for Lima‟s 30-MGD WTP):<br />

– Clearwells in Series: 64.7 mg/L-min<br />

– Clearwells in Parallel: 63.3 mg/L-min


Clearwell Flow-path Changes<br />

Provide Lima Advantages:<br />

– Increase currently limited CT capacity of existing<br />

Clearwells (i.e., a cost-effective, side-benefit since<br />

intermediate pumping is required anyway for the postfilter,<br />

GAC adsorption units)<br />

– Eliminate dead-spaces in existing, Old Clearwell No. 3<br />

(i.e., GAC-treated water would now enter and exit Old<br />

Clearwell No. 3 at different points)<br />

– Allow a Clearwell to be taken out-of-service for<br />

maintenance during warm weather (i.e., Since CT<br />

values are easier to meet in warm weather, and<br />

Clearwells can now be operated in parallel)


AVON LAKE‟s SEASONAL CT<br />

CREDITS


Avon Lake Municipal Utilities Serves the<br />

City and Numerous Other Communities<br />

Avon<br />

Lake‟s<br />

WTP<br />

Avon Lake‟s<br />

Distribution<br />

System<br />

RLCWA‟s<br />

Extended<br />

Distribution<br />

System<br />

Served<br />

by Avon Lake


Avon Lake‟s WTP Serves a System with<br />

Growing Estimated Demands (Max.-day)<br />

Year<br />

City’s<br />

System<br />

Extended<br />

System<br />

<strong>To</strong>tal<br />

2000 5.0 26.6 31.6<br />

2005 5.1 31.7 36.8<br />

2010 5.3 36.6 41.9<br />

2015 5.4 41.6 47.0<br />

2020 5.6 46.5 52.1


Summer / Winter Approved Capacities<br />

were in Place for Avon Lake‟s WTP<br />

Based on a full-scale Demonstration study:<br />

• The Summer approved capacity was 40 MGD<br />

• The Winter approved capacity was 36 MGD<br />

(i.e., winter water production was not yet high<br />

enough to demonstrate 20 MGD through one of<br />

the two existing, 18-MGD rapid-mix units)


CT is more difficult to meet in the Winter<br />

• Winter CT req’d = 51 mg/L-min<br />

• Summer CT req’d = 27 mg/L-min<br />

• pH = 8<br />

• Temp: Winter = 0.5 C Summer = 10 C<br />

• Chlorine residual = 1.1 mg/L<br />

• 0.5-log inactivation of Giardia


Winter Clearwell Component Capacity was<br />

Limiting WTP Capacity<br />

Volume (MG)<br />

(@ min. Depth)<br />

Clearwells Clearwells All<br />

1-4 5-6 Clearwells<br />

0.4 1.0 1.4<br />

E.V.F 0.2 0.5<br />

Max CT Req’d 51 51<br />

Component<br />

Cap. (MGD)<br />

5 40 45


Equivalent Max.-day Capacities were really<br />

Challenging<br />

• Pk.-hour to Max.-day Ratio = 1.35<br />

• Therefore, Equiv. Max.-day Capacities were:<br />

45 MGD Max.-day<br />

X<br />

1 1.35 Pk.-hour<br />

= 33 MGD (winter)<br />

85 MGD Max.-day<br />

X<br />

1 1.35 Pk.-hour<br />

= 63 MGD (summer)


Without Seasonal Capacities: Ohio EPA<br />

Plan-approval Letter would have Stated . . .<br />

• Approved Capacity of Pretreatment at the WTP is 36 MGD<br />

• Equiv. Max.-day CT Capacity of the Clearwells is 33 MGD<br />

• Approved Capacity of WTP is 33 MGD<br />

51


With Seasonal Capacities:<br />

Ohio EPA Plan-approval Letter Stated . . .<br />

• Approved Capacity of Pretreatment at the WTP is 40 MGD<br />

Summer<br />

• Approved Capacity of Pretreatment at the WTP is 36 MGD<br />

Winter<br />

• Equiv. Max.-day CT Capacity of the Clearwells is 63 MGD<br />

Summer<br />

• Equiv. Max.-day CT Capacity of the Clearwells is 33 MGD<br />

Winter<br />

• Approved Capacity of WTP is 40 MGD Summer<br />

• Approved Capacity of WTP is 33 MGD Winter<br />

52


First Tracer Study was Performed<br />

on an Isolated Clearwell 5<br />

Sampling<br />

Point<br />

Central<br />

High<br />

North<br />

High<br />

4<br />

3<br />

2<br />

Clearwells<br />

1<br />

5 6<br />

F: 0 - 1.0 mg/L<br />

Sampling<br />

Point<br />

From Filters


8:00<br />

8:30<br />

9:00<br />

9:30<br />

10:00<br />

10:30<br />

11:00<br />

11:30<br />

12:00<br />

12:30<br />

13:00<br />

13:30<br />

14:00<br />

C/Co<br />

1<br />

Clearwell 5: Graphical Method<br />

0.9<br />

0.8<br />

0.7<br />

E.V.F. = 1.80 / 2.47 hrs = 0.73<br />

0.6<br />

0.5<br />

0.4<br />

0.3<br />

0.2<br />

T= 1.80 Hrs<br />

0.1<br />

0<br />

Time


log(1-C/Co)<br />

0.0<br />

Clearwell 5: Numerical Method<br />

-0.1<br />

-0.2<br />

-0.3<br />

-0.4<br />

-0.5<br />

-0.6<br />

-0.7<br />

E.V.F. = 0.785<br />

-0.8<br />

-0.9<br />

-1.0<br />

-1.1<br />

-1.2<br />

0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0<br />

t/T


Tracer Study on Clearwells 1 – 4<br />

was Performed Next<br />

Central<br />

High<br />

F 0.5 mg/L<br />

North<br />

High<br />

4<br />

3<br />

Sampling<br />

Point<br />

2<br />

Clearwells<br />

1<br />

5 6<br />

Sampling<br />

Point<br />

F 0.8 mg/L<br />

From Filters


12:00<br />

12:30<br />

13:00<br />

13:30<br />

14:00<br />

14:30<br />

15:00<br />

15:30<br />

16:00<br />

16:30<br />

17:00<br />

17:30<br />

18:00<br />

18:30<br />

19:00<br />

19:30<br />

20:00<br />

20:30<br />

21:00<br />

21:30<br />

22:00<br />

Fluoride (mg/L)<br />

Start 13:50<br />

15:22 (T10=92 min.)<br />

1.4<br />

Clearwells 1 - 4: Graphical Method<br />

1.3<br />

1.2<br />

1.1<br />

1<br />

0.9<br />

10% of Test Range<br />

0.8<br />

0.7<br />

0.6<br />

E.V.F. = 92 / 168 min = 0.55<br />

0.5<br />

Time<br />

Influent Effluent Avg. Inffl. 90% Retention Curve


log(1-C/Co)<br />

0<br />

Clearwells 1 - 4: Numerical Method<br />

-0.1<br />

-0.2<br />

-0.3<br />

-0.4<br />

-0.5<br />

-0.6<br />

E.V.F. = 0.55<br />

-0.7<br />

-0.8<br />

-0.9<br />

-1<br />

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 2.2 2.4 2.6<br />

t/<strong>To</strong><br />

log(1-C/Co) Linear T10


EVFs and Clearwell Component Capacity<br />

Increased After Tracer Studies<br />

Volume (MG)<br />

(@ min. Depth)<br />

Clearwells Clearwells All<br />

1-4 5-6 Clearwells<br />

0.4 1.0 2.2<br />

E.V.F. 0.55 0.7<br />

Max CT Req’d 51 51<br />

Component<br />

Cap. (MGD)<br />

14 55 69


Equivalent Max.-day Capacities were No<br />

Longer Challenging<br />

• Pk.-hour to Max.-day Ratio = 1.35<br />

• Therefore, Equiv. Max.-day Capacities are:<br />

69 MGD Max.-day<br />

X<br />

1 1.35 Pk.-hour<br />

= 51 MGD (winter)<br />

130 MGD Max.-day<br />

X<br />

1 1.35 Pk.-hour<br />

= 96 MGD (summer)


Without Seasonal Capacities: Ohio EPA<br />

Plan-approval Letter would have Stated . . .<br />

• Approved Capacity of Pretreatment at the WTP is 36 MGD<br />

• Equiv. Max.-day CT Capacity of the Clearwells is 51 MGD<br />

• Approved Capacity of WTP is 36 MGD<br />

61


With Seasonal Capacities:<br />

Ohio EPA Plan-approval Letter Stated . . .<br />

• Approved Capacity of Pretreatment at the WTP is 40 MGD<br />

Summer<br />

• Approved Capacity of Pretreatment at the WTP is 36 MGD<br />

Winter<br />

• Equiv. Max.-day CT Capacity of the Clearwells is 96 MGD<br />

Summer<br />

• Equiv. Max.-day CT Capacity of the Clearwells is 51 MGD<br />

Winter<br />

• Approved Capacity of WTP is 40 MGD Summer<br />

• Approved Capacity of WTP is 36 MGD Winter<br />

62


. . . Items that were Discussed <strong>To</strong>day<br />

• CT in Ohio EPA‟s Approved Capacity Document<br />

• Optimizing CT Credit in <strong>Your</strong> Clearwells<br />

• Lima‟s CT Credit <strong>Enhance</strong>ments<br />

• Avon Lake‟s Seasonal CT Credits

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!