05.11.2014 Views

TM 9-2320-260-34-2

TM 9-2320-260-34-2

TM 9-2320-260-34-2

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>TM</strong> 9-<strong>2320</strong>-<strong>260</strong>-<strong>34</strong>-2<br />

13-6. FRAME ALINEMENT INSPECTION (Contd)<br />

2. Tape one 8 x 10.5 in. (20 x 27 cm) sheet of white paper to floor under each front frame section (5).<br />

NOTE<br />

Ensure plumb bob string is placed flat against frame rails and free<br />

of obstructions such as bolts, rivets, brackets, and rear springs.<br />

Allow plumb bob to stop swinging before making mark on paper.<br />

3. Hold string and plumb bob to outside of frame rails (1) and above paper, Accurately locate point on<br />

paper directly below plumb bob.<br />

4. Carefully mark spot (6) on each paper directly below plumb bob point.<br />

13-25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!